In depth study of Malaysian standard form of construction contracts
The PWD forms of contract are the de facto standard forms of contraction contract used by the Malaysian public sector and most of these big scaled projects are publicfunded which makes government a major player in the construction industry. PWD standard form has gone through revision from PWD 203A F...
| Main Author: | Oh, Chin Phang |
|---|---|
| Format: | Final Year Project Report / IMRAD |
| Language: | English English |
| Published: |
Universiti Malaysia Sarawak, UNIMAS
2010
|
| Subjects: | |
| Online Access: | http://ir.unimas.my/id/eprint/7773/ http://ir.unimas.my/id/eprint/7773/1/In%20depth%20study%20of%20Malaysian%20standard%20form%20of%20construction%20contracts%20%2824pgs%29.pdf http://ir.unimas.my/id/eprint/7773/8/Oh%20Chin%20Phang.pdf |
Similar Items
A Comparative Study on the Readiness Parameters of Highway Construction Projects
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
AHP-based analysis of the risk assessment delay case study of public road construction project: An empirical study
by: Putri Zulaiha, Razi, et al.
Published: (2019)
by: Putri Zulaiha, Razi, et al.
Published: (2019)
Identification factor of constraint in road construction in Sabah
by: Nur Atika, Abd Rahman
Published: (2019)
by: Nur Atika, Abd Rahman
Published: (2019)
Design phase constructability concepts in highway projects
by: Hassan, Siti Hafizan
Published: (2005)
by: Hassan, Siti Hafizan
Published: (2005)
Identifying materials for road construction on peat soil
by: New Sarawak, Tribune
Published: (2015)
by: New Sarawak, Tribune
Published: (2015)
Decision making in highway construction: a systematic review and future directions
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021)
Chemical Stabilization of Clayey Soil with Polypropylene Fiber Reinforcement for Roadbase Construction
by: Ahmad Nasri, Abdul Rashid, et al.
Published: (2020)
by: Ahmad Nasri, Abdul Rashid, et al.
Published: (2020)
Engineering properties of Batu Pahat soft clay stabilized with lime, cement and bentonite for subgrade in road construction
by: Che Mamat, Rufaizal
Published: (2013)
by: Che Mamat, Rufaizal
Published: (2013)
Cause and effect of delay in construction project: A case study of road construction project in Malaysia
by: Tan, Chun Keong, et al.
Published: (2013)
by: Tan, Chun Keong, et al.
Published: (2013)
Influence of pavement condition towards accident number on Malaysian highway
by: Baskara, S. N., et al.
Published: (2019)
by: Baskara, S. N., et al.
Published: (2019)
Research study on inter-vehicle communication implementation in Malaysia
by: Mohd Fakhrul, Anwar Alias
Published: (2010)
by: Mohd Fakhrul, Anwar Alias
Published: (2010)
The evaluation of traffic operation based on travel time study
by: Guanning, Xu
Published: (2014)
by: Guanning, Xu
Published: (2014)
Motion detection and simulation study on human walking behavior
by: Loon, Cheong Wai
Published: (2012)
by: Loon, Cheong Wai
Published: (2012)
Privatization of road maintenance in Malaysia : a case study
by: Kumaraweh, Inthiran
Published: (2004)
by: Kumaraweh, Inthiran
Published: (2004)
Analysis the performance of unsignalized intersection based on gap acceptance studies
by: Syafiqah, Mohamed Salleh
Published: (2012)
by: Syafiqah, Mohamed Salleh
Published: (2012)
Case study of roadway visibility at Hulu Langat - Ampang Road
by: Suhana , Sufian
Published: (2013)
by: Suhana , Sufian
Published: (2013)
A study on automated traction control system of an electrical golf car
by: Rahman, Mohammed Ataur, et al.
Published: (2011)
by: Rahman, Mohammed Ataur, et al.
Published: (2011)
aintenance management consideration in highway operation case study : east coast expressway
by: Nur Aqlili Naqqiah, Mokhtar
Published: (2012)
by: Nur Aqlili Naqqiah, Mokhtar
Published: (2012)
Road maintenance management system
by: Lim, Sean Chin, et al.
Published: (2013)
by: Lim, Sean Chin, et al.
Published: (2013)
Exploring risk associated to public infrastructure projects case study of Kuala Terengganu Bypass
by: Nur Haisera, Idris
Published: (2019)
by: Nur Haisera, Idris
Published: (2019)
Case study: congestion at traffic signal of junction Jalan Bukit Ubi and Jalan Dato Lim Hoe Lek
by: Muhammad , Ali
Published: (2013)
by: Muhammad , Ali
Published: (2013)
An Investigation on Urban Circle Rail Transit: A Case Study on the Alignment of Mass Rapid Transit 3 (Circle Line)
by: A. A., Mohamed, et al.
Published: (2020)
by: A. A., Mohamed, et al.
Published: (2020)
The socio-economic impact of roads on rural communities : a case study on the longhouses communities of rumah ukan, rumah jandok and rumah bundong of ulu bukit guram-ulu yong road
by: Manjah, Frankie Bendindang
Published: (2005)
by: Manjah, Frankie Bendindang
Published: (2005)
Road safety: A case study of current situation in Malaysia
by: Lim, Chen Sim, et al.
Published: (2012)
by: Lim, Chen Sim, et al.
Published: (2012)
Investigation on the strength of the recycled asphalt pavement as a base material
by: Balachanter, Ramasamy
Published: (2010)
by: Balachanter, Ramasamy
Published: (2010)
Relationship between roadside features and road traffic accidents along KM 3 - KM 27 of Jalan Kuantan-Gambang
by: Marzida, Abdul Manaf
Published: (2010)
by: Marzida, Abdul Manaf
Published: (2010)
Guide signs for approach roads to UMP
by: Tan, Boon Kei
Published: (2010)
by: Tan, Boon Kei
Published: (2010)
Influence of recycled HDPE as partial coarse aggregate replacement on permanent deformation of modified asphalt mixture
by: Wan Rohaya, Wan Idris
Published: (2010)
by: Wan Rohaya, Wan Idris
Published: (2010)
The evaluation of marshall properties of oil palm fly ash (OPFASH) as a filler material in acw 20 hot mix asphalt (HMA)
by: Henrietta Ramus, Anak Henry Makim
Published: (2010)
by: Henrietta Ramus, Anak Henry Makim
Published: (2010)
Evaluating life cycle cost and performance comparison between cold in place recycling and reconstruction method
by: Wan Omar, Wan Imran, et al.
Published: (2014)
by: Wan Omar, Wan Imran, et al.
Published: (2014)
Identiti kawasan Rehat dan Rawat (R&R) di lebuhraya Utara - Selatan (R&R Tapah, R&R Sungai Perak Dan R&R Gunung Semanggol, Perak Darul Ridzuan) / Nadiyanti Mat Nayan and Norhafizah Abdul Rahman
by: Mat Nayan, Nadiyanti, et al.
Published: (2006)
by: Mat Nayan, Nadiyanti, et al.
Published: (2006)
Development of flexible pavement design tool based on Jabatan Kerja Raya (JKR)’s revised guideline/ Mohamad Irwan P. Harahap
by: Harahap, Mohamad Irwan P., et al.
Published: (2017)
by: Harahap, Mohamad Irwan P., et al.
Published: (2017)
Statistical analysis for removal of cadmium from aqueous solution at high pH
by: Kabbashi, Naseereldeen Ahmed, et al.
Published: (2011)
by: Kabbashi, Naseereldeen Ahmed, et al.
Published: (2011)
Relationship between short duration and daily rainfall data in Kuala Lumpur
by: Salleh, Md. Noor, et al.
Published: (2013)
by: Salleh, Md. Noor, et al.
Published: (2013)
Influence of Recycled High Density Polyethylene on the Conventional and Morphology Properties of Bitumen
by: Wan Mohd Nazmi, Wan Abdul Rahman, et al.
Published: (2011)
by: Wan Mohd Nazmi, Wan Abdul Rahman, et al.
Published: (2011)
The evaluation on the performances of a roundabout at Taman Tas, Kuantan
by: Khairun Nadrah, Hamidzon
Published: (2012)
by: Khairun Nadrah, Hamidzon
Published: (2012)
Analysis the performance of signalized intersection by using sidra
by: Ahmad Faiz, Nasir
Published: (2012)
by: Ahmad Faiz, Nasir
Published: (2012)
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012)
by: Amrina, Abu Bakar
Published: (2012)
Bus monioring system (hardware part)
by: Nasrung, Nurba
Published: (2008)
by: Nasrung, Nurba
Published: (2008)
Lane markings detection based on e-maxima transformation and improved hough
by: Xiao, Rui
Published: (2012)
by: Xiao, Rui
Published: (2012)
Similar Items
-
A Comparative Study on the Readiness Parameters of Highway Construction Projects
by: Nur Afiqah, Mohd Radzi, et al.
Published: (2021) -
AHP-based analysis of the risk assessment delay case study of public road construction project: An empirical study
by: Putri Zulaiha, Razi, et al.
Published: (2019) -
Identification factor of constraint in road construction in Sabah
by: Nur Atika, Abd Rahman
Published: (2019) -
Design phase constructability concepts in highway projects
by: Hassan, Siti Hafizan
Published: (2005) -
Identifying materials for road construction on peat soil
by: New Sarawak, Tribune
Published: (2015)