Project evaluation : a case study of cost reduction in changing machine design

The Palong Coco Mill Company has high investment in machinery, labor and time management. This is a main constraint for company to achieve the objective and goal. The project evaluation study on the current setup (horizontal sterilizer and a new system setup (vertical sterilizer) to determine which...

Full description

Bibliographic Details
Main Author: Sarimah, Mat Hashim
Format: Final Year Project Report / IMRAD
Language:English
English
Published: Universiti Malaysia Sarawak, UNIMAS 2006
Subjects:
Online Access:http://ir.unimas.my/id/eprint/5615/
http://ir.unimas.my/id/eprint/5615/1/PROJECT%20EVALUATION-A%20CASE%20STUDY%20OF%20COST%20REDUCTION%20IN%20CHANGING%20MACHINE%20DESIGN%2824pgs%29.pdf
http://ir.unimas.my/id/eprint/5615/8/Sarimah%20Mat%20Hashim.pdf
_version_ 1848835710823432192
author Sarimah, Mat Hashim
author_facet Sarimah, Mat Hashim
author_sort Sarimah, Mat Hashim
building UNIMAS Institutional Repository
collection Online Access
description The Palong Coco Mill Company has high investment in machinery, labor and time management. This is a main constraint for company to achieve the objective and goal. The project evaluation study on the current setup (horizontal sterilizer and a new system setup (vertical sterilizer) to determine which plant configuration can stand in long time and short time to reduce cost investment.
first_indexed 2025-11-15T06:12:12Z
format Final Year Project Report / IMRAD
id unimas-5615
institution Universiti Malaysia Sarawak
institution_category Local University
language English
English
last_indexed 2025-11-15T06:12:12Z
publishDate 2006
publisher Universiti Malaysia Sarawak, UNIMAS
recordtype eprints
repository_type Digital Repository
spelling unimas-56152024-03-07T02:41:52Z http://ir.unimas.my/id/eprint/5615/ Project evaluation : a case study of cost reduction in changing machine design Sarimah, Mat Hashim TJ Mechanical engineering and machinery The Palong Coco Mill Company has high investment in machinery, labor and time management. This is a main constraint for company to achieve the objective and goal. The project evaluation study on the current setup (horizontal sterilizer and a new system setup (vertical sterilizer) to determine which plant configuration can stand in long time and short time to reduce cost investment. Universiti Malaysia Sarawak, UNIMAS 2006 Final Year Project Report / IMRAD NonPeerReviewed text en http://ir.unimas.my/id/eprint/5615/1/PROJECT%20EVALUATION-A%20CASE%20STUDY%20OF%20COST%20REDUCTION%20IN%20CHANGING%20MACHINE%20DESIGN%2824pgs%29.pdf text en http://ir.unimas.my/id/eprint/5615/8/Sarimah%20Mat%20Hashim.pdf Sarimah, Mat Hashim (2006) Project evaluation : a case study of cost reduction in changing machine design. [Final Year Project Report / IMRAD] (Unpublished)
spellingShingle TJ Mechanical engineering and machinery
Sarimah, Mat Hashim
Project evaluation : a case study of cost reduction in changing machine design
title Project evaluation : a case study of cost reduction in changing machine design
title_full Project evaluation : a case study of cost reduction in changing machine design
title_fullStr Project evaluation : a case study of cost reduction in changing machine design
title_full_unstemmed Project evaluation : a case study of cost reduction in changing machine design
title_short Project evaluation : a case study of cost reduction in changing machine design
title_sort project evaluation : a case study of cost reduction in changing machine design
topic TJ Mechanical engineering and machinery
url http://ir.unimas.my/id/eprint/5615/
http://ir.unimas.my/id/eprint/5615/1/PROJECT%20EVALUATION-A%20CASE%20STUDY%20OF%20COST%20REDUCTION%20IN%20CHANGING%20MACHINE%20DESIGN%2824pgs%29.pdf
http://ir.unimas.my/id/eprint/5615/8/Sarimah%20Mat%20Hashim.pdf