Determination of civil engineering construction time duration
This research will analyze and compare the theoretical methods applied in case studies, drawing out their differences and similarities. This research also seeks to draw out the problem encountered of each case study in estimating time. This research will also looks into the suitability and effective...
| Main Author: | |
|---|---|
| Format: | Final Year Project Report / IMRAD |
| Language: | English |
| Published: |
University Malaysia Sarawak, (UNIMAS)
2006
|
| Subjects: | |
| Online Access: | http://ir.unimas.my/id/eprint/2824/ http://ir.unimas.my/id/eprint/2824/7/DETERMINATION%20OF%20CIVIL%20ENGINEERING%20CONSTRUCTION%20TIME%20DURATION%28OCR%29%20dlm%20IR.pdf |
| _version_ | 1848835078110576640 |
|---|---|
| author | Chong, C.T |
| author_facet | Chong, C.T |
| author_sort | Chong, C.T |
| building | UNIMAS Institutional Repository |
| collection | Online Access |
| description | This research will analyze and compare the theoretical methods applied in case studies, drawing out their differences and similarities. This research also seeks to draw out the problem encountered of each case study in estimating time. This research will also looks into the suitability and effectiveness of each method in determining projects' duration. |
| first_indexed | 2025-11-15T06:02:09Z |
| format | Final Year Project Report / IMRAD |
| id | unimas-2824 |
| institution | Universiti Malaysia Sarawak |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T06:02:09Z |
| publishDate | 2006 |
| publisher | University Malaysia Sarawak, (UNIMAS) |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | unimas-28242023-02-09T08:22:59Z http://ir.unimas.my/id/eprint/2824/ Determination of civil engineering construction time duration Chong, C.T TA Engineering (General). Civil engineering (General) This research will analyze and compare the theoretical methods applied in case studies, drawing out their differences and similarities. This research also seeks to draw out the problem encountered of each case study in estimating time. This research will also looks into the suitability and effectiveness of each method in determining projects' duration. University Malaysia Sarawak, (UNIMAS) 2006 Final Year Project Report / IMRAD NonPeerReviewed text en http://ir.unimas.my/id/eprint/2824/7/DETERMINATION%20OF%20CIVIL%20ENGINEERING%20CONSTRUCTION%20TIME%20DURATION%28OCR%29%20dlm%20IR.pdf Chong, C.T (2006) Determination of civil engineering construction time duration. [Final Year Project Report / IMRAD] (Unpublished) |
| spellingShingle | TA Engineering (General). Civil engineering (General) Chong, C.T Determination of civil engineering construction time duration |
| title | Determination of civil engineering construction time duration |
| title_full | Determination of civil engineering construction time duration |
| title_fullStr | Determination of civil engineering construction time duration |
| title_full_unstemmed | Determination of civil engineering construction time duration |
| title_short | Determination of civil engineering construction time duration |
| title_sort | determination of civil engineering construction time duration |
| topic | TA Engineering (General). Civil engineering (General) |
| url | http://ir.unimas.my/id/eprint/2824/ http://ir.unimas.my/id/eprint/2824/7/DETERMINATION%20OF%20CIVIL%20ENGINEERING%20CONSTRUCTION%20TIME%20DURATION%28OCR%29%20dlm%20IR.pdf |