Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects

Even though the construction industry is very competitive, it is currently very labor intensive. As such the Malaysian Government has been continuously encouraging the industry to use the Industrialised Building System (IBS), which is considered to be an important part of modern method construction...

Full description

Bibliographic Details
Main Authors: Nawi, M.N.M, Shaharanee, I.N.M, Hashim, K.F., Azman, M.N.A., Ibrahim, S.H.
Format: Article
Published: American Scientific Publishers 2015
Subjects:
Online Access:http://ir.unimas.my/id/eprint/12731/
_version_ 1848837262822866944
author Nawi, M.N.M
Shaharanee, I.N.M
Hashim, K.F.
Azman, M.N.A.
Ibrahim, S.H.
author_facet Nawi, M.N.M
Shaharanee, I.N.M
Hashim, K.F.
Azman, M.N.A.
Ibrahim, S.H.
author_sort Nawi, M.N.M
building UNIMAS Institutional Repository
collection Online Access
description Even though the construction industry is very competitive, it is currently very labor intensive. As such the Malaysian Government has been continuously encouraging the industry to use the Industrialised Building System (IBS), which is considered to be an important part of modern method construction approach. However, the system has so far failed to gather momentum especially among the private construction projects. Accordingly, many studies have been conducted for identifying the factors that contributed to this problem. However, the previous studies mostly focused on the qualitative data whereas the finding has limited discuss on ‘how’ and ‘why’ of the problem happened. Based on the findings from the industry workshop, this paper discusses the identified barriers with the aim of examining how far these barriers may well affect the process of IBS implementation in the Malaysian construction industry.
first_indexed 2025-11-15T06:36:52Z
format Article
id unimas-12731
institution Universiti Malaysia Sarawak
institution_category Local University
last_indexed 2025-11-15T06:36:52Z
publishDate 2015
publisher American Scientific Publishers
recordtype eprints
repository_type Digital Repository
spelling unimas-127312016-08-01T03:41:02Z http://ir.unimas.my/id/eprint/12731/ Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects Nawi, M.N.M Shaharanee, I.N.M Hashim, K.F. Azman, M.N.A. Ibrahim, S.H. TA Engineering (General). Civil engineering (General) TH Building construction Even though the construction industry is very competitive, it is currently very labor intensive. As such the Malaysian Government has been continuously encouraging the industry to use the Industrialised Building System (IBS), which is considered to be an important part of modern method construction approach. However, the system has so far failed to gather momentum especially among the private construction projects. Accordingly, many studies have been conducted for identifying the factors that contributed to this problem. However, the previous studies mostly focused on the qualitative data whereas the finding has limited discuss on ‘how’ and ‘why’ of the problem happened. Based on the findings from the industry workshop, this paper discusses the identified barriers with the aim of examining how far these barriers may well affect the process of IBS implementation in the Malaysian construction industry. American Scientific Publishers 2015 Article PeerReviewed Nawi, M.N.M and Shaharanee, I.N.M and Hashim, K.F. and Azman, M.N.A. and Ibrahim, S.H. (2015) Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects. Advanced Science Letters, 21 (6). pp. 2134-2138. ISSN 1936-6612 https://www.scopus.com/record/display.uri?eid=2-s2.0-84946920343&origin=inward&txGid=0# DOI: 10.1166/asl.2015.6233
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Nawi, M.N.M
Shaharanee, I.N.M
Hashim, K.F.
Azman, M.N.A.
Ibrahim, S.H.
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
title Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
title_full Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
title_fullStr Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
title_full_unstemmed Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
title_short Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
title_sort qualitative analysis on the barriers of industrialised building system (ibs) uptake in malaysian construction projects
topic TA Engineering (General). Civil engineering (General)
TH Building construction
url http://ir.unimas.my/id/eprint/12731/
http://ir.unimas.my/id/eprint/12731/
http://ir.unimas.my/id/eprint/12731/