Feasibility study for green energy island : final report, Vol.
This report consists of narrowing down more than 200 off grid sites based on the report by Kementerian Kemajuan Luar Bandar dan Wilayah (KKLW), Sarawak Energy Berhad (SEB) and Jabatan Kerja Raya (JKR) Sarawak to ten (10) sites that may have the potential for the GEI project implementation. The si...
| Main Authors: | , , , , , , |
|---|---|
| Format: | Book |
| Language: | English |
| Published: |
Universiti Malaysia Sarawak, (UNIMAS)
2013
|
| Subjects: | |
| Online Access: | http://ir.unimas.my/id/eprint/12611/ http://ir.unimas.my/id/eprint/12611/1/Feasibility%20study%20for%20Green%20Energy%20Island%20Vol%201.pdf |
| Summary: | This report consists of narrowing down more than 200 off grid sites based on the
report by Kementerian Kemajuan Luar Bandar dan Wilayah (KKLW), Sarawak Energy
Berhad (SEB) and Jabatan Kerja Raya (JKR) Sarawak to ten (10) sites that may have
the potential for the GEI project implementation. The site investigations are carried out
through rigorous and extensive site visits over eight (8) months period. Details of these
site studies are presented in this report, covering the background of the selected sites,
demographic data and technical data that includes hydrological data and load demand
analysis. |
|---|