Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES

Bibliographic Details
Main Author: Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC)
Format: Report
Language:English
Published: Universiti Malaysia Sarawak, (UNIMAS) 2006
Subjects:
Online Access:http://ir.unimas.my/id/eprint/11060/
http://ir.unimas.my/id/eprint/11060/1/Environmental%20impact%20assesment%20%3B%20the%20proposed%2013.3%20km%20revised%20route%20of%20federal%20administrative%20centre%20accesss%20road%2C%20Kuching%20division%2C%20Sarawak.%20TEMPORARY%20ENVIRONMENTAL%20GUIDELINES.pdf
_version_ 1848836925935321088
author Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC)
author_facet Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC)
author_sort Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC)
building UNIMAS Institutional Repository
collection Online Access
first_indexed 2025-11-15T06:31:31Z
format Report
id unimas-11060
institution Universiti Malaysia Sarawak
institution_category Local University
language English
last_indexed 2025-11-15T06:31:31Z
publishDate 2006
publisher Universiti Malaysia Sarawak, (UNIMAS)
recordtype eprints
repository_type Digital Repository
spelling unimas-110602021-10-11T01:49:52Z http://ir.unimas.my/id/eprint/11060/ Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC) A34 Universiti Malaysia Sarawak -- Periodicals --report Universiti Malaysia Sarawak, (UNIMAS) 2006 Report NonPeerReviewed text en http://ir.unimas.my/id/eprint/11060/1/Environmental%20impact%20assesment%20%3B%20the%20proposed%2013.3%20km%20revised%20route%20of%20federal%20administrative%20centre%20accesss%20road%2C%20Kuching%20division%2C%20Sarawak.%20TEMPORARY%20ENVIRONMENTAL%20GUIDELINES.pdf Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC) (2006) Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES. [Report]
spellingShingle A34 Universiti Malaysia Sarawak -- Periodicals --report
Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultacy (CTTC)
Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES
title Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES
title_full Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES
title_fullStr Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES
title_full_unstemmed Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES
title_short Environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, Kuching division, Sarawak (4-Lane dual carriageway with paved shoulder) TEMPORARY ENVIRONMENTAL GUIDELINES
title_sort environmental impact assesment : the proposed 13.3 km revised route of federal administrative centre accesss road, kuching division, sarawak (4-lane dual carriageway with paved shoulder) temporary environmental guidelines
topic A34 Universiti Malaysia Sarawak -- Periodicals --report
url http://ir.unimas.my/id/eprint/11060/
http://ir.unimas.my/id/eprint/11060/1/Environmental%20impact%20assesment%20%3B%20the%20proposed%2013.3%20km%20revised%20route%20of%20federal%20administrative%20centre%20accesss%20road%2C%20Kuching%20division%2C%20Sarawak.%20TEMPORARY%20ENVIRONMENTAL%20GUIDELINES.pdf