Comparative study in construction scheduling by using primavera P6 and microsoft project
Construction industry has played a very important role in contributing to the development of infrastructure and economic in Malaysia since the past. In 1998, Malaysia grew rapidly when the pride of Malaysia's landmark which is known as Petronas Twin Tower or Kuala Lumpur Convention Centre (KLCC...
| Main Author: | Nor Farahin, Baharudin |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/9382/ http://umpir.ump.edu.my/id/eprint/9382/1/NOR%20FARAHIN%20BINTI%20BAHARUDIN.PDF |
Similar Items
Planning & scheduling by using Microsoft Project a case study of "suggestion for construction and completion the Science Department for University Islam Antarabangsa Malaysia, Bandar Indera Mahkota, Kuantan, Pahang"
by: Mohd Johari, Othman
Published: (2006)
by: Mohd Johari, Othman
Published: (2006)
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
The effectiveness of Microsoft Project in assessing extension of
time under PAM 2006 standard form of contract
by: Suhaida @ Suhana, Kamarudin Nurul Aini Osman*, et al.
Published: (2017)
by: Suhaida @ Suhana, Kamarudin Nurul Aini Osman*, et al.
Published: (2017)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008)
by: Mohamad Zin, Rosli, et al.
Published: (2008)
Impact of unplanned schedule compression on project cost
by: Mansur, Shaiful Amri, et al.
Published: (2006)
by: Mansur, Shaiful Amri, et al.
Published: (2006)
A study on schedule management for BIM projects in the construction industry
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
by: Soon Ern, Peniel Ang, et al.
Published: (2018)
Understanding Management Roles and Organisational Behaviours
in Planning and Scheduling Based on Construction Projects in
Oman
by: Nasseri , Hammad Al, et al.
Published: (2016)
by: Nasseri , Hammad Al, et al.
Published: (2016)
Process flow for work breakdown structure in plannning and scheduling : a comparative case study
by: Nurulzanna, Idris
Published: (2014)
by: Nurulzanna, Idris
Published: (2014)
A study of project delay in Sudan construction industry
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
by: Mohamed, Mohamed Babikir Ibrahiem
Published: (2015)
Determining the basic principles in managing project schedule for construction.
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010)
A Study on Quality Management System (QMS) Applied in Construction Project
by: Thong, Mei Poh
Published: (2016)
by: Thong, Mei Poh
Published: (2016)
The Significant Risks In Small Scale Construction Projects
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
by: Nur Sharkila, Muhammad Shukri, et al.
Published: (2016)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
Application of drone in visual inspection for construction project
by: Adam Zakwan, Zainuddin
Published: (2015)
by: Adam Zakwan, Zainuddin
Published: (2015)
Causes and effects of poor communication in construction projects
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
by: Rageh Gamil, Yaser Mohammed
Published: (2020)
Managing construction of telecommunication tower projects in Celcom
by: Pison, Zirwatul Hana
Published: (2007)
by: Pison, Zirwatul Hana
Published: (2007)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
The Impact of Material Management on Construction Project Delivery in Maldives
by: Zaha, Ahmed
Published: (2017)
by: Zaha, Ahmed
Published: (2017)
Influential factors affecting materials management in construction projects
by: Mat Jusoh, Zairra, et al.
Published: (2017)
by: Mat Jusoh, Zairra, et al.
Published: (2017)
Causes of low-skilled workers’ performance in construction projects
by: Alhaji Ali, Zannah, et al.
Published: (2017)
by: Alhaji Ali, Zannah, et al.
Published: (2017)
Examining unethical professional practices in construction projects in Malaysia
by: Tan, Ke Ling
Published: (2021)
by: Tan, Ke Ling
Published: (2021)
Construction planning and scheduling a case study of "Cadangan membina dan menyiapkan Kulliyyah Sains untuk Universiti Islam Antarabangsa Malaysia
by: Mohd Khalild, Abdul Kadir
Published: (2006)
by: Mohd Khalild, Abdul Kadir
Published: (2006)
Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
by: Lim, Celia Han Jia
Published: (2014)
by: Lim, Celia Han Jia
Published: (2014)
An Investigation On The Awareness Of Sustainability Concept In Construction Projects: A Case Of Nigerian Students In The Construction Field.
by: Hadiza, Lawal Mayere
Published: (2016)
by: Hadiza, Lawal Mayere
Published: (2016)
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019)
by: Yap, Zhi Shan, et al.
Published: (2019)
Partnering between main contractors and sub-contractors in construction projects
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Assessment of Environmental Risks in Construction Projects: A Case of Malaysia
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Composition and Characteristics of Construction Waste
Generated by Residential Housing Project
by: Lau, H.H, et al.
Published: (2008)
by: Lau, H.H, et al.
Published: (2008)
Project communication aspects on construction performance: Investigating contractors’ perspective
by: Yu, Chooi Yi
Published: (2022)
by: Yu, Chooi Yi
Published: (2022)
Readiness of digital technology adoption in the Malaysian construction project management
by: Ong, Jiun Ren
Published: (2020)
by: Ong, Jiun Ren
Published: (2020)
A study on impact of employee training on project performance in construction industry in Kota Bharu, Kelantan
by: Nik Alia Haifaa, Nik Adik
Published: (2014)
by: Nik Alia Haifaa, Nik Adik
Published: (2014)
A study on the design changes affecting the construction project: point of view from contractor perspective
by: Mohd Harisuddin, Hasnan
Published: (2018)
by: Mohd Harisuddin, Hasnan
Published: (2018)
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010)
by: Mohammad Solhi, Mohammed
Published: (2010)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Similar Items
-
Planning & scheduling by using Microsoft Project a case study of "suggestion for construction and completion the Science Department for University Islam Antarabangsa Malaysia, Bandar Indera Mahkota, Kuantan, Pahang"
by: Mohd Johari, Othman
Published: (2006) -
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014) -
The effectiveness of Microsoft Project in assessing extension of
time under PAM 2006 standard form of contract
by: Suhaida @ Suhana, Kamarudin Nurul Aini Osman*, et al.
Published: (2017) -
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016) -
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008)