Process flow for work breakdown structure in plannning and scheduling : a comparative case study
Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing th...
| Main Author: | Nurulzanna, Idris |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/9319/ http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF |
Similar Items
Comparative study in construction scheduling by using primavera P6 and microsoft project
by: Nor Farahin, Baharudin
Published: (2014)
by: Nor Farahin, Baharudin
Published: (2014)
Transport Plannning Decision-making
by: Curtis, Carey
Published: (2017)
by: Curtis, Carey
Published: (2017)
Work process in building construction : a case study of Kelantan Trade Center (KTC)
by: Mohd Afnan, Abdullah
Published: (2006)
by: Mohd Afnan, Abdullah
Published: (2006)
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
by: Nor Hashimah, Mohd Fuzi
Published: (2014)
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008)
by: Mohamad Zin, Rosli, et al.
Published: (2008)
Impact of unplanned schedule compression on project cost
by: Mansur, Shaiful Amri, et al.
Published: (2006)
by: Mansur, Shaiful Amri, et al.
Published: (2006)
The effect multiple lightning impulse on the electrical breakdown voltage insulation resistance and isolation capacitance characteristics an opto-isolator as a low voltage surge protective device
by: Abdul Hamid, Mohd. Fairuz
Published: (2007)
by: Abdul Hamid, Mohd. Fairuz
Published: (2007)
Construction planning and scheduling a case study of "Cadangan membina dan menyiapkan Kulliyyah Sains untuk Universiti Islam Antarabangsa Malaysia
by: Mohd Khalild, Abdul Kadir
Published: (2006)
by: Mohd Khalild, Abdul Kadir
Published: (2006)
Study on building information modeling (BIM) process flow in construction industry: a model exploratory approach to research
by: Nurulashikin, Daud
Published: (2014)
by: Nurulashikin, Daud
Published: (2014)
Planning & scheduling by using Microsoft Project a case study of "suggestion for construction and completion the Science Department for University Islam Antarabangsa Malaysia, Bandar Indera Mahkota, Kuantan, Pahang"
by: Mohd Johari, Othman
Published: (2006)
by: Mohd Johari, Othman
Published: (2006)
Architectural project management success : a comparative case study between Yemen and Malaysia / Mohammed Hatim Mohammed Al-Sabahi
by: Al-Sabahi, Mohammed Hatim Mohammed
Published: (2014)
by: Al-Sabahi, Mohammed Hatim Mohammed
Published: (2014)
Building structure works estimation program – BEST’s
by: Mohd Sarman, Asmawan, et al.
Published: (2008)
by: Mohd Sarman, Asmawan, et al.
Published: (2008)
A comparative study of BIM and CAD (architecture)
by: Khairun Nisa, Affandi
Published: (2014)
by: Khairun Nisa, Affandi
Published: (2014)
A comparative analysis between Shariah compliant and conventional contract provisions for construction works
by: Abdul Rashid, Khairuddin, et al.
Published: (2015)
by: Abdul Rashid, Khairuddin, et al.
Published: (2015)
Framework for integrating sustainability into the project planning process for buildings: The case of Malaysia
/ Nor Kalsum Mohd Isa
by: Mohd Isa, Nor Kalsum
Published: (2015)
by: Mohd Isa, Nor Kalsum
Published: (2015)
Risk assessment for demoliition works in Malaysia
by: Nor Rizman, Abas
Published: (2010)
by: Nor Rizman, Abas
Published: (2010)
Hidden Cost In Building Conservation Works
by: Wee, Li Woon
Published: (2011)
by: Wee, Li Woon
Published: (2011)
Selection of contractor by Using Analytical Hierarchy Process (AHP)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
Selection of Best Consultant by using Analytical Hierarchy Process (AHP)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
A methodological analysis of demolition works in Malaysia
by: Abdullah, Arham, et al.
Published: (2008)
by: Abdullah, Arham, et al.
Published: (2008)
A Comparative User-Friendly Study of Vertical Aquaponic Designs For Building Balconies
by: Yeoh, Weng Hong
Published: (2016)
by: Yeoh, Weng Hong
Published: (2016)
Pengukuran kuantiti bangunan: berserta contoh kerja berdasarkan SMM 2 (measurement of building works with worked examples based on SMM 2)
by: Abdullah, Ahamad, et al.
Published: (2003)
by: Abdullah, Ahamad, et al.
Published: (2003)
Level of awareness for wind flow assessment in urban development (Malaysia)
by: Ng, Soo Nee @ Kerry Ng
Published: (2010)
by: Ng, Soo Nee @ Kerry Ng
Published: (2010)
Appraising policies on joint ventures for construction work in Malaysia
by: Abdul Rashid, Khairuddin
Published: (2009)
by: Abdul Rashid, Khairuddin
Published: (2009)
Enablers and Barriers to Project Planning and Scheduling Based on
Construction Projects in Oman
by: Nasseri, Hammad Al, et al.
Published: (2016)
by: Nasseri, Hammad Al, et al.
Published: (2016)
Malaysian labour productivity for reinforced concrete structural frame: a case study
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Shari'ah compliant contract: concept and application for construction works
by: Abdul Rashid, Khairuddin
Published: (2008)
by: Abdul Rashid, Khairuddin
Published: (2008)
Factor of work accident in Indonesian construction site: Medan, Indonesia
by: Teuku Muhammad Johan, Teuku Muhammad Zulfadly
Published: (2017)
by: Teuku Muhammad Johan, Teuku Muhammad Zulfadly
Published: (2017)
Efficiency in construction process
by: Muhammad Muslim , Ramle
Published: (2012)
by: Muhammad Muslim , Ramle
Published: (2012)
Study on the improvement code of practices in structural design and material specifications
by: Nurul Atiqah , Ajis
Published: (2012)
by: Nurul Atiqah , Ajis
Published: (2012)
A model of working from home (WFH) concept in Malaysian construction industry.
by: Hassan, Hasnanywati
Published: (2014)
by: Hassan, Hasnanywati
Published: (2014)
Assessment of building structure opening for dwelling
by: Marziatulhikmah, Maslan
Published: (2010)
by: Marziatulhikmah, Maslan
Published: (2010)
Revised Extension of Time Clause In Pam Form 2006 Compared To Pam Form 1998
by: Liaw, Kok Cheng
Published: (2012)
by: Liaw, Kok Cheng
Published: (2012)
Understanding Management Roles and Organisational Behaviours
in Planning and Scheduling Based on Construction Projects in
Oman
by: Nasseri , Hammad Al, et al.
Published: (2016)
by: Nasseri , Hammad Al, et al.
Published: (2016)
A Study Of Steel Structure Design & Build System In Construction Industry
by: Sheng, Lee Kok
Published: (2015)
by: Sheng, Lee Kok
Published: (2015)
EAS 254E(3) - STRUCTURAL ANALYSIS
EAS 253E(3) - ANALISIS STRUCTUR MAC 05
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2005)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2005)
Quality Planning Process Of Construction Contractors: Case Studies
In Sri Lanka
by: Senaratne, Sepani, et al.
Published: (2012)
by: Senaratne, Sepani, et al.
Published: (2012)
Technology of crack detection in reinforced concrete structures
by: Wan ]usoh, Wan Amizah, et al.
Published: (2020)
by: Wan ]usoh, Wan Amizah, et al.
Published: (2020)
Building and Infra-Structural Design and Facilities for The Disabled
by: Chin, Sin Lin
Published: (2011)
by: Chin, Sin Lin
Published: (2011)
Accessibility For Working Women In An Urban Environment: Case Study Of The Komtar Mixed-Use Development Area In Penang
by: Yeong , Yoong Chia
Published: (2006)
by: Yeong , Yoong Chia
Published: (2006)
Similar Items
-
Comparative study in construction scheduling by using primavera P6 and microsoft project
by: Nor Farahin, Baharudin
Published: (2014) -
Transport Plannning Decision-making
by: Curtis, Carey
Published: (2017) -
Work process in building construction : a case study of Kelantan Trade Center (KTC)
by: Mohd Afnan, Abdullah
Published: (2006) -
Planning & scheduling for construction project: a case study of duration estimation & influence factors
by: Nor Hashimah, Mohd Fuzi
Published: (2014) -
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008)