Projection on pavement life time for FR 222 access road to Gambang toll

Flexible pavements in Malaysia are designed until 1.0 to 15 years design life to support load from the vehicles. Sometimes these roads are not able to carry the load with the specified design life. The proposed study area that is looking at is FR 222 access road to Gambang Toll. From the observation...

Full description

Bibliographic Details
Main Author: Amrina, Abu Bakar
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/7860/
http://umpir.ump.edu.my/id/eprint/7860/1/AMRINA_BINTI_ABU_BAKAR.PDF
_version_ 1848818107352612864
author Amrina, Abu Bakar
author_facet Amrina, Abu Bakar
author_sort Amrina, Abu Bakar
building UMP Institutional Repository
collection Online Access
description Flexible pavements in Malaysia are designed until 1.0 to 15 years design life to support load from the vehicles. Sometimes these roads are not able to carry the load with the specified design life. The proposed study area that is looking at is FR 222 access road to Gambang Toll. From the observation, the condition of pavement of FR 222 (access road to Gambang Toll & UMP) is sub-standard. It is because the road was gazette as industrial. access prior to the opening, of Garnbang Toil Plaza and UMP and these resulted in uneven pavement surface that inconvenient to road users. The objectives of this study are to estimate the thickness of pavement on FR 222 access road to Gambang Toll using Arahan Teknik (Jalan) 5185, Manual on Pavement Design, Jabatan Kerja Raya and to formulate pavement lifetime 'based on failure analysis of flexible pavement. Traffic volume count, interview survey and visual inspection are conducted on this study to accomplish and achieved the study objectives.
first_indexed 2025-11-15T01:32:24Z
format Undergraduates Project Papers
id ump-7860
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T01:32:24Z
publishDate 2012
recordtype eprints
repository_type Digital Repository
spelling ump-78602021-06-11T07:54:27Z http://umpir.ump.edu.my/id/eprint/7860/ Projection on pavement life time for FR 222 access road to Gambang toll Amrina, Abu Bakar TE Highway engineering. Roads and pavements Flexible pavements in Malaysia are designed until 1.0 to 15 years design life to support load from the vehicles. Sometimes these roads are not able to carry the load with the specified design life. The proposed study area that is looking at is FR 222 access road to Gambang Toll. From the observation, the condition of pavement of FR 222 (access road to Gambang Toll & UMP) is sub-standard. It is because the road was gazette as industrial. access prior to the opening, of Garnbang Toil Plaza and UMP and these resulted in uneven pavement surface that inconvenient to road users. The objectives of this study are to estimate the thickness of pavement on FR 222 access road to Gambang Toll using Arahan Teknik (Jalan) 5185, Manual on Pavement Design, Jabatan Kerja Raya and to formulate pavement lifetime 'based on failure analysis of flexible pavement. Traffic volume count, interview survey and visual inspection are conducted on this study to accomplish and achieved the study objectives. 2012 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/7860/1/AMRINA_BINTI_ABU_BAKAR.PDF Amrina, Abu Bakar (2012) Projection on pavement life time for FR 222 access road to Gambang toll. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.
spellingShingle TE Highway engineering. Roads and pavements
Amrina, Abu Bakar
Projection on pavement life time for FR 222 access road to Gambang toll
title Projection on pavement life time for FR 222 access road to Gambang toll
title_full Projection on pavement life time for FR 222 access road to Gambang toll
title_fullStr Projection on pavement life time for FR 222 access road to Gambang toll
title_full_unstemmed Projection on pavement life time for FR 222 access road to Gambang toll
title_short Projection on pavement life time for FR 222 access road to Gambang toll
title_sort projection on pavement life time for fr 222 access road to gambang toll
topic TE Highway engineering. Roads and pavements
url http://umpir.ump.edu.my/id/eprint/7860/
http://umpir.ump.edu.my/id/eprint/7860/1/AMRINA_BINTI_ABU_BAKAR.PDF