Estimation system using function point
Software cost estimation is one of the most important parts in the project planning phase to ensure that the project will lead to success. Function point is one of the best methods used in estimating the software cost and size. Function point focuses more on measure the functionality thus make its e...
| Main Author: | |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2013
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/7250/ http://umpir.ump.edu.my/id/eprint/7250/1/Estimation%20system%20using%20function%20point.pdf |
| _version_ | 1848817969109401600 |
|---|---|
| author | Himala, Dewi Jaganathan |
| author_facet | Himala, Dewi Jaganathan |
| author_sort | Himala, Dewi Jaganathan |
| building | UMP Institutional Repository |
| collection | Online Access |
| description | Software cost estimation is one of the most important parts in the project planning phase to ensure that the project will lead to success. Function point is one of the best methods used in estimating the software cost and size. Function point focuses more on measure the functionality thus make its estimation accurate and efficient. Function points features such as independent of programming language, product design and documented method makes it as an advantage. Besides measure the size and cost, function point also helps to measure the estimating the effort, schedule and defect in the project. The prototype of this research was developed using Microsoft Visual Studio 2008. |
| first_indexed | 2025-11-15T01:30:12Z |
| format | Undergraduates Project Papers |
| id | ump-7250 |
| institution | Universiti Malaysia Pahang |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T01:30:12Z |
| publishDate | 2013 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | ump-72502023-11-20T00:04:30Z http://umpir.ump.edu.my/id/eprint/7250/ Estimation system using function point Himala, Dewi Jaganathan QA Mathematics Software cost estimation is one of the most important parts in the project planning phase to ensure that the project will lead to success. Function point is one of the best methods used in estimating the software cost and size. Function point focuses more on measure the functionality thus make its estimation accurate and efficient. Function points features such as independent of programming language, product design and documented method makes it as an advantage. Besides measure the size and cost, function point also helps to measure the estimating the effort, schedule and defect in the project. The prototype of this research was developed using Microsoft Visual Studio 2008. 2013 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/7250/1/Estimation%20system%20using%20function%20point.pdf Himala, Dewi Jaganathan (2013) Estimation system using function point. Faculty of Computer System & Software Engineering, Universiti Malaysia Pahang. |
| spellingShingle | QA Mathematics Himala, Dewi Jaganathan Estimation system using function point |
| title | Estimation system using function point |
| title_full | Estimation system using function point |
| title_fullStr | Estimation system using function point |
| title_full_unstemmed | Estimation system using function point |
| title_short | Estimation system using function point |
| title_sort | estimation system using function point |
| topic | QA Mathematics |
| url | http://umpir.ump.edu.my/id/eprint/7250/ http://umpir.ump.edu.my/id/eprint/7250/1/Estimation%20system%20using%20function%20point.pdf |