Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component
This study presents an implementation of concurrent engineering (CE) and analytical network process (ANP) to form a new rating method as part of the manufacturing process and material analysis in product development environment. The proposed procedure is referred as concurrent network (CN). It is pl...
| Main Authors: | , , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/6627/ http://umpir.ump.edu.my/id/eprint/6627/1/fkp-2014-nanang-Implementation_of_concurrent.pdf |
| _version_ | 1848817819141013504 |
|---|---|
| author | Fatchurrohman, Nanang Suraya, Sulaiman S. M., Sapuan M. K. A., Ariffin B. T. H. T., Baharuddin |
| author_facet | Fatchurrohman, Nanang Suraya, Sulaiman S. M., Sapuan M. K. A., Ariffin B. T. H. T., Baharuddin |
| author_sort | Fatchurrohman, Nanang |
| building | UMP Institutional Repository |
| collection | Online Access |
| description | This study presents an implementation of concurrent engineering (CE) and analytical network process (ANP) to form a new rating method as part of the manufacturing process and material analysis in product development environment. The proposed procedure is referred as concurrent network (CN). It is planned for CN to carry out simultaneous analysis of all aspects of product elements by using CE strategy. Furthermore, CN enables interdependence and interrelationship analysis between product elements by implementing ANP. In this study, CN is utilized for manufacturing process and material analysis of metal matrix composites (MMCs) automotive component which is the brake disc. The results show that by using CN, all product parameters can be analysed comprehensively and the importance weights of product parameters with regard to MMCs brake disc performance are obtained. |
| first_indexed | 2025-11-15T01:27:49Z |
| format | Conference or Workshop Item |
| id | ump-6627 |
| institution | Universiti Malaysia Pahang |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T01:27:49Z |
| publishDate | 2014 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | ump-66272018-02-23T01:48:44Z http://umpir.ump.edu.my/id/eprint/6627/ Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component Fatchurrohman, Nanang Suraya, Sulaiman S. M., Sapuan M. K. A., Ariffin B. T. H. T., Baharuddin TL Motor vehicles. Aeronautics. Astronautics This study presents an implementation of concurrent engineering (CE) and analytical network process (ANP) to form a new rating method as part of the manufacturing process and material analysis in product development environment. The proposed procedure is referred as concurrent network (CN). It is planned for CN to carry out simultaneous analysis of all aspects of product elements by using CE strategy. Furthermore, CN enables interdependence and interrelationship analysis between product elements by implementing ANP. In this study, CN is utilized for manufacturing process and material analysis of metal matrix composites (MMCs) automotive component which is the brake disc. The results show that by using CN, all product parameters can be analysed comprehensively and the importance weights of product parameters with regard to MMCs brake disc performance are obtained. 2014 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/6627/1/fkp-2014-nanang-Implementation_of_concurrent.pdf Fatchurrohman, Nanang and Suraya, Sulaiman and S. M., Sapuan and M. K. A., Ariffin and B. T. H. T., Baharuddin (2014) Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component. In: Proceedings of the 1st International Conference on Automotive Innovation and Green Energy Vehicle (AiGEV 2014) , 26-27 August 2014 , Swiss Garden Resort & Spa, Kuantan, Pahang. pp. 1-10.. (Published) |
| spellingShingle | TL Motor vehicles. Aeronautics. Astronautics Fatchurrohman, Nanang Suraya, Sulaiman S. M., Sapuan M. K. A., Ariffin B. T. H. T., Baharuddin Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component |
| title | Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component |
| title_full | Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component |
| title_fullStr | Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component |
| title_full_unstemmed | Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component |
| title_short | Implementation of Concurrent Engineering and Analytical Network Process In Manufacturing Process and Material Analysis of Metal Matrix Composites Automotive Component |
| title_sort | implementation of concurrent engineering and analytical network process in manufacturing process and material analysis of metal matrix composites automotive component |
| topic | TL Motor vehicles. Aeronautics. Astronautics |
| url | http://umpir.ump.edu.my/id/eprint/6627/ http://umpir.ump.edu.my/id/eprint/6627/1/fkp-2014-nanang-Implementation_of_concurrent.pdf |