Fuzzy Mixed Assembly Line Sequencing and Scheduling Optimization Model Using Multiobjective Dynamic Fuzzy GA
A new multiobjective dynamic fuzzy genetic algorithm is applied to solve a fuzzy mixed-model assembly line sequencing problem in which the primary goals are to minimize the total make-span and minimize the setup number simultaneously. Trapezoidal fuzzy numbers are implemented for variables such as o...
| Main Authors: | Zahari, Taha, Farzad, Tahriri, Siti Zawiah, Md Dawal |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Hindawi Publishing Corporation
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/6089/ http://umpir.ump.edu.my/id/eprint/6089/1/Fuzzy_Mixed_Assembly_Line_Sequencing_and_Scheduling_Optimization_Model_Using_Multiobjective_Dynamic_Fuzzy_GA.pdf |
Similar Items
Multiobjective Fuzzy Mixed Assembly Line Sequencing Optimization Model
by: Tahriri, Farzad, et al.
Published: (2014)
by: Tahriri, Farzad, et al.
Published: (2014)
Job sequencing and layout optimization in virtual production line
by: Zahari, Taha, et al.
Published: (2011)
by: Zahari, Taha, et al.
Published: (2011)
Scheduling scientific workflow using multiobjective algorithm with fuzzy resource utilization in multi-cloud environment
by: Farid, Mazen, et al.
Published: (2020)
by: Farid, Mazen, et al.
Published: (2020)
A new multiobjective tiki-taka algorithm for optimization of assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2023)
by: M. F. F., Ab Rashid, et al.
Published: (2023)
Multiobjective problems with fuzzy parameters and games against nature
by: Larbani, Moussa
Published: (2010)
by: Larbani, Moussa
Published: (2010)
Fuzzy logic model for dynamic multiprocessor scheduling
by: Salleh, Shaharuddin, et al.
Published: (1999)
by: Salleh, Shaharuddin, et al.
Published: (1999)
Scheduling with fuzzy delays and fuzzy precedences
by: Kanesan , Muthusamy, et al.
Published: (2003)
by: Kanesan , Muthusamy, et al.
Published: (2003)
Development of Genetic Algorithm Procedure for Sequencing Problem in Mixed-Model Assembly Lines
by: Noroziroshan, Alireza
Published: (2009)
by: Noroziroshan, Alireza
Published: (2009)
The Concept of Integrating Virtual Group (VG) and Agile Supplier Selection (ASS)
by: Farzad, Tahriri, et al.
Published: (2010)
by: Farzad, Tahriri, et al.
Published: (2010)
Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem
by: Kanesan , Muthusamy, et al.
Published: (2000)
by: Kanesan , Muthusamy, et al.
Published: (2000)
Multiple tabu search for multiobjective urban transit scheduling problem
by: Uvaraja, Vikneswary, et al.
Published: (2019)
by: Uvaraja, Vikneswary, et al.
Published: (2019)
An Investigation of GA-Fuzzy Technique in Technical Analysis
by: Li, Guanzhen
Published: (2009)
by: Li, Guanzhen
Published: (2009)
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2011)
by: M. F. F., Ab Rashid, et al.
Published: (2011)
Parallel multiple tabu search for multiobjective Urban Transit Scheduling Problem
by: Uvaraja, Vikneswary, et al.
Published: (2020)
by: Uvaraja, Vikneswary, et al.
Published: (2020)
Enhancing efficiency of automobile assembly line using the Fuzzy logical and Multi-objective Genetic Algorithm
by: Adham, Ali A. J., et al.
Published: (2012)
by: Adham, Ali A. J., et al.
Published: (2012)
Application of intelligence based genetic algorithm for job sequencing problem on parallel mixed-model assembly line
by: Noroziroshan, Alireza, et al.
Published: (2010)
by: Noroziroshan, Alireza, et al.
Published: (2010)
A study of evolutionary multiobjective algorithms and their application to knapsack and nurse scheduling problems
by: Le, Khoi Nguyen
Published: (2011)
by: Le, Khoi Nguyen
Published: (2011)
Integrated optimization of mixed-model assembly sequence planning and line balancing using multi-objective discrete particle swarm optimization
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Scheduling Analysis for Job Sequencing in Veneer Lamination Line
by: Mohamad Zairi, Baharom, et al.
Published: (2014)
by: Mohamad Zairi, Baharom, et al.
Published: (2014)
Hybrid multiobjective genetic algorithm for integrated dynamic scheduling and routing of jobs and automated guided vehicles in flexible manufacturing systems
by: Umar, Umar Ali
Published: (2014)
by: Umar, Umar Ali
Published: (2014)
Factors affecting job satisfaction in two automotive industries in Malaysia
by: Dawal, Siti Zawiah, et al.
Published: (2006)
by: Dawal, Siti Zawiah, et al.
Published: (2006)
Match-up strategies and fuzzy robust scheduling for a complex dynamic real world job shop scheduling problem
by: Moratori, Patrick
Published: (2013)
by: Moratori, Patrick
Published: (2013)
Sequential and parallel multiple tabu search algorithm for multiobjective urban transit scheduling problems
by: Uvaraja, Vikneswary
Published: (2018)
by: Uvaraja, Vikneswary
Published: (2018)
Development of a Tuneable Test Problem Generator for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2012)
by: M. F. F., Ab Rashid, et al.
Published: (2012)
Fuzzy p-absolutely summable difference sequences
by: Dutta, Hemen, et al.
Published: (2018)
by: Dutta, Hemen, et al.
Published: (2018)
Optimization of mixed-model assembly line balancing problem with resource constraints
by: M. M., Razali, et al.
Published: (2017)
by: M. M., Razali, et al.
Published: (2017)
Permutation flow shop scheduling: fuzzy particle swarm optimization approach
by: Ling, S., et al.
Published: (2011)
by: Ling, S., et al.
Published: (2011)
Assessment of integrated assembly sequence planning and line balancing optimization using metaheuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
A multiobjective single bus corridor scheduling using machine learning-based predictive models
by: Chen, Bing, et al.
Published: (2020)
by: Chen, Bing, et al.
Published: (2020)
Optimal scheduling with dynamic line ratings and intermittent wind power
by: Banerjee, B., et al.
Published: (2014)
by: Banerjee, B., et al.
Published: (2014)
Optimized scheduling for an airconditioning system based on indoor thermal comfort using the multiobjective improved global particle swarm optimization
by: Haniff, Mohamad Fadzli, et al.
Published: (2018)
by: Haniff, Mohamad Fadzli, et al.
Published: (2018)
The Fuzzy and Dynamic Nature of Trust
by: Chang, Elizabeth, et al.
Published: (2005)
by: Chang, Elizabeth, et al.
Published: (2005)
Generalized finite sequence of fuzzy topographic topological mapping
by: Ahmad, Tahir, et al.
Published: (2010)
by: Ahmad, Tahir, et al.
Published: (2010)
Evaluations of fuzzy-logic-based self tuning PI controller and fuzzy-scheduled PID controller for DC servomotor
by: N., Saad, et al.
Published: (2008)
by: N., Saad, et al.
Published: (2008)
Scheduling Problem with Fuzzy Due-dates on Unrelated Parallel Processors
by: Kanesan , Muthusamy, et al.
Published: (2000)
by: Kanesan , Muthusamy, et al.
Published: (2000)
Knowledge-based disk scheduling policy using fuzzy logic
by: Abu Talip, Mohamad Sofian, et al.
Published: (2010)
by: Abu Talip, Mohamad Sofian, et al.
Published: (2010)
Genetic fuzzy scheduler for spectrum sensing in cognitive radio networks
by: Mohamedou, Ahmed, et al.
Published: (2012)
by: Mohamedou, Ahmed, et al.
Published: (2012)
A modified artificial bee colony algorithm to optimise integrated assembly sequence planning and assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Intergrated multi-objective optimisation of assembly sequence planning and assembly line balancing using particle swarm optimisation
by: M. F. F., Ab Rashid
Published: (2013)
by: M. F. F., Ab Rashid
Published: (2013)
Multi-Objective Discrete Particle Swarm Optimisation Algorithm for Integrated Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
Similar Items
-
Multiobjective Fuzzy Mixed Assembly Line Sequencing Optimization Model
by: Tahriri, Farzad, et al.
Published: (2014) -
Job sequencing and layout optimization in virtual production line
by: Zahari, Taha, et al.
Published: (2011) -
Scheduling scientific workflow using multiobjective algorithm with fuzzy resource utilization in multi-cloud environment
by: Farid, Mazen, et al.
Published: (2020) -
A new multiobjective tiki-taka algorithm for optimization of assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2023) -
Multiobjective problems with fuzzy parameters and games against nature
by: Larbani, Moussa
Published: (2010)