Delay-based Reliability Analysis on Construction Projects
The construction industry has a crucial role in the overall development of any economy; however it has its own drawbacks and difficulties that should be well studied in order to improve the efficiency of this industry. Delays, which are an inseparable part of any project, are an important issue in c...
| Main Author: | Sorooshian, Shahryar |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Zhengzhou University, Marsland Press
2014
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/5156/ http://umpir.ump.edu.my/id/eprint/5156/1/Ftech-2014-shahryar-DelayBasedReliability.pdf |
Similar Items
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Quantification of delay factors using the relative importance index method for construction project
by: Nor Fatini, Mohd Rasip
Published: (2016)
by: Nor Fatini, Mohd Rasip
Published: (2016)
Call for roadmap for successful adoption of CSR in Malaysian construction
by: Zahidy, Anat Anaqie, et al.
Published: (2019)
by: Zahidy, Anat Anaqie, et al.
Published: (2019)
Study on causes of delay for government construction project in Kuching, Sarawak
by: Nurul Asyilah, Romzi
Published: (2017)
by: Nurul Asyilah, Romzi
Published: (2017)
Derivation of a Reliable and Consistent Volume Delay Functions for Town Road Network Based on Users Feedback
by: A., Zulkiple, et al.
Published: (2012)
by: A., Zulkiple, et al.
Published: (2012)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
Developing a model to predict time delay in road construction projects using bayesian networks
by: Mohammad, Almohammad
Published: (2020)
by: Mohammad, Almohammad
Published: (2020)
Causes and effect of delays in Aceh construction industry
by: Majid, Ibnu Abbas
Published: (2006)
by: Majid, Ibnu Abbas
Published: (2006)
4P delays in project management
by: Ansah, Richard Hannis, et al.
Published: (2018)
by: Ansah, Richard Hannis, et al.
Published: (2018)
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019)
by: Siti Nurfarahin, Samsudin
Published: (2019)
Content Analysis of Manuscript Titles
by: Panjehpour*, Mohammad, et al.
Published: (2019)
by: Panjehpour*, Mohammad, et al.
Published: (2019)
Effects Of Contractors’ Delay Factors On Building Project Performance Among Kuantan Malaysian Construction Industry
by: N.S.A, Samsudin, et al.
Published: (2020)
by: N.S.A, Samsudin, et al.
Published: (2020)
The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
by: Johnny, Wong Hing Kiong
Published: (2021)
by: Johnny, Wong Hing Kiong
Published: (2021)
An Environmental Impact Framework for Evaluating Construction Projects Delays
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Delay in design phase in Malaysia construction : the cause and the factor to reduce the delay
by: Noor Syazwani, Mohd Rizhuan
Published: (2019)
by: Noor Syazwani, Mohd Rizhuan
Published: (2019)
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
by: Btoush, Mohammed, et al.
Published: (2017)
by: Btoush, Mohammed, et al.
Published: (2017)
Advancing Towards Delay-Free Construction Project: A
Review
by: Ansah, Richard Hannis, et al.
Published: (2016)
by: Ansah, Richard Hannis, et al.
Published: (2016)
Reliability analysis on the stability of slope
by: Ng, Kok Shien
Published: (2005)
by: Ng, Kok Shien
Published: (2005)
A theoretical framework on factors causing delay of construction industries projects
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
Strategies to measure progress and productivity in model-based construction projects
by: Ahmad Atif, Adzman
Published: (2019)
by: Ahmad Atif, Adzman
Published: (2019)
Fuzzy risk analysis for construction projects
by: Chaher, Zid, et al.
Published: (2016)
by: Chaher, Zid, et al.
Published: (2016)
Challenges in construction readiness for BIM-based building projects
by: Radzi, Afiqah R., et al.
Published: (2024)
by: Radzi, Afiqah R., et al.
Published: (2024)
Investigating the relationship between site supervision and IBS based construction projects
by: Syamsyul Hairi, M. S., et al.
Published: (2020)
by: Syamsyul Hairi, M. S., et al.
Published: (2020)
The delay at pre-tendering stage of projects in Accommodation and Works Directorate Ministry of Defense Kuala Lumpur
by: Gurmukh Singh, Lakhbir Singh
Published: (2007)
by: Gurmukh Singh, Lakhbir Singh
Published: (2007)
Study of deserted construction projects in Malaysia
by: Nazratul Izzana, Ishak
Published: (2015)
by: Nazratul Izzana, Ishak
Published: (2015)
Case Improvement based on Lower Quality Mode and Effects Analysis
by: Nur Adillah, Abdul Razak, et al.
Published: (2015)
by: Nur Adillah, Abdul Razak, et al.
Published: (2015)
Constructive and destructive leadership behaviors, skills, styles and traits in BIM-based construction projects
by: Omer, Mazen Mohamed Alkhdar, et al.
Published: (2022)
by: Omer, Mazen Mohamed Alkhdar, et al.
Published: (2022)
Determining the delay factors for reconstructed mega-project’s phases and the associated challenges / Basem Adnan Al Khatib
by: Basem Adnan , Al Khatib
Published: (2021)
by: Basem Adnan , Al Khatib
Published: (2021)
Impacts of poor management on construction project in Malaysia
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
by: Nurul Ain Syafiqah, Sabri
Published: (2018)
Factors effecting the cost management in construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
by: Albtoush, Faten Ahmad, et al.
Published: (2020)
To review the effectiveness of project management in construction process
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
by: Noor Hafizatul Ashikin, Rozali
Published: (2015)
A Study On Variations In Sewerage Construction Projects
by: Kassim, Mohd. Azraai, et al.
Published: (2002)
by: Kassim, Mohd. Azraai, et al.
Published: (2002)
Factors causing the poor performance of construction project
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
by: Ghazali, Wardah Musfirah
Published: (2014)
by: Ghazali, Wardah Musfirah
Published: (2014)
Reliability analysis of prestressed concrete bridge girder beam
by: Kumar, Guna
Published: (2005)
by: Kumar, Guna
Published: (2005)
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
Similar Items
-
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019) -
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018) -
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018) -
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022) -
Quantification of delay factors using the relative importance index method for construction project
by: Nor Fatini, Mohd Rasip
Published: (2016)