Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization

Hybrid flow shop scheduling (HFS) has garnered significant interest in terms of problem formulation and solution approaches. This work introduces an optimization approach for a case study on a hybrid flow shop scheduling problem. The objective is to minimize the makespan, en...

Full description

Bibliographic Details
Main Authors: Siti Nurhazwani Husna, Mohd Hata, Muhammad Ammar, Nik Mu’tasim, Mohd Fadzil Faisae, Ab Rashid
Format: Article
Language:English
Published: Faculty Mechanical Engineering, UMP 2025
Subjects:
Online Access:https://umpir.ump.edu.my/id/eprint/45873/
_version_ 1848827517458186240
author Siti Nurhazwani Husna, Mohd Hata
Muhammad Ammar, Nik Mu’tasim
Mohd Fadzil Faisae, Ab Rashid
author_facet Siti Nurhazwani Husna, Mohd Hata
Muhammad Ammar, Nik Mu’tasim
Mohd Fadzil Faisae, Ab Rashid
author_sort Siti Nurhazwani Husna, Mohd Hata
building UMP Institutional Repository
collection Online Access
description Hybrid flow shop scheduling (HFS) has garnered significant interest in terms of problem formulation and solution approaches. This work introduces an optimization approach for a case study on a hybrid flow shop scheduling problem. The objective is to minimize the makespan, energy consumption, and idle machines in the manufacturing shop. The HFS comprises multipleconcurrent production lines, each composed ofseveral machinesthat operatein one or more stages. A case study was conducted using fourteen jobs across three stages, which involved the use oflathes, millingmachines, and deburring machines. The EE-HFS was optimized using Multi-Objective Tiki Taka Optimization (MOTTA).The study considered machine idle time as a key factor influencing energy efficiency, incorporating it into the scheduling evaluation.The optimization result was compared to established algorithms, such as the Non-dominated Sorting Genetic Algorithm-II, the Multi-ObjectiveEvolutionary Algorithm Based on Decomposition, the Multi-ObjectiveParticle Swarm Optimization,and the recent algorithm,the Multi-ObjectiveGrey Wolf Optimizer. The metrics used for comparison include Error Ratio (ER), Pareto Percentage (%), Spacing, Maximum Spread, computational speed, Hyper Volume, Inverted Generational Distance (IGD), and Generational Distance (GD). The results indicate that MOTTA exhibits superior performance,with 78.42% as thebest overallresult,and100% improvementin terms ofconvergence anddominationcompared tothe case study solutions(ER, ND, GD, and IGD). Overall, the findings have important implications for Hybrid flow shop scheduling in terms of the energy utilization model, reducing idle machine time, and the promising potential of MOTTA for application in other combinatorial scheduling challenges. This case study providessubstantial benefitsto the organization by effectively reducingits daily energy consumptionandequipment usage, while alsoenhancing resource management.
first_indexed 2025-11-15T04:01:58Z
format Article
id ump-45873
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T04:01:58Z
publishDate 2025
publisher Faculty Mechanical Engineering, UMP
recordtype eprints
repository_type Digital Repository
spelling ump-458732025-10-06T07:48:13Z https://umpir.ump.edu.my/id/eprint/45873/ Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization Siti Nurhazwani Husna, Mohd Hata Muhammad Ammar, Nik Mu’tasim Mohd Fadzil Faisae, Ab Rashid TJ Mechanical engineering and machinery Hybrid flow shop scheduling (HFS) has garnered significant interest in terms of problem formulation and solution approaches. This work introduces an optimization approach for a case study on a hybrid flow shop scheduling problem. The objective is to minimize the makespan, energy consumption, and idle machines in the manufacturing shop. The HFS comprises multipleconcurrent production lines, each composed ofseveral machinesthat operatein one or more stages. A case study was conducted using fourteen jobs across three stages, which involved the use oflathes, millingmachines, and deburring machines. The EE-HFS was optimized using Multi-Objective Tiki Taka Optimization (MOTTA).The study considered machine idle time as a key factor influencing energy efficiency, incorporating it into the scheduling evaluation.The optimization result was compared to established algorithms, such as the Non-dominated Sorting Genetic Algorithm-II, the Multi-ObjectiveEvolutionary Algorithm Based on Decomposition, the Multi-ObjectiveParticle Swarm Optimization,and the recent algorithm,the Multi-ObjectiveGrey Wolf Optimizer. The metrics used for comparison include Error Ratio (ER), Pareto Percentage (%), Spacing, Maximum Spread, computational speed, Hyper Volume, Inverted Generational Distance (IGD), and Generational Distance (GD). The results indicate that MOTTA exhibits superior performance,with 78.42% as thebest overallresult,and100% improvementin terms ofconvergence anddominationcompared tothe case study solutions(ER, ND, GD, and IGD). Overall, the findings have important implications for Hybrid flow shop scheduling in terms of the energy utilization model, reducing idle machine time, and the promising potential of MOTTA for application in other combinatorial scheduling challenges. This case study providessubstantial benefitsto the organization by effectively reducingits daily energy consumptionandequipment usage, while alsoenhancing resource management. Faculty Mechanical Engineering, UMP 2025-09-30 Article PeerReviewed pdf en cc_by_nc_4 https://umpir.ump.edu.my/id/eprint/45873/1/5.%2Bhata%2Bet%2Bal._0843.pdf Siti Nurhazwani Husna, Mohd Hata and Muhammad Ammar, Nik Mu’tasim and Mohd Fadzil Faisae, Ab Rashid (2025) Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization. Journal of Mechanical Engineering and Sciences (JMES), 19 (3). pp. 10756-10769. ISSN 2289-4659 (print); 2231-8380 (online). (Published) https://doi.org/10.15282/jmes.19.3.2025.5.0843 https://doi.org/10.15282/jmes.19.3.2025.5.0843 https://doi.org/10.15282/jmes.19.3.2025.5.0843
spellingShingle TJ Mechanical engineering and machinery
Siti Nurhazwani Husna, Mohd Hata
Muhammad Ammar, Nik Mu’tasim
Mohd Fadzil Faisae, Ab Rashid
Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
title Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
title_full Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
title_fullStr Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
title_full_unstemmed Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
title_short Optimization ofhybrid flow shop scheduling in a machine shop: Achieving energy efficiency and minimizing machine idleness with multi-objective Tiki Taka optimization
title_sort optimization ofhybrid flow shop scheduling in a machine shop: achieving energy efficiency and minimizing machine idleness with multi-objective tiki taka optimization
topic TJ Mechanical engineering and machinery
url https://umpir.ump.edu.my/id/eprint/45873/
https://umpir.ump.edu.my/id/eprint/45873/
https://umpir.ump.edu.my/id/eprint/45873/