Muhammad Syahril Ilham, A. (2025). A case study on cost-benefit analysis for process industry equipment.
Chicago Style (17th ed.) CitationMuhammad Syahril Ilham, Azhar. A Case Study on Cost-benefit Analysis for Process Industry Equipment. 2025.
MLA (9th ed.) CitationMuhammad Syahril Ilham, Azhar. A Case Study on Cost-benefit Analysis for Process Industry Equipment. 2025.
Warning: These citations may not always be 100% accurate.