Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant

The utilization of Empty fruit bunch (EFB) in energy production has increased in Malaysia over the last two decades. The EFB can be used as a solid fuel in a boiler system for heat and power generation. However, numerous safety and technical issues lead to a lower energy production rate. A holistic...

Full description

Bibliographic Details
Main Authors: Ahmad Nur Fikry, Zainuddin, Nurul Ain Syuhadah, Mohammad Khorri, Nurul Sa'aadah, Sulaiman, Alaw, Fares Ahmed
Format: Article
Language:English
Published: Universiti Putra Malaysia 2022
Subjects:
Online Access:https://umpir.ump.edu.my/id/eprint/45298/
_version_ 1848827378097192960
author Ahmad Nur Fikry, Zainuddin
Nurul Ain Syuhadah, Mohammad Khorri
Nurul Sa'aadah, Sulaiman
Alaw, Fares Ahmed
author_facet Ahmad Nur Fikry, Zainuddin
Nurul Ain Syuhadah, Mohammad Khorri
Nurul Sa'aadah, Sulaiman
Alaw, Fares Ahmed
author_sort Ahmad Nur Fikry, Zainuddin
building UMP Institutional Repository
collection Online Access
description The utilization of Empty fruit bunch (EFB) in energy production has increased in Malaysia over the last two decades. The EFB can be used as a solid fuel in a boiler system for heat and power generation. However, numerous safety and technical issues lead to a lower energy production rate. A holistic probabilistic risk analysis is developed using the Bayesian Belief Network (BBN) to reduce the risk in the boiler system. The Conditional Probability Table (CPT) indicates the influence strength between the parent node and child node in BBN. Due to scarcely available information on EFB boiler, elicitation from the expert’s opinion is vital. The formulation for boiler failures likelihood prediction that relies on experts’ perceptions was developed using the Weighted Sum Algorithm (WSA). A case study from BioPower Plant in Pahang was applied in this project. The model illustrates the relationship between the cause and the effect of the biomass boiler efficiency in a systematic way. Two types of analyses, prediction and diagnostic analysis, were performed. The results facilitated the decision-maker to predict and identify the influential underlying factors of the boiler efficiency, respectively. The result shows that the most important boiler failure factor is combustion stability. It agrees with experts’ experience that most biomass boiler failure was caused by EFB, which contains high moisture content that affects flame stability. The proposed formulation for expert opinions and perceptions conversion can be utilized for risk analysis to benefit the boiler and other infrastructure that relies on experts’ experience.
first_indexed 2025-11-15T03:59:45Z
format Article
id ump-45298
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:59:45Z
publishDate 2022
publisher Universiti Putra Malaysia
recordtype eprints
repository_type Digital Repository
spelling ump-452982025-08-07T07:31:33Z https://umpir.ump.edu.my/id/eprint/45298/ Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant Ahmad Nur Fikry, Zainuddin Nurul Ain Syuhadah, Mohammad Khorri Nurul Sa'aadah, Sulaiman Alaw, Fares Ahmed TJ Mechanical engineering and machinery TP Chemical technology The utilization of Empty fruit bunch (EFB) in energy production has increased in Malaysia over the last two decades. The EFB can be used as a solid fuel in a boiler system for heat and power generation. However, numerous safety and technical issues lead to a lower energy production rate. A holistic probabilistic risk analysis is developed using the Bayesian Belief Network (BBN) to reduce the risk in the boiler system. The Conditional Probability Table (CPT) indicates the influence strength between the parent node and child node in BBN. Due to scarcely available information on EFB boiler, elicitation from the expert’s opinion is vital. The formulation for boiler failures likelihood prediction that relies on experts’ perceptions was developed using the Weighted Sum Algorithm (WSA). A case study from BioPower Plant in Pahang was applied in this project. The model illustrates the relationship between the cause and the effect of the biomass boiler efficiency in a systematic way. Two types of analyses, prediction and diagnostic analysis, were performed. The results facilitated the decision-maker to predict and identify the influential underlying factors of the boiler efficiency, respectively. The result shows that the most important boiler failure factor is combustion stability. It agrees with experts’ experience that most biomass boiler failure was caused by EFB, which contains high moisture content that affects flame stability. The proposed formulation for expert opinions and perceptions conversion can be utilized for risk analysis to benefit the boiler and other infrastructure that relies on experts’ experience. Universiti Putra Malaysia 2022 Article PeerReviewed pdf en cc_by_nc_nd_4 https://umpir.ump.edu.my/id/eprint/45298/1/Elicitation%20of%20conditional%20probability%20table%20%28CPT%29%20for%20risk%20analysis%20.pdf Ahmad Nur Fikry, Zainuddin and Nurul Ain Syuhadah, Mohammad Khorri and Nurul Sa'aadah, Sulaiman and Alaw, Fares Ahmed (2022) Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant. Pertanika Journal of Science & Technology (JST), 30 (2). pp. 1327-1342. ISSN 0128-7680. (Published) https://doi.org/10.47836/pjst.30.2.26 https://doi.org/10.47836/pjst.30.2.26 https://doi.org/10.47836/pjst.30.2.26
spellingShingle TJ Mechanical engineering and machinery
TP Chemical technology
Ahmad Nur Fikry, Zainuddin
Nurul Ain Syuhadah, Mohammad Khorri
Nurul Sa'aadah, Sulaiman
Alaw, Fares Ahmed
Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant
title Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant
title_full Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant
title_fullStr Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant
title_full_unstemmed Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant
title_short Elicitation of conditional probability table (CPT) for risk analysis of biomass boiler in energy plant
title_sort elicitation of conditional probability table (cpt) for risk analysis of biomass boiler in energy plant
topic TJ Mechanical engineering and machinery
TP Chemical technology
url https://umpir.ump.edu.my/id/eprint/45298/
https://umpir.ump.edu.my/id/eprint/45298/
https://umpir.ump.edu.my/id/eprint/45298/