Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors

Purpose: This study aims to investigate factors leading to homebuyer complaints during defect liability periods (DLP). The specific study objectives are to: identify critical factors leading to homebuyer complaints during DLP; compare the factors among regions, house price and developer recognition;...

Full description

Bibliographic Details
Main Authors: Mohd Saufi, ., Liyana, Mohamed Yusof, Rahimi, A. Rahman
Format: Article
Language:English
Published: Emerald Publishing Limited 2024
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/43796/
http://umpir.ump.edu.my/id/eprint/43796/1/Homebuyer%20complaints%20during%20defect%20liability%20period.pdf
_version_ 1848826962053693440
author Mohd Saufi, .
Liyana, Mohamed Yusof
Rahimi, A. Rahman
author_facet Mohd Saufi, .
Liyana, Mohamed Yusof
Rahimi, A. Rahman
author_sort Mohd Saufi, .
building UMP Institutional Repository
collection Online Access
description Purpose: This study aims to investigate factors leading to homebuyer complaints during defect liability periods (DLP). The specific study objectives are to: identify critical factors leading to homebuyer complaints during DLP; compare the factors among regions, house price and developer recognition; group the factors into subcategories; and evaluate the criticality of the categories. Design/methodology/approach: A systematic literature review and semi-structured interviews with 20 homebuyers were carried out, generating 37 factors. A survey was developed with the factors categorized into three categories: individual presumptions, defects discovery and post-rectifications. The survey data were collected from 104 homebuyers who had acquired new houses within the last five years. The collected data were subjected to statistical analyses, including normalized mean analysis, Kruskal–Wallis H test, factor analysis and fuzzy synthetic evaluation. Findings: The results indicate that individual presumptions, defects discovery and post-rectifications have 8, 14 and 6 critical factors. Then, there are high similarities in the criticality of the factors among regions, house price and developer recognition. The defect discovery factors can be grouped into function- and precision-related factors. Finally, the defect discovery category has the highest overall criticality, followed by post-rectification and individual presumption categories. Originality/value: To the best of the authors’ knowledge, this study is the first to quantitatively investigate factors leading to homebuyers’ complaints during DLP. The study findings offer a new perspective for policymakers in the development of housing regulations.
first_indexed 2025-11-15T03:53:09Z
format Article
id ump-43796
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:53:09Z
publishDate 2024
publisher Emerald Publishing Limited
recordtype eprints
repository_type Digital Repository
spelling ump-437962025-02-12T03:05:31Z http://umpir.ump.edu.my/id/eprint/43796/ Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors Mohd Saufi, . Liyana, Mohamed Yusof Rahimi, A. Rahman TA Engineering (General). Civil engineering (General) TH Building construction Purpose: This study aims to investigate factors leading to homebuyer complaints during defect liability periods (DLP). The specific study objectives are to: identify critical factors leading to homebuyer complaints during DLP; compare the factors among regions, house price and developer recognition; group the factors into subcategories; and evaluate the criticality of the categories. Design/methodology/approach: A systematic literature review and semi-structured interviews with 20 homebuyers were carried out, generating 37 factors. A survey was developed with the factors categorized into three categories: individual presumptions, defects discovery and post-rectifications. The survey data were collected from 104 homebuyers who had acquired new houses within the last five years. The collected data were subjected to statistical analyses, including normalized mean analysis, Kruskal–Wallis H test, factor analysis and fuzzy synthetic evaluation. Findings: The results indicate that individual presumptions, defects discovery and post-rectifications have 8, 14 and 6 critical factors. Then, there are high similarities in the criticality of the factors among regions, house price and developer recognition. The defect discovery factors can be grouped into function- and precision-related factors. Finally, the defect discovery category has the highest overall criticality, followed by post-rectification and individual presumption categories. Originality/value: To the best of the authors’ knowledge, this study is the first to quantitatively investigate factors leading to homebuyers’ complaints during DLP. The study findings offer a new perspective for policymakers in the development of housing regulations. Emerald Publishing Limited 2024-10-17 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/43796/1/Homebuyer%20complaints%20during%20defect%20liability%20period.pdf Mohd Saufi, . and Liyana, Mohamed Yusof and Rahimi, A. Rahman (2024) Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors. Journal of Engineering, Design and Technology. pp. 1-34. ISSN 1726-0531. (In Press / Online First) (In Press / Online First) https://doi.org/10.1108/JEDT-01-2024-0017 https://doi.org/10.1108/JEDT-01-2024-0017
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Mohd Saufi, .
Liyana, Mohamed Yusof
Rahimi, A. Rahman
Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors
title Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors
title_full Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors
title_fullStr Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors
title_full_unstemmed Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors
title_short Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors
title_sort homebuyer complaints during defect liability period: critical analysis of individual presumptions, defect discovery and post-rectifications factors
topic TA Engineering (General). Civil engineering (General)
TH Building construction
url http://umpir.ump.edu.my/id/eprint/43796/
http://umpir.ump.edu.my/id/eprint/43796/
http://umpir.ump.edu.my/id/eprint/43796/
http://umpir.ump.edu.my/id/eprint/43796/1/Homebuyer%20complaints%20during%20defect%20liability%20period.pdf