Construction project failure: Investigating causes of ineffective building information modelling execution plans
The successful implementation of Building Information Modelling (BIM) is contingent upon effectively executing BIM Execution Plans (BEPs). This study aims to investigate the causes that contribute to the development of ineffective BEPs that ultimately result in construction project failures. Intervi...
| Main Authors: | Mashanim, Mahazir, Rahimi, A. Rahman, Nurhaizan, Mohd Zainudin, Salmaliza, Salleh |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Malaysian Institute of Planners
2024
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/42331/ http://umpir.ump.edu.my/id/eprint/42331/1/Construction%20project%20failure%20-%20Investigating%20causes%20of%20ineffective%20building%20information%20modelling%20execution%20plans.pdf |
Similar Items
Causes of abandoned construction projects in Malaysia
by: Yap, Eng Hoe
Published: (2013)
by: Yap, Eng Hoe
Published: (2013)
Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
by: Mahazir, Mashanim
Published: (2006)
by: Mahazir, Mashanim
Published: (2006)
Building Information Modelling Execution Plan (BEP): A comparison of global practice
by: Ahmad Ridzuan, Abu Bakar, et al.
Published: (2020)
by: Ahmad Ridzuan, Abu Bakar, et al.
Published: (2020)
Study on causes of delay for government construction project in Kuching, Sarawak
by: Nurul Asyilah, Romzi
Published: (2017)
by: Nurul Asyilah, Romzi
Published: (2017)
Variation Orders Causes in Construction Buildings Projects in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)
Modeling the causes and mitigation measures for cost overruns in building construction : The case of higher education projects
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
Benefits from Adoption of Building Information Modelling (BIM) in Building Construction Projects in Sarawak
by: Albert Nelson Robert,
Published: (2021)
by: Albert Nelson Robert,
Published: (2021)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
An overview of contract documents for building information modelling (BIM) construction projects
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
An exploration of cost overrun in building construction projects
by: Tan, Chin Keng, et al.
Published: (2018)
by: Tan, Chin Keng, et al.
Published: (2018)
Integrated applications of building information modeling in project cost management: a systematic review
by: M. Farouk, Abdelrahman, et al.
Published: (2023)
by: M. Farouk, Abdelrahman, et al.
Published: (2023)
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019)
by: A. M., Faten Albtoush, et al.
Published: (2019)
Overcoming causes of claim disputes in construction projects: a dematel based model
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
Building information modeling (BIM) in green buildings: a state-of the- art bibliometric review
by: Muhammad Ashraf, Fauzi, et al.
Published: (2023)
by: Muhammad Ashraf, Fauzi, et al.
Published: (2023)
Towards Assessing Productivity in Off-Site Building Methods for Engineering and Construction Projects
by: Alazzaz, Faisal, et al.
Published: (2012)
by: Alazzaz, Faisal, et al.
Published: (2012)
A content validity: Organisational performance’s assessment instrument in the construction industry
by: Khairul Firdaus, Anuar, et al.
Published: (2024)
by: Khairul Firdaus, Anuar, et al.
Published: (2024)
UMPSA s Bachelor of Project Management programme obtains international accreditation from PMI GAC for 5 years
by: Nurhaizan, Mohd Zainudin
Published: (2025)
by: Nurhaizan, Mohd Zainudin
Published: (2025)
The problem of resource planning in construction project in Kuantan
by: Siti Nor, Azahari
Published: (2016)
by: Siti Nor, Azahari
Published: (2016)
Construction and demolition waste recycling and reuse clause in standard form contracts: impact on project performance
by: Nurhaizan, Mohd Zainudin, et al.
Published: (2023)
by: Nurhaizan, Mohd Zainudin, et al.
Published: (2023)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
A study to identify the factor that causes project delay in construction at Terengganu
by: Nurul Syakirah, Mohd Ali
Published: (2016)
by: Nurul Syakirah, Mohd Ali
Published: (2016)
Understanding the Causes of Design Errors in Construction Projects: A DEMATEL-Based Framework
by: Lee, Chia Kuang, et al.
Published: (2024)
by: Lee, Chia Kuang, et al.
Published: (2024)
Factors causing the poor performance of construction project
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
Human-related problems in quality management implementation in building construction projects
by: Tan, Chin Keng, et al.
Published: (2009)
by: Tan, Chin Keng, et al.
Published: (2009)
Causes of delays in the construction phase of Chinese building projects
by: Wang, T., et al.
Published: (2018)
by: Wang, T., et al.
Published: (2018)
Understanding the causes and effects of low-risk management: implementation in projects using the DEMATEL algorithm
by: Lee, Chia Kuang, et al.
Published: (2023)
by: Lee, Chia Kuang, et al.
Published: (2023)
Building Information Modelling (BIM) execution plan framework : a case study of pre-approved plan (PAP) design modelling project in the Public Work Department (PWD) of Malaysia
by: Ahmad Ridzuan, Abu Bakar
Published: (2023)
by: Ahmad Ridzuan, Abu Bakar
Published: (2023)
Evaluation of solidified and stabilized shipyard abrasive blasting waste as construction material / Salmaliza Salleh
by: Salmaliza , Salleh
Published: (2018)
by: Salmaliza , Salleh
Published: (2018)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
The Role of 5D Building Information Modelling in Construction Project Cost Management: An Overview and Future Directions
by: Mustafa, Muhammad Hadi, et al.
Published: (2023)
by: Mustafa, Muhammad Hadi, et al.
Published: (2023)
Developing and Validating an Assessment Instrument for Organizational Performances of Construction Organization
by: Khairul Firdaus, Anuar, et al.
Published: (2024)
by: Khairul Firdaus, Anuar, et al.
Published: (2024)
Implemenetation of faclity management in building information modelling (BIM) for post construction
by: Nur Awadah Syakirah, Abd Khalid
Published: (2018)
by: Nur Awadah Syakirah, Abd Khalid
Published: (2018)
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
Understanding the use of kaikaku project management in construction industry: A planned behaviour approach
by: Lee, Chia Kuang, et al.
Published: (2024)
by: Lee, Chia Kuang, et al.
Published: (2024)
Challenges in construction readiness for BIM-based building projects
by: Radzi, Afiqah R., et al.
Published: (2024)
by: Radzi, Afiqah R., et al.
Published: (2024)
Causes of Construction Wastes and Capabilities of Building Information Modelling (BIM) in Minimizing the Wastes
by: Kong, Sio Kah, et al.
Published: (2020)
by: Kong, Sio Kah, et al.
Published: (2020)
Factor causing time delay in construction Malaysia
by: Nasser Rostam, Afshar, et al.
Published: (2016)
by: Nasser Rostam, Afshar, et al.
Published: (2016)
The significant factors causing delay of building construction projects in Malaysia.
by: Alaghbari, Wa'el, et al.
Published: (2007)
by: Alaghbari, Wa'el, et al.
Published: (2007)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Similar Items
-
Causes of abandoned construction projects in Malaysia
by: Yap, Eng Hoe
Published: (2013) -
Pemilihan sistem perparitan sementara untuk diaplikasi di tapak bina
by: Mahazir, Mashanim
Published: (2006) -
Building Information Modelling Execution Plan (BEP): A comparison of global practice
by: Ahmad Ridzuan, Abu Bakar, et al.
Published: (2020) -
Study on causes of delay for government construction project in Kuching, Sarawak
by: Nurul Asyilah, Romzi
Published: (2017) -
Variation Orders Causes in Construction Buildings Projects in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)