Construction project failure: Investigating causes of ineffective building information modelling execution plans

The successful implementation of Building Information Modelling (BIM) is contingent upon effectively executing BIM Execution Plans (BEPs). This study aims to investigate the causes that contribute to the development of ineffective BEPs that ultimately result in construction project failures. Intervi...

Full description

Bibliographic Details
Main Authors: Mashanim, Mahazir, Rahimi, A. Rahman, Nurhaizan, Mohd Zainudin, Salmaliza, Salleh
Format: Article
Language:English
Published: Malaysian Institute of Planners 2024
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/42331/
http://umpir.ump.edu.my/id/eprint/42331/1/Construction%20project%20failure%20-%20Investigating%20causes%20of%20ineffective%20building%20information%20modelling%20execution%20plans.pdf
_version_ 1848826582797385728
author Mashanim, Mahazir
Rahimi, A. Rahman
Nurhaizan, Mohd Zainudin
Salmaliza, Salleh
author_facet Mashanim, Mahazir
Rahimi, A. Rahman
Nurhaizan, Mohd Zainudin
Salmaliza, Salleh
author_sort Mashanim, Mahazir
building UMP Institutional Repository
collection Online Access
description The successful implementation of Building Information Modelling (BIM) is contingent upon effectively executing BIM Execution Plans (BEPs). This study aims to investigate the causes that contribute to the development of ineffective BEPs that ultimately result in construction project failures. Interview data with twenty BIM professionals were collected on causes contributing to the development of ineffective BEPs. The collected data was analyzed using thematic analysis. The analysis revealed three categories contributing to ineffective BEPs: people, process, and technology. There are 11, 6, and 1 causes related to people, process, and technology, respectively. The finding suggests that incompetency, lack of knowledge in BIM, individual attitude, poor data management, and insufficient technology used are the causes that contribute to ineffective BEPs. The outcomes of this study offer substantial insights into the Architecture, Engineering, and Construction (AEC) industry in developing effective BEPs, thereby ensuring the successful delivery of BIM-based construction projects.
first_indexed 2025-11-15T03:47:07Z
format Article
id ump-42331
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:47:07Z
publishDate 2024
publisher Malaysian Institute of Planners
recordtype eprints
repository_type Digital Repository
spelling ump-423312024-08-13T06:32:30Z http://umpir.ump.edu.my/id/eprint/42331/ Construction project failure: Investigating causes of ineffective building information modelling execution plans Mashanim, Mahazir Rahimi, A. Rahman Nurhaizan, Mohd Zainudin Salmaliza, Salleh HD28 Management. Industrial Management TA Engineering (General). Civil engineering (General) The successful implementation of Building Information Modelling (BIM) is contingent upon effectively executing BIM Execution Plans (BEPs). This study aims to investigate the causes that contribute to the development of ineffective BEPs that ultimately result in construction project failures. Interview data with twenty BIM professionals were collected on causes contributing to the development of ineffective BEPs. The collected data was analyzed using thematic analysis. The analysis revealed three categories contributing to ineffective BEPs: people, process, and technology. There are 11, 6, and 1 causes related to people, process, and technology, respectively. The finding suggests that incompetency, lack of knowledge in BIM, individual attitude, poor data management, and insufficient technology used are the causes that contribute to ineffective BEPs. The outcomes of this study offer substantial insights into the Architecture, Engineering, and Construction (AEC) industry in developing effective BEPs, thereby ensuring the successful delivery of BIM-based construction projects. Malaysian Institute of Planners 2024 Article PeerReviewed pdf en cc_by_nc_nd http://umpir.ump.edu.my/id/eprint/42331/1/Construction%20project%20failure%20-%20Investigating%20causes%20of%20ineffective%20building%20information%20modelling%20execution%20plans.pdf Mashanim, Mahazir and Rahimi, A. Rahman and Nurhaizan, Mohd Zainudin and Salmaliza, Salleh (2024) Construction project failure: Investigating causes of ineffective building information modelling execution plans. Journal of the Malaysian Institute of Planners, 22 (3). pp. 47-62. ISSN 1675-6215. (Published) https://doi.org/10.21837/pm.v22i32.1492 10.21837/pm.v22i32.1492
spellingShingle HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
Mashanim, Mahazir
Rahimi, A. Rahman
Nurhaizan, Mohd Zainudin
Salmaliza, Salleh
Construction project failure: Investigating causes of ineffective building information modelling execution plans
title Construction project failure: Investigating causes of ineffective building information modelling execution plans
title_full Construction project failure: Investigating causes of ineffective building information modelling execution plans
title_fullStr Construction project failure: Investigating causes of ineffective building information modelling execution plans
title_full_unstemmed Construction project failure: Investigating causes of ineffective building information modelling execution plans
title_short Construction project failure: Investigating causes of ineffective building information modelling execution plans
title_sort construction project failure: investigating causes of ineffective building information modelling execution plans
topic HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/42331/
http://umpir.ump.edu.my/id/eprint/42331/
http://umpir.ump.edu.my/id/eprint/42331/
http://umpir.ump.edu.my/id/eprint/42331/1/Construction%20project%20failure%20-%20Investigating%20causes%20of%20ineffective%20building%20information%20modelling%20execution%20plans.pdf