Optimal Government Strategies for BIM Implementation in Low-Income Economies: A Case Study in Syria
Building information modeling (BIM) enables substantial improvement in the architecture, engineering, and construction (AEC) industry. As a leading actor in the AEC industry, policymakers have the means to develop appropriate strategies for addressing the factor affecting BIM implementation. However...
| Main Authors: | Al-Mohammad, Mohammad S., Ahmad Tarmizi, Haron, Maya, Rana, Rahimi, A. Rahman |
|---|---|
| Format: | Article |
| Language: | English English |
| Published: |
American Society of Civil Engineers (ASCE)
2024
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/41178/ http://umpir.ump.edu.my/id/eprint/41178/1/optimal-government-strategies-for-bim-implementation-in-low-income-economies.pdf http://umpir.ump.edu.my/id/eprint/41178/2/optimal-government-strategies-for-bim-implementation-in-low-income-economies-a-case-study-in%20Syria.pdf |
Similar Items
Factors affecting BIM implementation in post-conflict low-income economies: the case of Afghanistan
by: Al-Mohammad, Mohammad, et al.
Published: (2021)
by: Al-Mohammad, Mohammad, et al.
Published: (2021)
Factors affecting BIM implementation: evidence from countries with different income levels
by: Al-Mohammad, Mohammad S., et al.
Published: (2022)
by: Al-Mohammad, Mohammad S., et al.
Published: (2022)
Critical Factors Affecting BIM Implementation in India: Multivariate Analysis
by: Mohammad S., Al-Mohammad, et al.
Published: (2023)
by: Mohammad S., Al-Mohammad, et al.
Published: (2023)
Factors affecting BIM implementation in Saudi Arabia: a critical analysis
by: Mohammad S., Al-Mohammad, et al.
Published: (2023)
by: Mohammad S., Al-Mohammad, et al.
Published: (2023)
Implementation of 4D/BIM in the Iraqi construction industry
by: Hamada, Hussein M., et al.
Published: (2017)
by: Hamada, Hussein M., et al.
Published: (2017)
Critical government strategies for enhancing building information modeling implementation in indonesia
by: Rani, Hafnidar A., et al.
Published: (2023)
by: Rani, Hafnidar A., et al.
Published: (2023)
Underlying factors and strategies for organizational BIM capabilities : The case of Iran
by: Rajabi, Mohammad Sadra, et al.
Published: (2022)
by: Rajabi, Mohammad Sadra, et al.
Published: (2022)
The barriers in the implementation of BIM in Malaysia
by: Tee, Sin Hui
Published: (2022)
by: Tee, Sin Hui
Published: (2022)
Understanding BIM Adoption in the AEC Industry: The Case of Jordan
by: Btoush, Mohammed, et al.
Published: (2017)
by: Btoush, Mohammed, et al.
Published: (2017)
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
by: Btoush, Mohammed, et al.
Published: (2017)
by: Btoush, Mohammed, et al.
Published: (2017)
Performance-based identity in a BIM environment : An architect’s perceptions and experiences
by: Syafizal, Shahruddin, et al.
Published: (2022)
by: Syafizal, Shahruddin, et al.
Published: (2022)
Intelligent BIM record model for effective asset management of constructed facility
by: Md Aslam, Hossain, et al.
Published: (2018)
by: Md Aslam, Hossain, et al.
Published: (2018)
The barriers factors and driving forces for BIM implementation in Malaysian AEC companies
by: Farah Salwati, Ibrahim, et al.
Published: (2019)
by: Farah Salwati, Ibrahim, et al.
Published: (2019)
Design coordination in BIM: Decision criteria for determining tolerances
by: Abdelrahman, M. Farouk, et al.
Published: (2023)
by: Abdelrahman, M. Farouk, et al.
Published: (2023)
Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
by: Zahrizan, Zakaria, et al.
Published: (2014)
by: Zahrizan, Zakaria, et al.
Published: (2014)
Factor Affecting of BIM Technique in the Construction Firms in Iraq
by: Hamada, Hussein M., et al.
Published: (2017)
by: Hamada, Hussein M., et al.
Published: (2017)
Challenges In BIM Implementation On Level Of Development (LOD) 300
by: Kong, Ka Seng
Published: (2021)
by: Kong, Ka Seng
Published: (2021)
Mahasiswa bersama Syria
by: Sinar Harian
Published: (2018)
by: Sinar Harian
Published: (2018)
The Call for Humanitarian Intervention in Syria: Issues and Challenges
by: Eishan Jan, Mohammad Naqib
Published: (2012)
by: Eishan Jan, Mohammad Naqib
Published: (2012)
Systematic approach and strategies for building information modelling (BIM) adoption in the Jordanian construction industry
by: Al-Diabat Al-Btoush, Mohammad
Published: (2018)
by: Al-Diabat Al-Btoush, Mohammad
Published: (2018)
A review on contractual issues and aspects regarding Building Information Modelling (BIM)
by: Saraireh, Ibrahim Moh'd A. Q., et al.
Published: (2020)
by: Saraireh, Ibrahim Moh'd A. Q., et al.
Published: (2020)
An Overview of Using Building Information Modelling (BIM) in Construction Management
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2016)
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2016)
Evaluation of bim implementation requirements affecting iraqi construction firms
by: Hussein Mahmood, Hamada
Published: (2017)
by: Hussein Mahmood, Hamada
Published: (2017)
An Exploratory Study on the Potential of Implementing Building Information Modelling (BIM) in Malaysian Construction Industry: Lesson Learnt from Singapore and Hong Kong Construction Industry
by: Zahrizan, Zakaria, et al.
Published: (2012)
by: Zahrizan, Zakaria, et al.
Published: (2012)
Factors, Challenges and Strategies of Trust in BIM-Based Construction Projects: A Case Study in Malaysia
by: M. Farouk, Abdelrahman, et al.
Published: (2023)
by: M. Farouk, Abdelrahman, et al.
Published: (2023)
Challenges and barriers of building information modelling (BIM) implementation in construction industry
by: Nur Farhana, Hamzah
Published: (2018)
by: Nur Farhana, Hamzah
Published: (2018)
Key assessment criteria for organizational bim capabilities : A cross-regional study
by: Rajabi, Mohammad Sadra, et al.
Published: (2022)
by: Rajabi, Mohammad Sadra, et al.
Published: (2022)
Challenge of building information modelling (BIM) implementation in Malaysia AEC industry
by: Muhammad Khairul Anuar, Isa
Published: (2019)
by: Muhammad Khairul Anuar, Isa
Published: (2019)
Relationship between BIM Implementation and Performance of OSM Projects
by: Tang, X., et al.
Published: (2019)
by: Tang, X., et al.
Published: (2019)
Investigating EFL undergraduates vocabulary learning strategies (VLSs) at a university in Syria
by: Daaboulis, Maisaa Moustafa, et al.
Published: (2018)
by: Daaboulis, Maisaa Moustafa, et al.
Published: (2018)
Branding Syria As A Spiritual Destination
by: Akkad, Dima
Published: (2008)
by: Akkad, Dima
Published: (2008)
The potential of implementing Building Information Modelling (BIM) in Malaysian Construction Industry: An exploratory study
by: Zahrizan, Zakaria, et al.
Published: (2012)
by: Zahrizan, Zakaria, et al.
Published: (2012)
Exploring The Adoption Of Building Information Modelling (BIM) In The Malaysian Construction Industry: A Qualitative Approach
by: Zahrizan, Zakaria, et al.
Published: (2013)
by: Zahrizan, Zakaria, et al.
Published: (2013)
Development Of Building Information Modeling (Bim) Implementation Framework In Malaysian Construction Industry
by: Abdul Rahim, Nur Soleha
Published: (2020)
by: Abdul Rahim, Nur Soleha
Published: (2020)
Challenges in construction readiness for BIM-based building projects
by: Radzi, Afiqah R., et al.
Published: (2024)
by: Radzi, Afiqah R., et al.
Published: (2024)
The role of media in the Arab Revolutions: the case of Syria
by: Bakour Mohamad, Bachar
Published: (2020)
by: Bakour Mohamad, Bachar
Published: (2020)
56 rakyat kita masih di Syria
by: UMP, PNC
Published: (2020)
by: UMP, PNC
Published: (2020)
56 rakyat Malaysia masih di Syria
by: Asrol, Awang
Published: (2020)
by: Asrol, Awang
Published: (2020)
Ceramah Syria bergolak tanda hari kiamat
by: Siti Sarah, Mohamad Rajimi
Published: (2017)
by: Siti Sarah, Mohamad Rajimi
Published: (2017)
Conflict in Syria, a sign of the judgment day
by: Siti Sarah, Mohamad Rajimi
Published: (2017)
by: Siti Sarah, Mohamad Rajimi
Published: (2017)
Similar Items
-
Factors affecting BIM implementation in post-conflict low-income economies: the case of Afghanistan
by: Al-Mohammad, Mohammad, et al.
Published: (2021) -
Factors affecting BIM implementation: evidence from countries with different income levels
by: Al-Mohammad, Mohammad S., et al.
Published: (2022) -
Critical Factors Affecting BIM Implementation in India: Multivariate Analysis
by: Mohammad S., Al-Mohammad, et al.
Published: (2023) -
Factors affecting BIM implementation in Saudi Arabia: a critical analysis
by: Mohammad S., Al-Mohammad, et al.
Published: (2023) -
Implementation of 4D/BIM in the Iraqi construction industry
by: Hamada, Hussein M., et al.
Published: (2017)