Comparison of activity-based costing and time-driven activity-based costing for printed circuit board assembly production
The number of resources employed determines product costs in traditional costing analysis (TCA). TCA is flawed because manufacturing overhead may be substantially larger than the basis of allocation, therefore a little change in resource volume causes a big change in overhead. Thus, activity-based c...
| Main Authors: | Nur Syafikah, Pinueh, Mohd Yazid, Abu, Nurul Haziyani, Aris, Muhammad Arieffuddin, Mohd Jamil, Emelia Sari, . |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
JATIT
2024
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/40747/ http://umpir.ump.edu.my/id/eprint/40747/1/publication6-PGRS230321.pdf |
Similar Items
Comparison of activity-based costing and time-driven activity- based costing for printed circuit board assembly in industry production
by: Nur Syafikah, Pinueh
Published: (2024)
by: Nur Syafikah, Pinueh
Published: (2024)
Mahalanobis-taguchi system and time-driven activity-based costing integration of printed circuit board
by: Nurul Haziyani, Aris, et al.
Published: (2023)
by: Nurul Haziyani, Aris, et al.
Published: (2023)
Integration of mahalanobis-taguchi system and time-driven activity-based costing for thermal printer in reducing variation
by: Nurul Haziyani, Aris
Published: (2024)
by: Nurul Haziyani, Aris
Published: (2024)
Application of activity-based costing and time-driven activity-based costing for kitchen cabinet
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
Comparative study: Activity based costing and time driven activity based costing in electronic industry
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
A review on the application of activity-based costing and time driven activity-based costing in manufacturing industry
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
A review on Mahalanobis-Taguchi system and time-driven activity-based costing for production environment
by: Nor Suhadah, Razali, et al.
Published: (2024)
by: Nor Suhadah, Razali, et al.
Published: (2024)
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Development a new costing structure for palm oil industry using time driven activity based costing
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
A comparative study of activitybased costing (abc) and time-driven activity-based costing (tdabc) on cost accounting
by: Nurul Farahin, Zamrud
Published: (2021)
by: Nurul Farahin, Zamrud
Published: (2021)
Optimization of capacity utilization using time-driven activity-based costing for library system
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
Comparative study between product- and service-based operations using time-driven activity-based costing
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Implication of time equation in mature and immature area of ramp using time driven activity based costing
by: Mohd Yazid, Abu
Published: (2020)
by: Mohd Yazid, Abu
Published: (2020)
Printed circuit board inspection using wavelet-based technique
by: Ibrahim, Zuwairie
Published: (2002)
by: Ibrahim, Zuwairie
Published: (2002)
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020)
by: N. F. A., Ghani, et al.
Published: (2020)
Effect of corrosion on printed circuit board
by: Muhammad Aminuddin, Adnan
Published: (2013)
by: Muhammad Aminuddin, Adnan
Published: (2013)
Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
by: S. N. A. M., Zaini, et al.
Published: (2020)
by: S. N. A. M., Zaini, et al.
Published: (2020)
Integration of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing in a Production Environment
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
Development Of Lab On Printed Circuit Board Based Heavy Metal Detection
by: Beh, Khi Khim
Published: (2023)
by: Beh, Khi Khim
Published: (2023)
Feasibility study on the implementation of mahalanobis taguchi system and time driven activity based costing in electronic industry
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Characterisation of Activity Based Costing on Remanufacturing Crankshaft
by: Mohd Yazid, Abu, et al.
Published: (2017)
by: Mohd Yazid, Abu, et al.
Published: (2017)
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)
by: Mohd Yazid, Abu, et al.
Published: (2019)
Integration of Mahalanobis-Taguchi system and time-driven activity-based costing in production environment
by: Filzah Lina, Mohd Safeiee
Published: (2023)
by: Filzah Lina, Mohd Safeiee
Published: (2023)
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
A finite-difference time-domain FDTD) software for simulation of printed circuit board (PCB) assembly
by: Kung, Fabian Wai Lee, et al.
Published: (2005)
by: Kung, Fabian Wai Lee, et al.
Published: (2005)
Chemical characterisation of printed circuit board wastewater.
by: Sobri, Shafreeza, et al.
Published: (2011)
by: Sobri, Shafreeza, et al.
Published: (2011)
Overhead and activity based costing.
by: Osman, Mohammad Noor Hisham
Published: (2012)
by: Osman, Mohammad Noor Hisham
Published: (2012)
Performance Evaluation Of Wavelet-Based Algorithm For Printed Circuit Board (PCB) Inspection
by: Ibrahim, Zuwairie, et al.
Published: (2001)
by: Ibrahim, Zuwairie, et al.
Published: (2001)
A case study on the un-used capacity assessment using time driven activity based costing for magnetic components
by: Areena, Zaini, et al.
Published: (2020)
by: Areena, Zaini, et al.
Published: (2020)
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021)
by: S. N. A. M., Zaini, et al.
Published: (2021)
Application of Activity Based Costing for Palm Oil Plantation
by: Chak, Wen Zheng, et al.
Published: (2019)
by: Chak, Wen Zheng, et al.
Published: (2019)
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
Similar Items
-
Comparison of activity-based costing and time-driven activity- based costing for printed circuit board assembly in industry production
by: Nur Syafikah, Pinueh
Published: (2024) -
Mahalanobis-taguchi system and time-driven activity-based costing integration of printed circuit board
by: Nurul Haziyani, Aris, et al.
Published: (2023) -
Integration of mahalanobis-taguchi system and time-driven activity-based costing for thermal printer in reducing variation
by: Nurul Haziyani, Aris
Published: (2024) -
Application of activity-based costing and time-driven activity-based costing for kitchen cabinet
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024) -
Comparative study: Activity based costing and time driven activity based costing in electronic industry
by: Nurul Farahin, Zamrud, et al.
Published: (2020)