Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective

Due to rapid development and overwhelming demands, housing projects are carried out within a short period. This situation leads to low-quality houses being delivered to homebuyers, which can be seen in the recent trends showing increased numbers of homebuyer complaints about house defects. Thus, thi...

Full description

Bibliographic Details
Main Authors: Mohd Saufi, ., Liyana, Mohamed Yusof, Rahimi, A. Rahman
Format: Article
Language:English
Published: Engineering Project and Production Management 2023
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/39048/
http://umpir.ump.edu.my/id/eprint/39048/1/Complaints%20and%20Rectifications%20During%20Defect%20Liability%20Period.pdf
_version_ 1848825669320966144
author Mohd Saufi, .
Liyana, Mohamed Yusof
Rahimi, A. Rahman
author_facet Mohd Saufi, .
Liyana, Mohamed Yusof
Rahimi, A. Rahman
author_sort Mohd Saufi, .
building UMP Institutional Repository
collection Online Access
description Due to rapid development and overwhelming demands, housing projects are carried out within a short period. This situation leads to low-quality houses being delivered to homebuyers, which can be seen in the recent trends showing increased numbers of homebuyer complaints about house defects. Thus, this study aims to determine the underlying issues that homebuyers face during the defect liability period (DLP). To achieve that aim, this study investigates the complaints by homebuyers and rectifications by housing developers towards these complaints. Homebuyers who bought directly from developers were interviewed with sets of knowledge questions. The questions include complaints related to the defects that appeared during DLP, the promptness of developers to those complaints, and their rights as a homebuyer towards the complaints. The study findings indicate that the underlying issues during DLP are people, process, and knowledge management. Additionally, although awareness of house defects among homebuyers is increasing, the knowledge of the legal rights during DLP is still low.
first_indexed 2025-11-15T03:32:36Z
format Article
id ump-39048
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:32:36Z
publishDate 2023
publisher Engineering Project and Production Management
recordtype eprints
repository_type Digital Repository
spelling ump-390482023-10-26T06:13:52Z http://umpir.ump.edu.my/id/eprint/39048/ Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective Mohd Saufi, . Liyana, Mohamed Yusof Rahimi, A. Rahman TA Engineering (General). Civil engineering (General) Due to rapid development and overwhelming demands, housing projects are carried out within a short period. This situation leads to low-quality houses being delivered to homebuyers, which can be seen in the recent trends showing increased numbers of homebuyer complaints about house defects. Thus, this study aims to determine the underlying issues that homebuyers face during the defect liability period (DLP). To achieve that aim, this study investigates the complaints by homebuyers and rectifications by housing developers towards these complaints. Homebuyers who bought directly from developers were interviewed with sets of knowledge questions. The questions include complaints related to the defects that appeared during DLP, the promptness of developers to those complaints, and their rights as a homebuyer towards the complaints. The study findings indicate that the underlying issues during DLP are people, process, and knowledge management. Additionally, although awareness of house defects among homebuyers is increasing, the knowledge of the legal rights during DLP is still low. Engineering Project and Production Management 2023-08 Article PeerReviewed pdf en cc_by_nc_nd http://umpir.ump.edu.my/id/eprint/39048/1/Complaints%20and%20Rectifications%20During%20Defect%20Liability%20Period.pdf Mohd Saufi, . and Liyana, Mohamed Yusof and Rahimi, A. Rahman (2023) Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective. Journal of Engineering, Project, and Production Management, 13 (3). pp. 1-11. ISSN 2221-6529. (Published) http://doi.org/10.32738/JEPPM-2023-0021 10.32738/JEPPM-2023-0021
spellingShingle TA Engineering (General). Civil engineering (General)
Mohd Saufi, .
Liyana, Mohamed Yusof
Rahimi, A. Rahman
Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective
title Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective
title_full Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective
title_fullStr Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective
title_full_unstemmed Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective
title_short Complaints and Rectifications During Defect Liability Period: Homebuyer Perspective
title_sort complaints and rectifications during defect liability period: homebuyer perspective
topic TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/39048/
http://umpir.ump.edu.my/id/eprint/39048/
http://umpir.ump.edu.my/id/eprint/39048/
http://umpir.ump.edu.my/id/eprint/39048/1/Complaints%20and%20Rectifications%20During%20Defect%20Liability%20Period.pdf