Modelling and optimization of energy efficient assembly line balancing using modified moth flame optimizer
Energy utilization is a global issue due to the reduction of fossil resources and also negative environmental effect. The assembly process in the manufacturing sector needs to move to a new dimension by taking into account energy utilization when designing the assembly line. Recently, researchers st...
| Main Authors: | M. F. F., Ab Rashid, N. M. Zuki, N. M., Oumer, A. N. |
|---|---|
| Format: | Article |
| Language: | English English |
| Published: |
Penerbit UTHM
2022
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/37576/ http://umpir.ump.edu.my/id/eprint/37576/1/4861 http://umpir.ump.edu.my/id/eprint/37576/2/2022%20IJIE%20ALB%20EE%20using%20MMFO.pdf |
Similar Items
Improved moth flame optimization algorithm to optimize cost-oriented two-sided assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Energy efficient modeling and optimization for assembly sequence planning using moth flame optimization
by: Abdullah, Arif, et al.
Published: (2019)
by: Abdullah, Arif, et al.
Published: (2019)
Modelling and optimization of energy efficient assemblyline balancing using modified moth flame optimizer
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022)
Hybrid flow shop scheduling with energy consumption in machine shop using moth flame optimization
by: M. F. F., Ab Rashid, et al.
Published: (2022)
by: M. F. F., Ab Rashid, et al.
Published: (2022)
Assessment of metaheuristic algorithms to optimize of mixed-model assembly line balancing problem with resource constraints
by: M.M., Razali, et al.
Published: (2020)
by: M.M., Razali, et al.
Published: (2020)
A new multiobjective tiki-taka algorithm for optimization of assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2023)
by: M. F. F., Ab Rashid, et al.
Published: (2023)
Integrated optimization of mixed-model assembly sequence planning and line balancing using multi-objective discrete particle swarm optimization
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Recent trend in mixed-model assembly line balancing optimization using soft computing approaches
by: Razali, Muhamad Magffierah, et al.
Published: (2019)
by: Razali, Muhamad Magffierah, et al.
Published: (2019)
Optimisation of energy efficient Assembly Sequence Planning using Moth-Flame Optimisation alghorithm
by: Muhammad Arif, Abdullah
Published: (2019)
by: Muhammad Arif, Abdullah
Published: (2019)
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2011)
by: M. F. F., Ab Rashid, et al.
Published: (2011)
Assembly line balancing with energy consumption optimization using Substituted Tiki Taka Algorithm
by: Arif Nijay, Ramli, et al.
Published: (2024)
by: Arif Nijay, Ramli, et al.
Published: (2024)
Optimisation of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)
Modelling of assembly line balancing with energy consumption
by: Ariff Nijay, Ramli, et al.
Published: (2023)
by: Ariff Nijay, Ramli, et al.
Published: (2023)
Development of a Tuneable Test Problem Generator for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2012)
by: M. F. F., Ab Rashid, et al.
Published: (2012)
A Review of Two-sided Assembly Line Balancing Problem
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
Optimization of assembly line balancing with energy efficiency by using tiki-taka algorithm
by: Ariff Nijay, Ramli
Published: (2023)
by: Ariff Nijay, Ramli
Published: (2023)
Economic dispatch solution using moth-flame optimization algorithm
by: Mohd Herwan, Sulaiman, et al.
Published: (2018)
by: Mohd Herwan, Sulaiman, et al.
Published: (2018)
Assembly Line Balancing with Resource Constraints using New
Rank-Based Crossovers
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
Optimization of mixed-model assembly line balancing problem with resource constraints
by: M. M., Razali, et al.
Published: (2017)
by: M. M., Razali, et al.
Published: (2017)
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
Multi-Objective Discrete Particle Swarm Optimisation Algorithm for Integrated Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
Optimisation of Assembly Line Balancing Type-E with Resource Constraints using NSGA-II
by: Masitah, Jusop, et al.
Published: (2016)
by: Masitah, Jusop, et al.
Published: (2016)
A modified artificial bee colony algorithm to optimise integrated assembly sequence planning and assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Mathematical Modelling of Mixed-Model Assembly Line Balancing Problem with Resources Constraints
by: Muhamad Magffierah, Razali, et al.
Published: (2016)
by: Muhamad Magffierah, Razali, et al.
Published: (2016)
Modelling of Simple Assembly Line Balancing Problem Type 1 (SALBP-1) with Machine and Worker Constraints
by: N. H., Kamarudin, et al.
Published: (2017)
by: N. H., Kamarudin, et al.
Published: (2017)
Optimization of travelling salesman problem with precedence constraint using modified GA encoding
by: M. F. F., Ab Rashid, et al.
Published: (2018)
by: M. F. F., Ab Rashid, et al.
Published: (2018)
Assessment of integrated assembly sequence planning and line balancing optimization using metaheuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
Application of Moth-Flame Optimizer and Ant Lion Optimizer to Solve Optimal Reactive Power Dispatch Problems
by: Rebecca Ng, Shin Mei, et al.
Published: (2018)
by: Rebecca Ng, Shin Mei, et al.
Published: (2018)
Optimal power flow solutions for power system operations using moth-flame optimization algorithm
by: Alabd, Salman, et al.
Published: (2020)
by: Alabd, Salman, et al.
Published: (2020)
Moth Flame Optimization Algorithm including Renewable Energy for Minimization of Generation & Emission Costs in Optimal Power Flow
by: Alam, Mohammad Khurshed, et al.
Published: (2022)
by: Alam, Mohammad Khurshed, et al.
Published: (2022)
Optimizing energy production: superiority of feasible solution-moth flame optimization in IEEE 57-bus systems for optimal power flow
by: Alam, Mohammad Khurshed, et al.
Published: (2024)
by: Alam, Mohammad Khurshed, et al.
Published: (2024)
A review of assembly line balancing optimisation with energy consideration using meta-heuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021)
NSGA-II Algorithm for Assembly Line Balancing with Multi-Resource Constraints
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
Modelling and optimization of assembly line balancing with multi-resource constraints
by: Ab Rashid, Mohd Fadzil Faisae, et al.
Published: (2017)
by: Ab Rashid, Mohd Fadzil Faisae, et al.
Published: (2017)
Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study
by: Masitah, Jusop, et al.
Published: (2016)
by: Masitah, Jusop, et al.
Published: (2016)
Optimization of Traveling Salesman Problem with Precedence Constraint using Particle Swarm Optimization
by: M. F. F., Ab Rashid, et al.
Published: (2015)
by: M. F. F., Ab Rashid, et al.
Published: (2015)
Optimal Reactive Power Dispatch Solution by Loss Minimization Using Moth-Flame Optimization Technique
by: Rebecca Ng, Shin Mei, et al.
Published: (2017)
by: Rebecca Ng, Shin Mei, et al.
Published: (2017)
Optimal power flow solutions for power system operations using moth-flame optimization algorithm
by: Salman Ameen Ali, Abdullah Alabd
Published: (2021)
by: Salman Ameen Ali, Abdullah Alabd
Published: (2021)
Solving the optimal power flow problems using the superiority of feasible solutions-moth flame optimizer
by: Alam, Mohammad Khurshed
Published: (2024)
by: Alam, Mohammad Khurshed
Published: (2024)
Similar Items
-
Improved moth flame optimization algorithm to optimize cost-oriented two-sided assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019) -
Energy efficient modeling and optimization for assembly sequence planning using moth flame optimization
by: Abdullah, Arif, et al.
Published: (2019) -
Modelling and optimization of energy efficient assemblyline balancing using modified moth flame optimizer
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022) -
Hybrid flow shop scheduling with energy consumption in machine shop using moth flame optimization
by: M. F. F., Ab Rashid, et al.
Published: (2022) -
Assessment of metaheuristic algorithms to optimize of mixed-model assembly line balancing problem with resource constraints
by: M.M., Razali, et al.
Published: (2020)