Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX

Industrialized Building System (IBS) is a form of construction with focused processes comprise of methods, products and a set of connected components which works together to achieve objectives. Malaysian construction industry is among the main contributor towards the development of the country. To e...

Full description

Bibliographic Details
Main Author: Lee, Chia Kuang
Format: Research Book Profile
Language:English
Published: 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/36244/
http://umpir.ump.edu.my/id/eprint/36244/1/Developing%20an%20Integrated%20Industrialised%20Building%20system%20%28IBS%29%20maturity%20model%20a%20hybrid%20model%20with%20RIGGSS%20OMAX.pdf
_version_ 1848824941497024512
author Lee, Chia Kuang
author_facet Lee, Chia Kuang
author_sort Lee, Chia Kuang
building UMP Institutional Repository
collection Online Access
description Industrialized Building System (IBS) is a form of construction with focused processes comprise of methods, products and a set of connected components which works together to achieve objectives. Malaysian construction industry is among the main contributor towards the development of the country. To ensure vitality of construction performance, utilization and application of IBS is the right system to shift to from current conventional construction method. Adaptability of IBS in Malaysian’s construction industry is very low due to various limitations and barriers. From a total of 110 articles reviewed in this paper, 8 factors were highly mentioned which are reduced workplace accidents, transportation and logistics, adequate knowledge and expertise, reduction in environmental degradation, management factor, integration of process and training, communication and financial status. These are all the barriers and limitations that impede the development and adaptability of IBS in Malaysia’s construction industry that can also be used as crucial factors that can also significantly influence IBS project performance.
first_indexed 2025-11-15T03:21:02Z
format Research Book Profile
id ump-36244
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:21:02Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling ump-362442023-01-04T01:40:53Z http://umpir.ump.edu.my/id/eprint/36244/ Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX Lee, Chia Kuang HD28 Management. Industrial Management Industrialized Building System (IBS) is a form of construction with focused processes comprise of methods, products and a set of connected components which works together to achieve objectives. Malaysian construction industry is among the main contributor towards the development of the country. To ensure vitality of construction performance, utilization and application of IBS is the right system to shift to from current conventional construction method. Adaptability of IBS in Malaysian’s construction industry is very low due to various limitations and barriers. From a total of 110 articles reviewed in this paper, 8 factors were highly mentioned which are reduced workplace accidents, transportation and logistics, adequate knowledge and expertise, reduction in environmental degradation, management factor, integration of process and training, communication and financial status. These are all the barriers and limitations that impede the development and adaptability of IBS in Malaysia’s construction industry that can also be used as crucial factors that can also significantly influence IBS project performance. 2017 Research Book Profile NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/36244/1/Developing%20an%20Integrated%20Industrialised%20Building%20system%20%28IBS%29%20maturity%20model%20a%20hybrid%20model%20with%20RIGGSS%20OMAX.pdf Lee, Chia Kuang (2017) Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX. (Unpublished)
spellingShingle HD28 Management. Industrial Management
Lee, Chia Kuang
Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX
title Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX
title_full Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX
title_fullStr Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX
title_full_unstemmed Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX
title_short Developing an Integrated Industrialised Building system (IBS) maturity model: a hybrid model with RIGGS'S OMAX
title_sort developing an integrated industrialised building system (ibs) maturity model: a hybrid model with riggs's omax
topic HD28 Management. Industrial Management
url http://umpir.ump.edu.my/id/eprint/36244/
http://umpir.ump.edu.my/id/eprint/36244/1/Developing%20an%20Integrated%20Industrialised%20Building%20system%20%28IBS%29%20maturity%20model%20a%20hybrid%20model%20with%20RIGGSS%20OMAX.pdf