Factors affecting construction productivity: comparative study between worker's nationality

There are many factors that affect construction productivity based on the worker's background. This study assesses the five factors affecting construction productivity at a construction site in Kuala Lumpur within the worker’s nationalities. In 2019, a survey was distributed to a sample of 60 c...

Full description

Bibliographic Details
Main Authors: K., Balakrishnan, N.F., Buang, Mohammad Adam, Adman
Format: Article
Language:English
Published: UMP Press 2022
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/35997/
http://umpir.ump.edu.my/id/eprint/35997/1/31.pdf
_version_ 1848824924712468480
author K., Balakrishnan
N.F., Buang
Mohammad Adam, Adman
author_facet K., Balakrishnan
N.F., Buang
Mohammad Adam, Adman
author_sort K., Balakrishnan
building UMP Institutional Repository
collection Online Access
description There are many factors that affect construction productivity based on the worker's background. This study assesses the five factors affecting construction productivity at a construction site in Kuala Lumpur within the worker’s nationalities. In 2019, a survey was distributed to a sample of 60 construction workers with various backgrounds. Descriptive analysis shows that respondents are perceived as moderately, that manpower factors (Mean score =2.88, S.D. = 0.54), external factors (Mean score = 3.32, S.D. =0.59), communication factors (Mean score = 3.23, S.D. = 0.63), resources factors (Mean score = 3.31, S.D. = 0.58) and miscellaneous factors (Mean score = 3.29, S.D. = 0.70) affect construction productivity. Moreover, perception of the four factors (manpower, external, communication and resources) affecting construction productivity had a significant difference between Malaysian and non-Malaysian workers (P<0.05). Therefore, advancement should focus on those four factors to nurture better delivery of construction work; thus, increasing the productivity among workers from different nationalities.
first_indexed 2025-11-15T03:20:46Z
format Article
id ump-35997
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:20:46Z
publishDate 2022
publisher UMP Press
recordtype eprints
repository_type Digital Repository
spelling ump-359972022-12-23T09:19:35Z http://umpir.ump.edu.my/id/eprint/35997/ Factors affecting construction productivity: comparative study between worker's nationality K., Balakrishnan N.F., Buang Mohammad Adam, Adman T Technology (General) TA Engineering (General). Civil engineering (General) There are many factors that affect construction productivity based on the worker's background. This study assesses the five factors affecting construction productivity at a construction site in Kuala Lumpur within the worker’s nationalities. In 2019, a survey was distributed to a sample of 60 construction workers with various backgrounds. Descriptive analysis shows that respondents are perceived as moderately, that manpower factors (Mean score =2.88, S.D. = 0.54), external factors (Mean score = 3.32, S.D. =0.59), communication factors (Mean score = 3.23, S.D. = 0.63), resources factors (Mean score = 3.31, S.D. = 0.58) and miscellaneous factors (Mean score = 3.29, S.D. = 0.70) affect construction productivity. Moreover, perception of the four factors (manpower, external, communication and resources) affecting construction productivity had a significant difference between Malaysian and non-Malaysian workers (P<0.05). Therefore, advancement should focus on those four factors to nurture better delivery of construction work; thus, increasing the productivity among workers from different nationalities. UMP Press 2022 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/35997/1/31.pdf K., Balakrishnan and N.F., Buang and Mohammad Adam, Adman (2022) Factors affecting construction productivity: comparative study between worker's nationality. UMP Research Series: Construction Engineering and Management, 1 (1). pp. 20-30. ISSN 978-967-2831-41-9. (Published) https://doi.org/10.15282/CEM.1.04.2022.01.02 https://doi.org/10.15282/CEM.1.04.2022.01.02
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
K., Balakrishnan
N.F., Buang
Mohammad Adam, Adman
Factors affecting construction productivity: comparative study between worker's nationality
title Factors affecting construction productivity: comparative study between worker's nationality
title_full Factors affecting construction productivity: comparative study between worker's nationality
title_fullStr Factors affecting construction productivity: comparative study between worker's nationality
title_full_unstemmed Factors affecting construction productivity: comparative study between worker's nationality
title_short Factors affecting construction productivity: comparative study between worker's nationality
title_sort factors affecting construction productivity: comparative study between worker's nationality
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/35997/
http://umpir.ump.edu.my/id/eprint/35997/
http://umpir.ump.edu.my/id/eprint/35997/
http://umpir.ump.edu.my/id/eprint/35997/1/31.pdf