Construction waste recycling: Enhancement strategies and organization size

The continuous increment of construction projects worldwide is raising the amount of construction waste (CW). A significant amount of CW in landfills can critically impact the economy and environment if not addressed properly. Construction waste recycling (CWR) is one solution for reducing CW in lan...

Full description

Bibliographic Details
Main Authors: Omer, Mazen M., Rahimi, A. Rahman, Almutairi, Saud
Format: Article
Language:English
English
Published: Elsevier Ltd. 2022
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/34736/
http://umpir.ump.edu.my/id/eprint/34736/1/Construction%20waste%20recycling.pdf
http://umpir.ump.edu.my/id/eprint/34736/2/Construction%20waste%20recycling_FULL.pdf
_version_ 1848824587587944448
author Omer, Mazen M.
Rahimi, A. Rahman
Almutairi, Saud
author_facet Omer, Mazen M.
Rahimi, A. Rahman
Almutairi, Saud
author_sort Omer, Mazen M.
building UMP Institutional Repository
collection Online Access
description The continuous increment of construction projects worldwide is raising the amount of construction waste (CW). A significant amount of CW in landfills can critically impact the economy and environment if not addressed properly. Construction waste recycling (CWR) is one solution for reducing CW in landfills. Organizations are implementing various strategies for enhancing CWR implementation in practice. However, small-medium enterprises (SMEs) and large enterprises (LEs) might face different challenges in implementing those strategies due to their different organizational characteristics. Therefore, this study compares the cost and easiness of implementing CWR enhancement strategies between SMEs and LEs. To achieve that objective, this study analyzes survey data from 108 construction industry practitioners using descriptive statistics, normalization, Kruskal-Wallis, and overlap analysis techniques. The major findings include ‘raise project team awareness on CWR’ and ‘organize temporary bins in each construction zone’ are simple and low-cost enhancement strategies for all organization sizes. Also, there are additional simple and low-cost strategies for LEs: ‘identify construction activities that produce recyclable materials,’ ‘use information technology to facilitate CWR processes,’ and ‘enhance company policies related to CWR.’ These findings contribute to a better knowledge of the optimal CWR enhancement strategies for different organization sizes.
first_indexed 2025-11-15T03:15:24Z
format Article
id ump-34736
institution Universiti Malaysia Pahang
institution_category Local University
language English
English
last_indexed 2025-11-15T03:15:24Z
publishDate 2022
publisher Elsevier Ltd.
recordtype eprints
repository_type Digital Repository
spelling ump-347362022-07-18T06:41:04Z http://umpir.ump.edu.my/id/eprint/34736/ Construction waste recycling: Enhancement strategies and organization size Omer, Mazen M. Rahimi, A. Rahman Almutairi, Saud TA Engineering (General). Civil engineering (General) TH Building construction The continuous increment of construction projects worldwide is raising the amount of construction waste (CW). A significant amount of CW in landfills can critically impact the economy and environment if not addressed properly. Construction waste recycling (CWR) is one solution for reducing CW in landfills. Organizations are implementing various strategies for enhancing CWR implementation in practice. However, small-medium enterprises (SMEs) and large enterprises (LEs) might face different challenges in implementing those strategies due to their different organizational characteristics. Therefore, this study compares the cost and easiness of implementing CWR enhancement strategies between SMEs and LEs. To achieve that objective, this study analyzes survey data from 108 construction industry practitioners using descriptive statistics, normalization, Kruskal-Wallis, and overlap analysis techniques. The major findings include ‘raise project team awareness on CWR’ and ‘organize temporary bins in each construction zone’ are simple and low-cost enhancement strategies for all organization sizes. Also, there are additional simple and low-cost strategies for LEs: ‘identify construction activities that produce recyclable materials,’ ‘use information technology to facilitate CWR processes,’ and ‘enhance company policies related to CWR.’ These findings contribute to a better knowledge of the optimal CWR enhancement strategies for different organization sizes. Elsevier Ltd. 2022-06 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/34736/1/Construction%20waste%20recycling.pdf pdf en http://umpir.ump.edu.my/id/eprint/34736/2/Construction%20waste%20recycling_FULL.pdf Omer, Mazen M. and Rahimi, A. Rahman and Almutairi, Saud (2022) Construction waste recycling: Enhancement strategies and organization size. Physics and Chemistry of the Earth, Parts A/B/C, 126 (103114). pp. 1-10. ISSN 1474-7065. (Published) https://doi.org/10.1016/j.pce.2022.103114 https://doi.org/10.1016/j.pce.2022.103114
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Omer, Mazen M.
Rahimi, A. Rahman
Almutairi, Saud
Construction waste recycling: Enhancement strategies and organization size
title Construction waste recycling: Enhancement strategies and organization size
title_full Construction waste recycling: Enhancement strategies and organization size
title_fullStr Construction waste recycling: Enhancement strategies and organization size
title_full_unstemmed Construction waste recycling: Enhancement strategies and organization size
title_short Construction waste recycling: Enhancement strategies and organization size
title_sort construction waste recycling: enhancement strategies and organization size
topic TA Engineering (General). Civil engineering (General)
TH Building construction
url http://umpir.ump.edu.my/id/eprint/34736/
http://umpir.ump.edu.my/id/eprint/34736/
http://umpir.ump.edu.my/id/eprint/34736/
http://umpir.ump.edu.my/id/eprint/34736/1/Construction%20waste%20recycling.pdf
http://umpir.ump.edu.my/id/eprint/34736/2/Construction%20waste%20recycling_FULL.pdf