Improve material handling system in Hirotako Acoustic Sdn.Bhd'��s : logistic department area
This thesis deals with the improvement of material handling system in Hirotako Acoustics Sdn.Bhd. Logistic Department area. The first objective of this thesis is to reduce the unnecessary movement of the forklift in reducing the travelled distance and eliminate excessive oil usage. The second object...
| Main Author: | Samylingam, Lingenthiran |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/3449/ http://umpir.ump.edu.my/id/eprint/3449/1/cd6250_47.pdf |
Similar Items
Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
by: Abd Rahman Fahmi, Mat Hasan
Published: (2012)
by: Abd Rahman Fahmi, Mat Hasan
Published: (2012)
Charming Ice Sdn.Bhd / Hafizuddin Zainal Arifin... [et.al]
by: Zainal Arifin, Hafizuddin, et al.
Published: (2011)
by: Zainal Arifin, Hafizuddin, et al.
Published: (2011)
A Study Of Transformational Change The Case Of Telekom Sales And Service Sdn.Bhd
by: Ahmad, Md. Nasir
Published: (2000)
by: Ahmad, Md. Nasir
Published: (2000)
The Team Work Equipment Sdn.Bhd / Dzul Hizzam Zainal … [et al.]
by: Zainal, Dzul Hizzam, et al.
Published: (2003)
by: Zainal, Dzul Hizzam, et al.
Published: (2003)
UMP signed MoU with New Advanced Technology Sdn.Bhd. (NATECH)
by: Muhammad Hafiz Aswad, Ahmad Kamal
Published: (2013)
by: Muhammad Hafiz Aswad, Ahmad Kamal
Published: (2013)
Pra-Boat Sdn.Bhd (Furniture) / Ahmad Hariz Mohd Hishamuddin ... [et al.]
by: Ahmad Hariz, Mohd Hishamuddin, et al.
Published: (2019)
by: Ahmad Hariz, Mohd Hishamuddin, et al.
Published: (2019)
Memorandum of Agreement between Prima Natural Resources & Manufacturing Sdn.Bhd. (MoA)
by: Universiti Malaysia Sarawak
Published: (2006)
by: Universiti Malaysia Sarawak
Published: (2006)
A Case Study on the Supreme Hotel Sdn.Bhd. Strategic Management for Organizational Competitiveness
by: Woo, Pak Yuan
Published: (1997)
by: Woo, Pak Yuan
Published: (1997)
Proposed transportation rates for Nutritional Products Sdn Bhd (The Logistics Department) / Nor Izlida Idris
by: Idris, Nor Izlida
Published: (1991)
by: Idris, Nor Izlida
Published: (1991)
ENT300 Miracle Pet-Shop Sdn.Bhd / Mohd Hafizzi Majid... [et.al]
by: Majid, Mohd Hafizzi, et al.
Published: (2015)
by: Majid, Mohd Hafizzi, et al.
Published: (2015)
Productivity improvement using VSM at TT Electronis Sdn Bhd
by: Muhammad Najmi, Ahmat
Published: (2016)
by: Muhammad Najmi, Ahmat
Published: (2016)
Factors that influenced turnover intention among employees in Nestle Manufacturing (M) Sdn.Bhd. / Mardiana Zakaria
by: Zakaria, Mardiana
Published: (2017)
by: Zakaria, Mardiana
Published: (2017)
Factors that influences job satisfaction among employees of VSS System (M) Sdn.Bhd / Farhana Aris
Published: (2007)
Published: (2007)
The usability of Online Certificate Injection System (OCIS) at Digicert Sdn.Bhd / Wan Razinah Wan Zakaria
by: Wan Zakaria, Wan Razinah
Published: (2006)
by: Wan Zakaria, Wan Razinah
Published: (2006)
Quality control improvement at Jana DCS Sdn. Bhd.
by: Abd Wahab, Muhammad Badrul Amin, et al.
Published: (2020)
by: Abd Wahab, Muhammad Badrul Amin, et al.
Published: (2020)
Production management system (Hicom Teck See Manufacturing Maaysia Sdn. Bhd.) (Quality department)
by: Too, Wan Meng
Published: (2014)
by: Too, Wan Meng
Published: (2014)
Evaluating the performance of material handling system using simulation
by: Lee, Tsu Xin
Published: (2013)
by: Lee, Tsu Xin
Published: (2013)
“A case study on risk management of Naza Automotive Manufacturing Sdn.Bhd.” / Nor Maizatul Asma Misman
by: Misman, Nor Maizatul Asma
Published: (2010)
by: Misman, Nor Maizatul Asma
Published: (2010)
The effectiveness of the internal control system of Auto Bavaria Sdn.Bhd. in addressing fraud cases / Norhidayu Mohd Yunos
by: Mohd Yunos, Norhidayu
Published: (2014)
by: Mohd Yunos, Norhidayu
Published: (2014)
A study on factors that influence the performance
of TNB Kota Bharu Sdn.Bhd / Sharipah Azlena Syed Hassan
by: Syed Hassan, Sharipah Azlena
Published: (2011)
by: Syed Hassan, Sharipah Azlena
Published: (2011)
A survey and improvement of quality at Dataran Setar Sdn Bhd
by: Seow, Wenjia
Published: (2016)
by: Seow, Wenjia
Published: (2016)
Work flow improvement at Kenny Leather (M) Sdn. Bhd.
by: Norazmi, Mohamad Amirul Faiz, et al.
Published: (2020)
by: Norazmi, Mohamad Amirul Faiz, et al.
Published: (2020)
Factor that influences expatriate employees to attriton problems at Scope International (M) Sdn.Bhd / Mohammad Rizman Niger Mahidin
by: Niger Mahidin, Mohammad Rizman
Published: (2010)
by: Niger Mahidin, Mohammad Rizman
Published: (2010)
Motivation towards employee’s commitment at SAJ Holdings Sdn.Bhd / Noor Azilla Ja’afar and Nor Ellyani Johari
by: Ja’afar, Noor Azilla, et al.
Published: (2013)
by: Ja’afar, Noor Azilla, et al.
Published: (2013)
Assessing the psychological preparedness of Emergency Response Team (ERT) at Mobile Switching Centres (MSC) for Digi Telecommunications Sdn.Bhd.
by: Ng, Goot Seong
Published: (2001)
by: Ng, Goot Seong
Published: (2001)
An improvement to the performance measurement system of the logistics operation
by: Jamaludin, Khairur Rijal, et al.
Published: (2007)
by: Jamaludin, Khairur Rijal, et al.
Published: (2007)
To study the viability of Rras Bakti (M) Sdn.Bhd adopting its own distribution channel / Mohd Abidzar Zainol Abidin
by: Zainol Abidin, Mohd Abidzar
Published: (2009)
by: Zainol Abidin, Mohd Abidzar
Published: (2009)
Factors that influence job satisfaction among employees in Felda Global Ventures Plantations (M) Sdn.Bhd. / Muhammad Shyrell Junaidi
by: Junaidi, Muhammad Shyrell
Published: (2014)
by: Junaidi, Muhammad Shyrell
Published: (2014)
The relationship between factor of motivation and employee performance : the study of manufacturing industry in my sutera sdn.bhd pengkalan chepa, Kelantan
by: Norhumaira, Juhai
Published: (2013)
by: Norhumaira, Juhai
Published: (2013)
Lean manufacturing techniques implementation at Zest Venture Sdn Bhd
by: Nur Fakhriah, Mohd Noordin
Published: (2013)
by: Nur Fakhriah, Mohd Noordin
Published: (2013)
Process capability analysis at Chaudry textiles (Malaysia) Sdn Bhd
by: Mohamed Sallehsu, Kamaruzaman
Published: (2008)
by: Mohamed Sallehsu, Kamaruzaman
Published: (2008)
A study of inventory optimization model for Eightdesign Sdn Bhd
by: Siti Aisyah, Abd Wahab
Published: (2014)
by: Siti Aisyah, Abd Wahab
Published: (2014)
Ergonomic design improvement at Koko Minda Food Industries (M) Sdn. Bhd
by: Roslam, Ahmad Nizamuddin, et al.
Published: (2020)
by: Roslam, Ahmad Nizamuddin, et al.
Published: (2020)
Lean production system knowledge improvement by implementing lean production system simulation game at WSA Engineering Sdn Bhd
by: Hajar, Abdullah
Published: (2012)
by: Hajar, Abdullah
Published: (2012)
The study of factors determining service quality of the customer service agents in passenger handling department (KL Airport Services Sdn Bhd) / Azwani Abu Bakar
by: Abu Bakar, Azwani
Published: (2010)
by: Abu Bakar, Azwani
Published: (2010)
Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
by: Lim, Qian Bing
Published: (2012)
by: Lim, Qian Bing
Published: (2012)
Total Productive Maintenance (TPM) approach to improve Overall Equipment Efficiency (OEE) in Robert Bosch Automotive Steering Sdn. Bhd
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
by: Muhammad Quyyum, Sohaimi
Published: (2012)
by: Muhammad Quyyum, Sohaimi
Published: (2012)
The employee's perception towards the adaptation of the new management inventory system in Xyratex (Malaysia) Sdn.Bhd. Senawang, 2007 / Nurashikin Abd Gani
by: Abd Gani, Nurashikin
Published: (2007)
by: Abd Gani, Nurashikin
Published: (2007)
The relationship between working condition and job satisfaction amongst technical employees at Sum Hing Engineering Works Sdn.Bhd. / Nurafiqah Rasul
by: Rasul, Nurafiqah
Published: (2018)
by: Rasul, Nurafiqah
Published: (2018)
Similar Items
-
Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
by: Abd Rahman Fahmi, Mat Hasan
Published: (2012) -
Charming Ice Sdn.Bhd / Hafizuddin Zainal Arifin... [et.al]
by: Zainal Arifin, Hafizuddin, et al.
Published: (2011) -
A Study Of Transformational Change The Case Of Telekom Sales And Service Sdn.Bhd
by: Ahmad, Md. Nasir
Published: (2000) -
The Team Work Equipment Sdn.Bhd / Dzul Hizzam Zainal … [et al.]
by: Zainal, Dzul Hizzam, et al.
Published: (2003) -
UMP signed MoU with New Advanced Technology Sdn.Bhd. (NATECH)
by: Muhammad Hafiz Aswad, Ahmad Kamal
Published: (2013)