Exploring risk associated to public road infrastructure construction projects
This study proposed an empirical study of risk assessment module for public road infrastructure construction projects. This study employs a case study of a public road infrastructure construction projects located at a state in East Coast of Malaysia. The projects involve the construction of new four...
| Main Authors: | , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
IOP Publishing Ltd.
2021
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/31809/ http://umpir.ump.edu.my/id/eprint/31809/1/Exploring%20risk%20associated%20to%20public%20road%20infrastructure%20construction%20projects.pdf |
| _version_ | 1848823862284779520 |
|---|---|
| author | Razi, P. Z. Mohamad Idris, Ali Noram Irwan, Ramli |
| author_facet | Razi, P. Z. Mohamad Idris, Ali Noram Irwan, Ramli |
| author_sort | Razi, P. Z. |
| building | UMP Institutional Repository |
| collection | Online Access |
| description | This study proposed an empirical study of risk assessment module for public road infrastructure construction projects. This study employs a case study of a public road infrastructure construction projects located at a state in East Coast of Malaysia. The projects involve the construction of new four (4) lane road along 5.875km aligned from the state route to federal route. The project will be benefited to the federal and state economic development, while for the local residents, they will benefited with reducing of traffic congestion. However, due to several uncertainties, schedule delays have occurred to the particular area. Thus, this study conducted to explore the risk associated with the project, and four delay factors and thirteen sub-factors have emerged prior to the consultations with project team experts. The delay risk assessed quantitatively employing the Analytic Hierarchy Process (AHP) technique by prioritising the risk delay factors. Design of the AHP model and the operation of the pair-wise rating was employed the super-decision software. The analysis revealed that when considering all factor concerning the goal, the project risk (0.348) captured the most prioritised risk factor that caused by land acquisition issues (0.555), followed by environmental (0.233) caused by the uncertainty of weather (0.733), operational risk (0.309) caused by late submission of approved for construction drawing causing a delay in projects submission delay (0.396) as the last prioritised risk factors in the construction project and technical risk (0.110) caused by the new design does not consider existing drainage system causing flood (0.352). Findings of this study will beneficial to the project team, as the prioritised risk will act as their references and guidance to avoid delays and incurring of project costs. |
| first_indexed | 2025-11-15T03:03:52Z |
| format | Conference or Workshop Item |
| id | ump-31809 |
| institution | Universiti Malaysia Pahang |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T03:03:52Z |
| publishDate | 2021 |
| publisher | IOP Publishing Ltd. |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | ump-318092021-08-20T15:31:32Z http://umpir.ump.edu.my/id/eprint/31809/ Exploring risk associated to public road infrastructure construction projects Razi, P. Z. Mohamad Idris, Ali Noram Irwan, Ramli TA Engineering (General). Civil engineering (General) TE Highway engineering. Roads and pavements This study proposed an empirical study of risk assessment module for public road infrastructure construction projects. This study employs a case study of a public road infrastructure construction projects located at a state in East Coast of Malaysia. The projects involve the construction of new four (4) lane road along 5.875km aligned from the state route to federal route. The project will be benefited to the federal and state economic development, while for the local residents, they will benefited with reducing of traffic congestion. However, due to several uncertainties, schedule delays have occurred to the particular area. Thus, this study conducted to explore the risk associated with the project, and four delay factors and thirteen sub-factors have emerged prior to the consultations with project team experts. The delay risk assessed quantitatively employing the Analytic Hierarchy Process (AHP) technique by prioritising the risk delay factors. Design of the AHP model and the operation of the pair-wise rating was employed the super-decision software. The analysis revealed that when considering all factor concerning the goal, the project risk (0.348) captured the most prioritised risk factor that caused by land acquisition issues (0.555), followed by environmental (0.233) caused by the uncertainty of weather (0.733), operational risk (0.309) caused by late submission of approved for construction drawing causing a delay in projects submission delay (0.396) as the last prioritised risk factors in the construction project and technical risk (0.110) caused by the new design does not consider existing drainage system causing flood (0.352). Findings of this study will beneficial to the project team, as the prioritised risk will act as their references and guidance to avoid delays and incurring of project costs. IOP Publishing Ltd. 2021-02-27 Conference or Workshop Item PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/31809/1/Exploring%20risk%20associated%20to%20public%20road%20infrastructure%20construction%20projects.pdf Razi, P. Z. and Mohamad Idris, Ali and Noram Irwan, Ramli (2021) Exploring risk associated to public road infrastructure construction projects. In: IOP Conference Series: Earth and Environmental Science; th National Conference on Wind and Earthquake Engineering, NCWE 2020 , 16 - 17 October 2020 , Putrajaya (Virtual). pp. 1-9., 682 (1). ISSN 1755-1307 (Published) https://doi.org/10.1088/1755-1315/682/1/012030 |
| spellingShingle | TA Engineering (General). Civil engineering (General) TE Highway engineering. Roads and pavements Razi, P. Z. Mohamad Idris, Ali Noram Irwan, Ramli Exploring risk associated to public road infrastructure construction projects |
| title | Exploring risk associated to public road infrastructure construction
projects |
| title_full | Exploring risk associated to public road infrastructure construction
projects |
| title_fullStr | Exploring risk associated to public road infrastructure construction
projects |
| title_full_unstemmed | Exploring risk associated to public road infrastructure construction
projects |
| title_short | Exploring risk associated to public road infrastructure construction
projects |
| title_sort | exploring risk associated to public road infrastructure construction
projects |
| topic | TA Engineering (General). Civil engineering (General) TE Highway engineering. Roads and pavements |
| url | http://umpir.ump.edu.my/id/eprint/31809/ http://umpir.ump.edu.my/id/eprint/31809/ http://umpir.ump.edu.my/id/eprint/31809/1/Exploring%20risk%20associated%20to%20public%20road%20infrastructure%20construction%20projects.pdf |