A case study on the application of activity-based costing on the inductor component
Traditional cost accounting (TCA) is no longer reflecting the current economic reality due to distorted information about the profitability of their orders, products and customers. A new costing method is required to overcome the shortcoming of TCA in the era of rapidly increasing product complexity...
| Main Authors: | Filzah Lina, Mohd Safeiee, Siti Khadijah, M. Saad, Mohd Yazid, Abu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Faculty of Industrial Technology, Universitas Trisakti
2020
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/30336/ http://umpir.ump.edu.my/id/eprint/30336/7/A%20case%20study%20on%20the%20application.pdf |
Similar Items
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Diagnosis and Costing Optimization on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Optimization using Mahalanobis-Taguchi System for inductor component
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
A case study on the application of activity based costing on the magnetic inductor
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
Application of Activity-Based Costing In Electronic Manufacturing
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
A review on the application of activity-based costing and time driven activity-based costing in manufacturing industry
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
Development of a new costing structure in production environment using activity based costing
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2019)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2019)
Integration of Mahalanobis-Taguchi system and time-driven activity-based costing in production environment
by: Filzah Lina, Mohd Safeiee
Published: (2023)
by: Filzah Lina, Mohd Safeiee
Published: (2023)
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)
by: Mohd Yazid, Abu, et al.
Published: (2019)
A case study on the un-used capacity assessment using time driven activity based costing for magnetic components
by: Areena, Zaini, et al.
Published: (2020)
by: Areena, Zaini, et al.
Published: (2020)
Application of Activity Based Costing for Palm Oil Plantation
by: Chak, Wen Zheng, et al.
Published: (2019)
by: Chak, Wen Zheng, et al.
Published: (2019)
Football speed analysis and game analysis by using image processing
by: Filzah ‪Lina, Mohd Safeiee
Published: (2015)
by: Filzah ‪Lina, Mohd Safeiee
Published: (2015)
Application of mahalanobis-taguchi system on electrical & electronic industry
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2019)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2019)
Comparative study: Activity based costing and time driven activity based costing in electronic industry
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
Integration of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing in a Production Environment
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
Application of activity-based costing and time-driven activity-based costing for kitchen cabinet
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
A case study on the determination of unused capacity using time driven activity-based costing for electronic component
by: N. F., Zamrud, et al.
Published: (2020)
by: N. F., Zamrud, et al.
Published: (2020)
A case study on the application of Mahalanobis-Taguchi system for magnetic component
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Exploring beneficial of Mahalanobis Taguchi Method on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)
by: Mohd Yazid, Abu, et al.
Published: (2019)
Costing improvement of remanufacturing crankshaft by integrating Mahalanobis-Taguchi System and Activity based Costing
by: Mohd Yazid, Abu, et al.
Published: (2018)
by: Mohd Yazid, Abu, et al.
Published: (2018)
Costing structure improvement using activity based costing in palm oil plantation of Malaysia
by: S. N. A. M., Zaini, et al.
Published: (2020)
by: S. N. A. M., Zaini, et al.
Published: (2020)
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Development a new costing structure for palm oil industry using time driven activity based costing
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
Integration of Mahalanobis-Taguchi System and activity based costing for remanufacturing decision
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2018)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2018)
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
Comparative study between product- and service-based operations using time-driven activity-based costing
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021)
by: S. N. A. M., Zaini, et al.
Published: (2021)
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020)
by: N. F. A., Ghani, et al.
Published: (2020)
Feasibility study on the implementation of mahalanobis taguchi system and time driven activity based costing in electronic industry
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
Overall equipment effectiveness analysis of power magnetic inductor production line at BI technologies sdn. bhd.
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
Integration of mahalanobis-taguchi system and activity based costing in decision making for remanufacturing
by: Mohd Yazid, Abu
Published: (2016)
by: Mohd Yazid, Abu
Published: (2016)
A comparative study of activitybased costing (abc) and time-driven activity-based costing (tdabc) on cost accounting
by: Nurul Farahin, Zamrud
Published: (2021)
by: Nurul Farahin, Zamrud
Published: (2021)
Similar Items
-
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020) -
Diagnosis and Costing Optimization on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020) -
Optimization using Mahalanobis-Taguchi System for inductor component
by: Mohd Yazid, Abu, et al.
Published: (2020) -
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020) -
A case study on the application of activity based costing on the magnetic inductor
by: Mohd Yazid, Abu, et al.
Published: (2021)