Modelling and optimisation of assembly line balancing problem with resource constraint

Assembly Line Balancing (ALB) is about distributing the assembly tasks into workstations with the almost equal workload. Previous research mostly assumed that all workstations are having similar capabilities including the machines, tools and worker skills. Recently, researchers started to consider t...

Full description

Bibliographic Details
Main Author: Nur Hairunnisa, Kamarudin
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/30318/
http://umpir.ump.edu.my/id/eprint/30318/1/Modelling%20and%20optimisation%20of%20assembly%20line%20balancing%20problem%20with%20resource%20constraint.wm.pdf
_version_ 1848823481898106880
author Nur Hairunnisa, Kamarudin
author_facet Nur Hairunnisa, Kamarudin
author_sort Nur Hairunnisa, Kamarudin
building UMP Institutional Repository
collection Online Access
description Assembly Line Balancing (ALB) is about distributing the assembly tasks into workstations with the almost equal workload. Previous research mostly assumed that all workstations are having similar capabilities including the machines, tools and worker skills. Recently, researchers started to consider the resource constraints in ALB such as machine and worker. Optimisation of ALB with resource constraints gives a huge benefit to the industry such as increase line efficiency, optimise the resources utilisation and can reduce production cost. This research presents Assembly Line Balancing with resource constraints (ALB-RC) for a simple model with the objectives to minimise the workstation, machine and worker. For the optimisation purpose, this research introducesGenetic Algorithm (GA) with two new crossovers. The crossovers are developed using a ranking approach and known as rank-based crossover type I and type II (RBC-I and RBCII). The GA with new crossover is tested against popular combinatorial crossovers with a wide range of problem difficulties consisting of 17 benchmark problems. The performance of the proposed GA with new crossover in optimisation ALB-RC is finallyvalidated using an industrial case study. The computational experiment results indicated that the proposed GA with new crossovers are able to find the optimal solution for ALBRC better than popular combinatorial crossovers. Meanwhile, the results of industrial case study validated that the proposed ALB-RC model is capable to be used for the realindustrial problem. At the same time, the result indicated that the GA with rank -based crossover is capable to optimise real-life problem. As a comparison, the number of workstation, machine/tools and workers had reduced between 10 – 15% for the optimisedlayout using GA with RBC, compared with the original layout in the case study problem.
first_indexed 2025-11-15T02:57:50Z
format Thesis
id ump-30318
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:57:50Z
publishDate 2019
recordtype eprints
repository_type Digital Repository
spelling ump-303182023-05-17T03:53:36Z http://umpir.ump.edu.my/id/eprint/30318/ Modelling and optimisation of assembly line balancing problem with resource constraint Nur Hairunnisa, Kamarudin TJ Mechanical engineering and machinery Assembly Line Balancing (ALB) is about distributing the assembly tasks into workstations with the almost equal workload. Previous research mostly assumed that all workstations are having similar capabilities including the machines, tools and worker skills. Recently, researchers started to consider the resource constraints in ALB such as machine and worker. Optimisation of ALB with resource constraints gives a huge benefit to the industry such as increase line efficiency, optimise the resources utilisation and can reduce production cost. This research presents Assembly Line Balancing with resource constraints (ALB-RC) for a simple model with the objectives to minimise the workstation, machine and worker. For the optimisation purpose, this research introducesGenetic Algorithm (GA) with two new crossovers. The crossovers are developed using a ranking approach and known as rank-based crossover type I and type II (RBC-I and RBCII). The GA with new crossover is tested against popular combinatorial crossovers with a wide range of problem difficulties consisting of 17 benchmark problems. The performance of the proposed GA with new crossover in optimisation ALB-RC is finallyvalidated using an industrial case study. The computational experiment results indicated that the proposed GA with new crossovers are able to find the optimal solution for ALBRC better than popular combinatorial crossovers. Meanwhile, the results of industrial case study validated that the proposed ALB-RC model is capable to be used for the realindustrial problem. At the same time, the result indicated that the GA with rank -based crossover is capable to optimise real-life problem. As a comparison, the number of workstation, machine/tools and workers had reduced between 10 – 15% for the optimisedlayout using GA with RBC, compared with the original layout in the case study problem. 2019-04 Thesis NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/30318/1/Modelling%20and%20optimisation%20of%20assembly%20line%20balancing%20problem%20with%20resource%20constraint.wm.pdf Nur Hairunnisa, Kamarudin (2019) Modelling and optimisation of assembly line balancing problem with resource constraint. Masters thesis, Universiti Malaysia Pahang (Contributors, Thesis advisor: Mohd Fadzil Faisae, Ab. Rashid).
spellingShingle TJ Mechanical engineering and machinery
Nur Hairunnisa, Kamarudin
Modelling and optimisation of assembly line balancing problem with resource constraint
title Modelling and optimisation of assembly line balancing problem with resource constraint
title_full Modelling and optimisation of assembly line balancing problem with resource constraint
title_fullStr Modelling and optimisation of assembly line balancing problem with resource constraint
title_full_unstemmed Modelling and optimisation of assembly line balancing problem with resource constraint
title_short Modelling and optimisation of assembly line balancing problem with resource constraint
title_sort modelling and optimisation of assembly line balancing problem with resource constraint
topic TJ Mechanical engineering and machinery
url http://umpir.ump.edu.my/id/eprint/30318/
http://umpir.ump.edu.my/id/eprint/30318/1/Modelling%20and%20optimisation%20of%20assembly%20line%20balancing%20problem%20with%20resource%20constraint.wm.pdf