A case study on the un-used capacity assessment using time driven activity based costing for magnetic components
The Electrical & Electronic (E&E) company is one of Malaysia’s leading industries that has 24.5% in manufacturing sector production. With a continuous innovation of E&E company, the current costing being used is hardly to access the complete activities with variations required for each w...
| Main Authors: | Areena, Zaini, Haryantie, Kamil, Mohd Yazid, Abu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Malaysia Pahang
2020
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/29796/ http://umpir.ump.edu.my/id/eprint/29796/7/A%20case%20study%20on%20the%20un-used%20capacity.pdf |
Similar Items
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020)
by: N. F. A., Ghani, et al.
Published: (2020)
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
A case study on the determination of unused capacity using time driven activity-based costing for electronic component
by: N. F., Zamrud, et al.
Published: (2020)
by: N. F., Zamrud, et al.
Published: (2020)
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021)
by: S. N. A. M., Zaini, et al.
Published: (2021)
Feasibility study on the implementation of mahalanobis taguchi system and time driven activity based costing in electronic industry
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Implementing mahalanobis-taguchi system and time-driven activity- based costing for capacity utilization in academic faculty
by: Sri Nur Areena, Mohd Zaini
Published: (2024)
by: Sri Nur Areena, Mohd Zaini
Published: (2024)
Application of activity-based costing and time-driven activity-based costing for kitchen cabinet
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
A case study on the application of Mahalanobis-Taguchi system for magnetic component
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Development a new costing structure for palm oil industry using time driven activity based costing
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
Comparative study between product- and service-based operations using time-driven activity-based costing
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
A case study on the application of activity based costing on the magnetic inductor
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
A review on the application of activity-based costing and time driven activity-based costing in manufacturing industry
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
Comparative study: Activity based costing and time driven activity based costing in electronic industry
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)
by: Mohd Yazid, Abu, et al.
Published: (2019)
A case study in electrical & electronic industry using mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
Mahalanobis-taguchi system and time-driven activity-based costing integration of printed circuit board
by: Nurul Haziyani, Aris, et al.
Published: (2023)
by: Nurul Haziyani, Aris, et al.
Published: (2023)
Integration of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing in a Production Environment
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
A comparative study of activitybased costing (abc) and time-driven activity-based costing (tdabc) on cost accounting
by: Nurul Farahin, Zamrud
Published: (2021)
by: Nurul Farahin, Zamrud
Published: (2021)
Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
by: S. N. A. M., Zaini, et al.
Published: (2020)
by: S. N. A. M., Zaini, et al.
Published: (2020)
Optimization of capacity utilization using time-driven activity-based costing for library system
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Costing structure improvement using activity based costing in palm oil plantation of Malaysia
by: S. N. A. M., Zaini, et al.
Published: (2020)
by: S. N. A. M., Zaini, et al.
Published: (2020)
A case study on the application of activity-based costing on the inductor component
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Development of a new costing structure in production environment using activity based costing
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2019)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2019)
Optimization using Mahalanobis-Taguchi System for inductor component
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
A review on Mahalanobis-Taguchi system and time-driven activity-based costing for production environment
by: Nor Suhadah, Razali, et al.
Published: (2024)
by: Nor Suhadah, Razali, et al.
Published: (2024)
Comparison of activity-based costing and time-driven activity-based costing for printed circuit board assembly production
by: Nur Syafikah, Pinueh, et al.
Published: (2024)
by: Nur Syafikah, Pinueh, et al.
Published: (2024)
Industrial design and manufacturing of a manual driven low cost banana / tapioca / yam slicing machine
by: Johnny Damian, Tawi
Published: (2009)
by: Johnny Damian, Tawi
Published: (2009)
Integration of Mahalanobis-Taguchi System and activity based costing for remanufacturing decision
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2018)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2018)
Integration of Mahalanobis-Taguchi system and time-driven activity-based costing in production environment
by: Filzah Lina, Mohd Safeiee
Published: (2023)
by: Filzah Lina, Mohd Safeiee
Published: (2023)
Comparison of activity-based costing and time-driven activity- based costing for printed circuit board assembly in industry production
by: Nur Syafikah, Pinueh
Published: (2024)
by: Nur Syafikah, Pinueh
Published: (2024)
Similar Items
-
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023) -
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020) -
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020) -
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020) -
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)