Factors that contribute to delay in construction project in Johor

This research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction pr...

Full description

Bibliographic Details
Main Author: Mimi Ereena, Solahudin Alayubi
Format: Undergraduates Project Papers
Language:English
Published: 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29646/
http://umpir.ump.edu.my/id/eprint/29646/1/Factors%20that%20contribute%20to%20delay%20in%20construction.pdf
_version_ 1848823328891994112
author Mimi Ereena, Solahudin Alayubi
author_facet Mimi Ereena, Solahudin Alayubi
author_sort Mimi Ereena, Solahudin Alayubi
building UMP Institutional Repository
collection Online Access
description This research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction project. The research was focus on study the causes of delay in construction project based on contractor-related, consultant-related, client-related categories in Johor, Malaysia. The scope of the research is mainly focus on literature review and a questionnaire survey. The questionnaire survey was designed based on the causes of construction delays, effects of construction delays and the methods of minimizing the construction delays. The respondent involved in this research is contractor, consultant, and client. Through the literature review, 11 factors were selected for contractor related, 8 factors were selected for consultant related and 7 factors were selected for client related. A set of questionnaire were prepared which consist of three sections. Out of 150 respondent targeted only 104 respondent had completely answered the survey that had been distributed by hand, e-mail and link using online survey. The data was analysed using Average Index method and each factor was ranked. From the data analysis, delay in approving major changes of work by consultant is the highest average index that contribute to the causes of delay with average index value is 4.221 under the scale ‘Agree’. For method to minimize delay in construction project, most of the respondent agree on effective strategic planning which has the highest value of average index which is 4.462.
first_indexed 2025-11-15T02:55:24Z
format Undergraduates Project Papers
id ump-29646
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:55:24Z
publishDate 2019
recordtype eprints
repository_type Digital Repository
spelling ump-296462020-10-20T00:14:57Z http://umpir.ump.edu.my/id/eprint/29646/ Factors that contribute to delay in construction project in Johor Mimi Ereena, Solahudin Alayubi TA Engineering (General). Civil engineering (General) This research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction project. The research was focus on study the causes of delay in construction project based on contractor-related, consultant-related, client-related categories in Johor, Malaysia. The scope of the research is mainly focus on literature review and a questionnaire survey. The questionnaire survey was designed based on the causes of construction delays, effects of construction delays and the methods of minimizing the construction delays. The respondent involved in this research is contractor, consultant, and client. Through the literature review, 11 factors were selected for contractor related, 8 factors were selected for consultant related and 7 factors were selected for client related. A set of questionnaire were prepared which consist of three sections. Out of 150 respondent targeted only 104 respondent had completely answered the survey that had been distributed by hand, e-mail and link using online survey. The data was analysed using Average Index method and each factor was ranked. From the data analysis, delay in approving major changes of work by consultant is the highest average index that contribute to the causes of delay with average index value is 4.221 under the scale ‘Agree’. For method to minimize delay in construction project, most of the respondent agree on effective strategic planning which has the highest value of average index which is 4.462. 2019-05 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/29646/1/Factors%20that%20contribute%20to%20delay%20in%20construction.pdf Mimi Ereena, Solahudin Alayubi (2019) Factors that contribute to delay in construction project in Johor. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
spellingShingle TA Engineering (General). Civil engineering (General)
Mimi Ereena, Solahudin Alayubi
Factors that contribute to delay in construction project in Johor
title Factors that contribute to delay in construction project in Johor
title_full Factors that contribute to delay in construction project in Johor
title_fullStr Factors that contribute to delay in construction project in Johor
title_full_unstemmed Factors that contribute to delay in construction project in Johor
title_short Factors that contribute to delay in construction project in Johor
title_sort factors that contribute to delay in construction project in johor
topic TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/29646/
http://umpir.ump.edu.my/id/eprint/29646/1/Factors%20that%20contribute%20to%20delay%20in%20construction.pdf