Factors that contribute to delay in construction project in Johor

This research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction pr...

Full description

Bibliographic Details
Main Author: Mimi Ereena, Solahudin Alayubi
Format: Undergraduates Project Papers
Language:English
Published: 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29646/
http://umpir.ump.edu.my/id/eprint/29646/1/Factors%20that%20contribute%20to%20delay%20in%20construction.pdf
Description
Summary:This research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction project. The research was focus on study the causes of delay in construction project based on contractor-related, consultant-related, client-related categories in Johor, Malaysia. The scope of the research is mainly focus on literature review and a questionnaire survey. The questionnaire survey was designed based on the causes of construction delays, effects of construction delays and the methods of minimizing the construction delays. The respondent involved in this research is contractor, consultant, and client. Through the literature review, 11 factors were selected for contractor related, 8 factors were selected for consultant related and 7 factors were selected for client related. A set of questionnaire were prepared which consist of three sections. Out of 150 respondent targeted only 104 respondent had completely answered the survey that had been distributed by hand, e-mail and link using online survey. The data was analysed using Average Index method and each factor was ranked. From the data analysis, delay in approving major changes of work by consultant is the highest average index that contribute to the causes of delay with average index value is 4.221 under the scale ‘Agree’. For method to minimize delay in construction project, most of the respondent agree on effective strategic planning which has the highest value of average index which is 4.462.