Factors influencing Industrialized Building System (IBS) project performance: a systematic review
Industrialized Building System (IBS) is a form of construction with focused processes comprise of methods, products and a set of connected components which work together to achieve objectives. Malaysian construction industry is one of contributors towards the development of the...
| Main Authors: | Yusmin, Jaafar, Lee, Chia Kuang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universiti Malaysia Pahang
2020
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/29455/ http://umpir.ump.edu.my/id/eprint/29455/1/Factors%20Influencing%20Industrialized%20Building%20System.pdf |
Similar Items
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008)
by: Alaghbari, Wa’el, et al.
Published: (2008)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Prioritization of Factors Influencing Safety Performance on Construction Sites: A Study Based on Grade Seven (G7) Main Contractors' Perspectives
by: Lee, Chia Kuang, et al.
Published: (2013)
by: Lee, Chia Kuang, et al.
Published: (2013)
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)
by: Norsyazwani, Masri
Published: (2019)
Safety aspect in installation industrialized building system (IBS) component
by: Noor Yuhana, Maamor
Published: (2009)
by: Noor Yuhana, Maamor
Published: (2009)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Project management performance and its influence on Malaysian building projects
by: Adeleke, A. Q., et al.
Published: (2019)
by: Adeleke, A. Q., et al.
Published: (2019)
A review of embodied energy (EM) analysis of Industrialised Building System (IBS)
by: Zaini, N., et al.
Published: (2016)
by: Zaini, N., et al.
Published: (2016)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016)
by: Yunus, Riduan, et al.
Published: (2016)
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)
by: Md. Ali, Massofia, et al.
Published: (2018)
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance
by: Siti Azira, Abd Rahim*, et al.
Published: (2020)
by: Siti Azira, Abd Rahim*, et al.
Published: (2020)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Interior design and construction project management: performance and productivity in Malaysian building industry
by: Jasmani, Ismail
Published: (2016)
by: Jasmani, Ismail
Published: (2016)
Industrialised Building Systems (IBS) in Malaysian construction industry / Dr Hjh Hamimah Adnan and Nor Azmi Ahmad Bari
by: Adnan, Hamimah, et al.
Published: (2007)
by: Adnan, Hamimah, et al.
Published: (2007)
Industrialised Building System (Ibs)
Scoring System - Case Study
by: Ibrahim, Siti Rus‘Adneen
Published: (2006)
by: Ibrahim, Siti Rus‘Adneen
Published: (2006)
Compatibility issues of Industrialized Building System (IBS) in interior construction: a case study in Kuala Lumpur
by: Yaman, Rostam, et al.
Published: (2019)
by: Yaman, Rostam, et al.
Published: (2019)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Cost issue: Key limiting factor that affects IBS application in Malaysian construction industry
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
Best practices in managing goal and strategies for multi-projects in building construction industry
by: Megat Abdullah, Aminatuzuhariah
Published: (2009)
by: Megat Abdullah, Aminatuzuhariah
Published: (2009)
Development of a Knowledge-Based Energy Damage for evaluating Industrialised Building Systems (IBS) Occupational Health and Safety (OHS) Risk
by: Abas, Nor Haslinda
Published: (2015)
by: Abas, Nor Haslinda
Published: (2015)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
An investigation on benefits and future expectation of Industrialised Building System (IBS) implementation in construction practices
by: Ismail, Hassan, et al.
Published: (2018)
by: Ismail, Hassan, et al.
Published: (2018)
Sales expense strategies for competitive pricing of industrial building system (IBS) components
by: Aziz, N. D., et al.
Published: (2021)
by: Aziz, N. D., et al.
Published: (2021)
A review of delay factors in Malaysian Industrialized Building System (IBS) construction project
by: Mohd Nasir, Najuwa, et al.
Published: (2016)
by: Mohd Nasir, Najuwa, et al.
Published: (2016)
The major factors influencing the selection of building materials for sustainable buildings in Malaysia according to green building index (GBI)
by: Law, Geok Kian
Published: (2011)
by: Law, Geok Kian
Published: (2011)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018)
by: Lim, Chun Fee, et al.
Published: (2018)
Critical success factor model framework for lean management application in industrialised building system (IBS) production
by: Mohd Noor, Siti Rahimah
Published: (2020)
by: Mohd Noor, Siti Rahimah
Published: (2020)
Examine the perception on the integration of building information modelling and artificial intelligence in construction projects
by: Lee, Jie Anne
Published: (2021)
by: Lee, Jie Anne
Published: (2021)
A Critical Review of Factors Affecting Manpower and Equipment
Productivity in Tall Building Construction Projects
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017)
The application of industrialised building system in residential project
by: Syazana, Abdul Aziz
Published: (2010)
by: Syazana, Abdul Aziz
Published: (2010)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
A systematic review of the technological factors affecting the adoption of advanced IT with specific emphasis on building information modeling
by: Elghdban, Mohamed Ghayth, et al.
Published: (2021)
by: Elghdban, Mohamed Ghayth, et al.
Published: (2021)
Strategies to improve customer satisfaction with Industrialised Building System (IBS) houses and IBS adoption using Quality Function Deployment (QFD) application : a Malaysia based study / Nuzul Azam Haron
by: Nuzul Azam, Haron
Published: (2012)
by: Nuzul Azam, Haron
Published: (2012)
Similar Items
-
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010) -
Prioritization of Factors Influencing Safety Performance on Construction Sites: A Study Based on Grade Seven (G7) Main Contractors' Perspectives
by: Lee, Chia Kuang, et al.
Published: (2013) -
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)