APA (7th ed.) Citation

Mohd Yazid, A. (2020). Implication of time equation in mature and immature area of ramp using time driven activity based costing. Penerbit UMP.

Chicago Style (17th ed.) Citation

Mohd Yazid, Abu. Implication of Time Equation in Mature and Immature Area of Ramp Using Time Driven Activity Based Costing. Penerbit UMP, 2020.

MLA (9th ed.) Citation

Mohd Yazid, Abu. Implication of Time Equation in Mature and Immature Area of Ramp Using Time Driven Activity Based Costing. Penerbit UMP, 2020.

Warning: These citations may not always be 100% accurate.