Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company

This paper is aim to increase productivity of a case study’s company by eliminating of all possible non value added activities. The study is carried out at a speaker unit of ABC’s company, Malaysia. The current value stream map of production line was developed based on interviews, observations and o...

Full description

Bibliographic Details
Main Authors: Ahmad Nasser, Mohd Rose, Nik Mohd Zuki, Nik Mohamed, Mohd Fadzil Faisae, Ab Rashid, H. M, Noor, Alias, Mohd
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2020
Subjects:
Online Access:https://umpir.ump.edu.my/id/eprint/29377/
_version_ 1848827279759638528
author Ahmad Nasser, Mohd Rose
Nik Mohd Zuki, Nik Mohamed
Mohd Fadzil Faisae, Ab Rashid
H. M, Noor
Alias, Mohd
author_facet Ahmad Nasser, Mohd Rose
Nik Mohd Zuki, Nik Mohamed
Mohd Fadzil Faisae, Ab Rashid
H. M, Noor
Alias, Mohd
author_sort Ahmad Nasser, Mohd Rose
building UMP Institutional Repository
collection Online Access
description This paper is aim to increase productivity of a case study’s company by eliminating of all possible non value added activities. The study is carried out at a speaker unit of ABC’s company, Malaysia. The current value stream map of production line was developed based on interviews, observations and other data of the company. Then, the future VSM was mapped based on the lean manufacturing principles. The current VSM was identified 12 NVA activities and the improved VSM managed to eliminate all 10 NVA activities. The elimination of NVAs was successfully achieved by applying selected lean tools and techniques. All hidden and cause of wastes were identified and eliminated. As a result the application of VSM has improved company performance by increasing the productivity by 35% and production lead time up to 400%.
first_indexed 2025-11-15T03:58:12Z
format Conference or Workshop Item
id ump-29377
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T03:58:12Z
publishDate 2020
publisher IOP Publishing
recordtype eprints
repository_type Digital Repository
spelling ump-293772025-10-03T03:45:50Z https://umpir.ump.edu.my/id/eprint/29377/ Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company Ahmad Nasser, Mohd Rose Nik Mohd Zuki, Nik Mohamed Mohd Fadzil Faisae, Ab Rashid H. M, Noor Alias, Mohd HD28 Management. Industrial Management TK Electrical engineering. Electronics Nuclear engineering TS Manufactures This paper is aim to increase productivity of a case study’s company by eliminating of all possible non value added activities. The study is carried out at a speaker unit of ABC’s company, Malaysia. The current value stream map of production line was developed based on interviews, observations and other data of the company. Then, the future VSM was mapped based on the lean manufacturing principles. The current VSM was identified 12 NVA activities and the improved VSM managed to eliminate all 10 NVA activities. The elimination of NVAs was successfully achieved by applying selected lean tools and techniques. All hidden and cause of wastes were identified and eliminated. As a result the application of VSM has improved company performance by increasing the productivity by 35% and production lead time up to 400%. IOP Publishing 2020 Conference or Workshop Item PeerReviewed pdf en cc_by https://umpir.ump.edu.my/id/eprint/29377/1/38.%20Improving%20productivity%20through%20value%20stream%20mapping%20%28VSM%29.pdf Ahmad Nasser, Mohd Rose and Nik Mohd Zuki, Nik Mohamed and Mohd Fadzil Faisae, Ab Rashid and H. M, Noor and Alias, Mohd (2020) Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company. In: Journal of Physics: Conference Series. 4th International Conference on Engineering Technology 2019, ICET 2019 , 6-7 July 2019 , Terengganu, Malaysia. pp. 1-7., 1532 (1). ISSN 1742-6588 (print); 1742-6596 (online) (Published) http://doi.org/10.1088/1742-6596/1532/1/012005
spellingShingle HD28 Management. Industrial Management
TK Electrical engineering. Electronics Nuclear engineering
TS Manufactures
Ahmad Nasser, Mohd Rose
Nik Mohd Zuki, Nik Mohamed
Mohd Fadzil Faisae, Ab Rashid
H. M, Noor
Alias, Mohd
Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
title Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
title_full Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
title_fullStr Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
title_full_unstemmed Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
title_short Improving productivity through value stream mapping (VSM): A case study at electrical & electronic company
title_sort improving productivity through value stream mapping (vsm): a case study at electrical & electronic company
topic HD28 Management. Industrial Management
TK Electrical engineering. Electronics Nuclear engineering
TS Manufactures
url https://umpir.ump.edu.my/id/eprint/29377/
https://umpir.ump.edu.my/id/eprint/29377/