Tracking of u-turn behaviour for heavy vehicles at three locations along FR2 (Gambang to Kuantan)
The present study provides a methodology for identification of the conflict zone between a turning vehicle and on-coming vehicles at u-turn area. The main purpose of this study is to analysis the u-turn behaviour for the heavy vehicle. In the previous studies, it has been shown that the u-turn behav...
| Main Author: | Mohamad Azmil Sahidan, Abdul Shatar |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/28955/ http://umpir.ump.edu.my/id/eprint/28955/1/Tracking%20of%20u-turn%20behaviour%20for%20heavy%20vehicles%20at%20three%20locations.pdf |
Similar Items
Performance monitoring of Kuantan-Gambang (FR 2) and Gambang toll plaza (FR 222)-Muadzam (FR 12) cross junction using Malaysian intelligent traffic system (MITS)
by: Wong Choon Kit, Kevin
Published: (2019)
by: Wong Choon Kit, Kevin
Published: (2019)
Sustainability study of u-turn at km16 – km 18, Jalan Kuantan - Gambang
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
Determination of selected heavy metal in road dust along Gambang-Kuatan road
by: Abu Bakar, Zulkiflli
Published: (2012)
by: Abu Bakar, Zulkiflli
Published: (2012)
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012)
by: Hazlyza, Zainon
Published: (2012)
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012)
by: Amrina, Abu Bakar
Published: (2012)
Determination of total polycyclic aromatic hydrocarbon (PAHs) in road dust along Kuantan-Gambang road
by: Nur Arifah , Jaafar
Published: (2012)
by: Nur Arifah , Jaafar
Published: (2012)
Relationship between roadside features and road traffic accidents along KM 3 - KM 27 of Jalan Kuantan-Gambang
by: Marzida, Abdul Manaf
Published: (2010)
by: Marzida, Abdul Manaf
Published: (2010)
Seat belt system (vehicle tracking and emergency location tracking)
by: Muhammad Firdaus, Has Abdullah@Hasbullah
Published: (2022)
by: Muhammad Firdaus, Has Abdullah@Hasbullah
Published: (2022)
Determination of heavy metals in Gambang Lake Water
by: Nur Fatiha , Amat Sani
Published: (2012)
by: Nur Fatiha , Amat Sani
Published: (2012)
Development of vehicle lane changing model within u-turn facilities
by: Nemmang, Mohd Shafie
Published: (2017)
by: Nemmang, Mohd Shafie
Published: (2017)
Site investigation on Sg. Belat bridge and road approaching KM1 federal road FR012 Jalan Gambang-Muadzam Shah, Pahang
by: Nur Wahidah, Kamaruddin
Published: (2012)
by: Nur Wahidah, Kamaruddin
Published: (2012)
Study on current practice of construction waste management system in Gambang, Kuantan, Pahang
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
Risk and mitigation of vehicles parking for Gambang University Malaysia Pahang (UMP)
by: Zainurulaini, Zainal Abidin
Published: (2010)
by: Zainurulaini, Zainal Abidin
Published: (2010)
Vehicle growth trends in Universiti Malaysia Pahang Gambang and Pekan campus
by: Siti Nur Liyana, Sheikh Roslan
Published: (2017)
by: Siti Nur Liyana, Sheikh Roslan
Published: (2017)
Tracking devices could turn tide
by: Babulal, Veena
Published: (2021)
by: Babulal, Veena
Published: (2021)
U-turn on WFH policy lauded
by: Hassan, Hakem
Published: (2021)
by: Hassan, Hakem
Published: (2021)
Case study on supply and demand for parking facilities at LYC Hypermarket (road Gambang-Kuantan)
by: Nurshahira Saidatul Hasna , Abdul Jabar
Published: (2015)
by: Nurshahira Saidatul Hasna , Abdul Jabar
Published: (2015)
A study of the heavy metal in tap water quality in Gambang area, Pahang
by: Noraina, Mohd Khlapiah
Published: (2017)
by: Noraina, Mohd Khlapiah
Published: (2017)
A low-cost yet accurate approach to a vehicle location tracking system
by: Abdul Rahman, Abdul Wahab, et al.
Published: (1997)
by: Abdul Rahman, Abdul Wahab, et al.
Published: (1997)
Simulated steerability of a segmented rubber tracked vehicle during turning on sepang peat terrain in Malaysia
by: Rahman, Mohammed Ataur, et al.
Published: (2005)
by: Rahman, Mohammed Ataur, et al.
Published: (2005)
Focus on Gambang
by: M. M., Yusoff, et al.
Published: (2008)
by: M. M., Yusoff, et al.
Published: (2008)
Dangerous driving among heavy vehicle drivers along Jalan Batu Pahat-Kluang (FT050)
by: Edward, Terence Telajan, et al.
Published: (2022)
by: Edward, Terence Telajan, et al.
Published: (2022)
Evaluation on the operational effects of U-turn movement
by: Siti Aisyah, Zakaria
Published: (2012)
by: Siti Aisyah, Zakaria
Published: (2012)
Efficiency of slow sand filter in purifying of tube well water in Kg. Fajar, Gambang, Kuantan
by: Nurul Masliana, Khairil Anuar
Published: (2015)
by: Nurul Masliana, Khairil Anuar
Published: (2015)
Study on current practice of solid waste management system in Gambang residential area Kuantan, Pahang
by: Nor Zariefa, Zahari
Published: (2016)
by: Nor Zariefa, Zahari
Published: (2016)
A research on critical factors that influence construction productivity related to human power in Gambang and Kuantan
by: Nurul Anis , Mazni
Published: (2013)
by: Nurul Anis , Mazni
Published: (2013)
Determination of the high water mark and its location along a coastline
by: Liu, Xin
Published: (2013)
by: Liu, Xin
Published: (2013)
The optimum location of outrigger in reducing the along-wind and across-wind responses
by: Abd. Samal, Roslinda, et al.
Published: (2008)
by: Abd. Samal, Roslinda, et al.
Published: (2008)
Sehati@Gambang bantu masyarakat
by: Mimi Rabita, Abdul Wahit
Published: (2016)
by: Mimi Rabita, Abdul Wahit
Published: (2016)
Pekan Gambang pesat membangun
by: Mohamad Shofi, Mat Isa
Published: (2015)
by: Mohamad Shofi, Mat Isa
Published: (2015)
Tippling but not toppling: Eubulus PCG fr. 123
by: Thomas, O.
Published: (2018)
by: Thomas, O.
Published: (2018)
Unmanned Aerial Vehicle (UAV) for Slope Mapping at Perumahan Gambang Damai, Pahang: A Case Study
by: M. F., Ishak, et al.
Published: (2022)
by: M. F., Ishak, et al.
Published: (2022)
Application of GIS Analyzing Settlement Along Pekan-Kuantan Federal Road
by: Mohamad Idris, Ali, et al.
Published: (2011)
by: Mohamad Idris, Ali, et al.
Published: (2011)
Heavy metals in mangrove sediments along the Selangor River, Malaysia
by: Nyangon, Laurna, et al.
Published: (2019)
by: Nyangon, Laurna, et al.
Published: (2019)
Dynamic modelling and validation of tracked vehicle with in-track motor
by: Noor Amira Ilyanie Ruslan,, et al.
Published: (2024)
by: Noor Amira Ilyanie Ruslan,, et al.
Published: (2024)
An Algorithm for Vehicle Detection and Tracking
by: Malik , Aamir Saeed
Published: (2010)
by: Malik , Aamir Saeed
Published: (2010)
Vehicle detection and tracking method
by: Suzana, Mohamed Salleh
Published: (2019)
by: Suzana, Mohamed Salleh
Published: (2019)
Utar Vehicles Tracking App
by: Wong, Jia Ying
Published: (2021)
by: Wong, Jia Ying
Published: (2021)
Traction mechanics of the designed and developed segmented rubber track vehicle for Sepang peat terrain in Malaysia during turning motion: theoretical and experimental analysis
by: Rahman, Mohammed Ataur, et al.
Published: (2006)
by: Rahman, Mohammed Ataur, et al.
Published: (2006)
Exploration on traffic characteristics and gap assessment on midblock U-turn facilities
by: Mohamad Hilmi, Hamizan
Published: (2018)
by: Mohamad Hilmi, Hamizan
Published: (2018)
Similar Items
-
Performance monitoring of Kuantan-Gambang (FR 2) and Gambang toll plaza (FR 222)-Muadzam (FR 12) cross junction using Malaysian intelligent traffic system (MITS)
by: Wong Choon Kit, Kevin
Published: (2019) -
Sustainability study of u-turn at km16 – km 18, Jalan Kuantan - Gambang
by: Nor Azliayana, Ahmad Nordin
Published: (2017) -
Determination of selected heavy metal in road dust along Gambang-Kuatan road
by: Abu Bakar, Zulkiflli
Published: (2012) -
Review of speed limit for FR222 access road to Gambang toll
by: Hazlyza, Zainon
Published: (2012) -
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012)