Key drivers for adopting design-build: a comparison study among construction project stakeholders
The construction industry in Malaysia recognises the need for a relationship-based procurement by considering the stakeholders to promote the right project delivery method. Design-Build (D-B) is an alternative procurement method that can overcome the incompleteness of Design-Bid-Build (D-B-B) in de...
| Main Authors: | Z. P., Lee, R. A., Rahman, S. I., Doh |
|---|---|
| Format: | Article |
| Language: | English English |
| Published: |
Elsevier Ltd.
2020
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/28831/ http://umpir.ump.edu.my/id/eprint/28831/2/21.%20Key%20drivers%20for%20adopting%20design%20-%20build%20-%20a%20comparison%20study%20among%20construction%20project%20stakeholders.pdf http://umpir.ump.edu.my/id/eprint/28831/3/21.1%20Key%20drivers%20for%20adopting%20design%20-%20build%20-%20a%20comparison%20study%20among%20construction%20project%20stakeholders.pdf |
Similar Items
Key drivers for adopting design build: A comparative study between project stakeholders
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Key drivers for adopting design-build in public construction projects: Malaysian perspective
by: Zheng, Ping Lee, et al.
Published: (2021)
by: Zheng, Ping Lee, et al.
Published: (2021)
Key constraint in construction industry: A review
by: Nurul Athirah, R., et al.
Published: (2022)
by: Nurul Athirah, R., et al.
Published: (2022)
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Essential Skills And Training Provisions For Building Project Stakeholders In Palestine
by: Enshassi, Adnan, et al.
Published: (2009)
by: Enshassi, Adnan, et al.
Published: (2009)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Interior design and construction project management: performance and productivity in Malaysian building industry
by: Jasmani, Ismail
Published: (2016)
by: Jasmani, Ismail
Published: (2016)
Stakeholders’ perception on critical cost variation factors in Malaysian building projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
An Examination of the Key Drivers of Amendments to the Standard Forms of Contract in the South African Construction Industry
by: Mewomo, Modupe Cecilia, et al.
Published: (2018)
by: Mewomo, Modupe Cecilia, et al.
Published: (2018)
Readiness of digital technology adoption in the Malaysian construction project management
by: Ong, Jiun Ren
Published: (2020)
by: Ong, Jiun Ren
Published: (2020)
WELL building: Key design features for office environments
by: Tan, Carmen Y. M., et al.
Published: (2023)
by: Tan, Carmen Y. M., et al.
Published: (2023)
Adoption of Building Information Modelling (BIM) on Railway Transportation Project in Malaysia
by: Ng, Wei Yean
Published: (2018)
by: Ng, Wei Yean
Published: (2018)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Examine the perception on the integration of building information modelling and artificial intelligence in construction projects
by: Lee, Jie Anne
Published: (2021)
by: Lee, Jie Anne
Published: (2021)
BIM in Kenyan construction industry: Benefits, challenges, and adoption processes in sustainable construction projects
by: Alakhali, Ahmed K., et al.
Published: (2024)
by: Alakhali, Ahmed K., et al.
Published: (2024)
Development of a conceptual integrated influential factors (IIF) model of internal stakeholder for construction projects successful completion in Yemen
by: Al-Fadhal, Najib, et al.
Published: (2018)
by: Al-Fadhal, Najib, et al.
Published: (2018)
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018)
Factors effecting the cost management in construction projects
by: M. A., Faten Albtoush, et al.
Published: (2019)
by: M. A., Faten Albtoush, et al.
Published: (2019)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Measures for mitigating the delay in high-rise building construction projects in Dubai
by: Bhatti, Imtiaz Ali
Published: (2019)
by: Bhatti, Imtiaz Ali
Published: (2019)
A Study Of Steel Structure Design & Build System In Construction Industry
by: Sheng, Lee Kok
Published: (2015)
by: Sheng, Lee Kok
Published: (2015)
Project characteristics for design and build procurement in Malaysian construction industry
by: Gambo, M.M., et al.
Published: (2015)
by: Gambo, M.M., et al.
Published: (2015)
Investigating the relationship between site supervision and IBS based construction projects
by: Saad, M. Syamsyul H., et al.
Published: (2019)
by: Saad, M. Syamsyul H., et al.
Published: (2019)
Best practices in managing goal and strategies for multi-projects in building construction industry
by: Megat Abdullah, Aminatuzuhariah
Published: (2009)
by: Megat Abdullah, Aminatuzuhariah
Published: (2009)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
Framework for Managing the Traffic Impacts of Building
Construction Projects
by: Hyari, Khaled Hesham, et al.
Published: (2015)
by: Hyari, Khaled Hesham, et al.
Published: (2015)
The comparison between conventional and industrialized building system formwork towards sustainable construction
by: Mohd Bakri, Muhammad Hassan
Published: (2008)
by: Mohd Bakri, Muhammad Hassan
Published: (2008)
Design and construction of attire dryer for high-rise building
by: Lam, Chin Yueh
Published: (2004)
by: Lam, Chin Yueh
Published: (2004)
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest
by: Nor Aini , Abdul
Published: (2014)
by: Nor Aini , Abdul
Published: (2014)
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen
by: AL-Fadhali,, Najib, et al.
Published: (2018)
by: AL-Fadhali,, Najib, et al.
Published: (2018)
Determining The Effects Of Adopting
Green Construction Site Practices On
Project Performance In Nigeria
by: Hilary, Omatule Onubi
Published: (2020)
by: Hilary, Omatule Onubi
Published: (2020)
Barriers of new concrete technology adoption in Malaysian construction industry
by: Lee, Kar Chun
Published: (2016)
by: Lee, Kar Chun
Published: (2016)
Investigating influential factors of technology adoption in construction safety management
by: Lee, Karen Pei Han
Published: (2021)
by: Lee, Karen Pei Han
Published: (2021)
Adoption of building information modelling in Libyan construction firms: A technological, organizational, and environmental (TOE) perspectives
by: Elghdban, Mohamed Ghayth, et al.
Published: (2023)
by: Elghdban, Mohamed Ghayth, et al.
Published: (2023)
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
by: Nor Haslinda, A., et al.
Published: (2018)
by: Nor Haslinda, A., et al.
Published: (2018)
Problems of building defects after handing over the key
by: Nur Darwani, Abd Rahman
Published: (2012)
by: Nur Darwani, Abd Rahman
Published: (2012)
The Adoption of Green Buildings among Contractors in Malaysia
by: Issanorazura, Idris, et al.
Published: (2023)
by: Issanorazura, Idris, et al.
Published: (2023)
The implementation of design and build procurement approach in local construction industry
by: Pang, Sheh Haur
Published: (2003)
by: Pang, Sheh Haur
Published: (2003)
Similar Items
-
Key drivers for adopting design build: A comparative study between project stakeholders
by: Lee, Z. P., et al.
Published: (2020) -
Key drivers for adopting design-build in public construction projects: Malaysian perspective
by: Zheng, Ping Lee, et al.
Published: (2021) -
Key constraint in construction industry: A review
by: Nurul Athirah, R., et al.
Published: (2022) -
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020) -
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)