APA (7th ed.) Citation

N. F. A., G., S. N. A. M., Z., & Mohd Yazid, A. (2020). Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry. Penerbit UMP.

Chicago Style (17th ed.) Citation

N. F. A., Ghani, Zaini S. N. A. M., and Abu Mohd Yazid. Assessment the Unused Capacity Using Time Driven Activity Based Costing in Automotive Manufacturing Industry. Penerbit UMP, 2020.

MLA (9th ed.) Citation

N. F. A., Ghani, et al. Assessment the Unused Capacity Using Time Driven Activity Based Costing in Automotive Manufacturing Industry. Penerbit UMP, 2020.

Warning: These citations may not always be 100% accurate.