The factors influence to reduce the cost for implementing industrialized building system (IBS) in Malaysia
IBS is a construction system using pre-fabricated components. The manufacturing of the components is systematically organize using machine, formworks and other forms of mechanical equipment. The components are manufactured in the factory and once completed will be delivered to construction sites for...
| Main Author: | Siti Aisah, Abu Bakar |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2018
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/27817/ http://umpir.ump.edu.my/id/eprint/27817/1/The%20factors%20influence%20to%20reduce%20the%20cost%20for%20implementing%20industrialized%20building%20system.pdf |
Similar Items
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)
by: Md. Ali, Massofia, et al.
Published: (2018)
Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
by: Wong, Ng Ni
Published: (2021)
by: Wong, Ng Ni
Published: (2021)
Barriers in the implementation of IBS formwork in Malaysian construction industry
by: Siti Nur Syafiqah, Mohd Sa'don
Published: (2017)
by: Siti Nur Syafiqah, Mohd Sa'don
Published: (2017)
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018)
by: Lim, Chun Fee, et al.
Published: (2018)
Safety aspect in installation of industrialized building system (IBS) formwork in Malaysian construction industry
by: Nur Izzati, Adnan
Published: (2018)
by: Nur Izzati, Adnan
Published: (2018)
Productivity Of Construction Projects With Industrialized Building System (IBS) Technology Adoption
by: Akashah, Muhammad Amirul
Published: (2017)
by: Akashah, Muhammad Amirul
Published: (2017)
Sales expense strategies for competitive pricing of industrial building system (IBS) components
by: Aziz, N. D., et al.
Published: (2021)
by: Aziz, N. D., et al.
Published: (2021)
The Impact of Industrialised Building System (IBS) On Local Labour
by: Lui, Jing Wen
Published: (2020)
by: Lui, Jing Wen
Published: (2020)
Factors influencing the construction cost of Industrialised Building System (IBS) projects
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012)
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012)
Significant usage of slab and wall form technique in industrialised building systems (IBS) for low cost highrise apartments construction
by: Abdul Rahman, Redzuan
Published: (2006)
by: Abdul Rahman, Redzuan
Published: (2006)
Adoption Of Industrialised Building System (Ibs) In Building Projects Based On Disaster Risk Management Cycle
by: Pauzi, Nurshelawati Mohd
Published: (2022)
by: Pauzi, Nurshelawati Mohd
Published: (2022)
Factors influencing Industrialized Building System (IBS) project performance: a systematic review
by: Yusmin, Jaafar, et al.
Published: (2020)
by: Yusmin, Jaafar, et al.
Published: (2020)
Industrialized building system (IBS)-the effect of plywood thickness on the profiled steel sheeting dry board screw stiffness through push out test
by: Nor Azilla, Rozali
Published: (2014)
by: Nor Azilla, Rozali
Published: (2014)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
Seismic response of precast and IBS buildings under earthquake attacks
by: Hamid, N. H., et al.
Published: (2019)
by: Hamid, N. H., et al.
Published: (2019)
Critical Success Factors Of Implementing Industrialised Building System
by: Lim, Shin Sheng
Published: (2021)
by: Lim, Shin Sheng
Published: (2021)
Industrialised Building System (IBS) Quality Testing For Disaster Resilience From Technical And Non-Technical Perspectives
by: Moreen, Daryl Justine
Published: (2018)
by: Moreen, Daryl Justine
Published: (2018)
Critical Success Factors Of The Green Building Implementation In Malaysian Construction Industry
by: Nagarajan, Sarmila
Published: (2022)
by: Nagarajan, Sarmila
Published: (2022)
Critical Success Factors Of The Green Building Implementation In Malaysian Construction Industry
by: Nagarajan, Sarmila
Published: (2022)
by: Nagarajan, Sarmila
Published: (2022)
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014)
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008)
by: Alaghbari, Wa’el, et al.
Published: (2008)
Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
by: Lim, Desmond Eng Hong
Published: (2015)
by: Lim, Desmond Eng Hong
Published: (2015)
A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin
by: Kamaruddin, Siti Syariazulfa
Published: (2018)
by: Kamaruddin, Siti Syariazulfa
Published: (2018)
Factors affecting site supervision in improving IBS productivity
by: Wan Ramizah, Wan Salleh
Published: (2019)
by: Wan Ramizah, Wan Salleh
Published: (2019)
Environmental awareness and benefits of industrialized building systems (IBS)
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012)
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012)
Earthquake analysis of IBS for single storey housing
by: Yunus, Siti Radiah
Published: (2007)
by: Yunus, Siti Radiah
Published: (2007)
Barriers and Challenges of Building Information Modelling Implementation in Jordanian Construction Industry
by: Al-Btoush, Mohammed A. KA., et al.
Published: (2017)
by: Al-Btoush, Mohammed A. KA., et al.
Published: (2017)
Challenges and barriers of building information modelling (BIM) implementation in construction industry
by: Nur Farhana, Hamzah
Published: (2018)
by: Nur Farhana, Hamzah
Published: (2018)
Implementation of Vertical Green Systems in Commercial Buildings in Malaysia
by: Liew, Chiew Yee
Published: (2015)
by: Liew, Chiew Yee
Published: (2015)
Associate problems in implementation of Industrialised Building System (IBS) in construction industry in Selangor / Izmaazura Ismail
by: Ismail, Izmaazura
Published: (2006)
by: Ismail, Izmaazura
Published: (2006)
Perception Analysis of Industrialized Building System (IBS) Implementation for G7 Contractors in Kuching, Sarawak
by: Abdullah, N.M.Q.B., et al.
Published: (2021)
by: Abdullah, N.M.Q.B., et al.
Published: (2021)
A Literature Review Of The Advantages And Barriers To The Implementation Of Industrialised Building System (IBS) In Construction Industry.
by: Abdul Rahman, Hamzah, et al.
Published: (2009)
by: Abdul Rahman, Hamzah, et al.
Published: (2009)
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)
by: Norsyazwani, Masri
Published: (2019)
Implementation strategy for industrialised building system
by: Lim, Pui Chung
Published: (2006)
by: Lim, Pui Chung
Published: (2006)
Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
by: Zahrizan, Zakaria, et al.
Published: (2014)
by: Zahrizan, Zakaria, et al.
Published: (2014)
An investigation on benefits and future expectation of Industrialised Building System (IBS) implementation in construction practices
by: Ismail, Hassan, et al.
Published: (2018)
by: Ismail, Hassan, et al.
Published: (2018)
Cost issue: Key limiting factor that affects IBS application in Malaysian construction industry
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
Successful implementation of erosion and sedimentation control plan for reducing environmental impact in the construction industry
by: Asri Syahmi, Asnor
Published: (2022)
by: Asri Syahmi, Asnor
Published: (2022)
Similar Items
-
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018) -
Implementation of Industrialised Building System (IBS) in Construction Industry Malaysia: A Study in Perlis
by: Wong, Ng Ni
Published: (2021) -
Barriers in the implementation of IBS formwork in Malaysian construction industry
by: Siti Nur Syafiqah, Mohd Sa'don
Published: (2017) -
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018) -
Safety aspect in installation of industrialized building system (IBS) formwork in Malaysian construction industry
by: Nur Izzati, Adnan
Published: (2018)