Investigating the relationship between site supervision and IBS based construction projects
Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting sit...
| Main Authors: | Saad, M. Syamsyul H., W. R., Wan Salleh, R. A., Rahman, S. I., Doh |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/26579/ http://umpir.ump.edu.my/id/eprint/26579/1/Investigating%20the%20relationship%20between%20site%20supervision%20and%20IBS.pdf |
Similar Items
Investigating the relationship between site supervision and IBS based construction projects
by: Syamsyul Hairi, M. S., et al.
Published: (2020)
by: Syamsyul Hairi, M. S., et al.
Published: (2020)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Factors affecting site supervision in improving IBS productivity
by: Wan Ramizah, Wan Salleh
Published: (2019)
by: Wan Ramizah, Wan Salleh
Published: (2019)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
Moderating Role Of Psychological Resilience On Project Manager Abusive Supervision In Construction Projects In Pakistan
by: Rafique, Muhammad
Published: (2023)
by: Rafique, Muhammad
Published: (2023)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Investigate how construction waste generation rate is, different for every types of project in peninsular Malaysia, using site visit method
by: Subramaniam, Shivaraj, et al.
Published: (2018)
by: Subramaniam, Shivaraj, et al.
Published: (2018)
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
An investigation on benefits and future expectation of Industrialised Building System (IBS) implementation in construction practices
by: Ismail, Hassan, et al.
Published: (2018)
by: Ismail, Hassan, et al.
Published: (2018)
Noise assessment at construction site which uses IBS formwork system
by: Abas, Nor Haslinda, et al.
Published: (2018)
by: Abas, Nor Haslinda, et al.
Published: (2018)
Key drivers for adopting design-build: a comparison study among construction project stakeholders
by: Z. P., Lee, et al.
Published: (2020)
by: Z. P., Lee, et al.
Published: (2020)
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008)
by: Alaghbari, Wa’el, et al.
Published: (2008)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Factors affecting the success of highway construction projects : the case of Malaysia
by: R. A., Rahman, et al.
Published: (2019)
by: R. A., Rahman, et al.
Published: (2019)
Factors effecting the cost management in construction projects
by: M. A., Faten Albtoush, et al.
Published: (2019)
by: M. A., Faten Albtoush, et al.
Published: (2019)
Challenges for Developers Implementing IBS in Malaysian Housing Projects
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
How artificial intelligence changed the construction industry in safety issues
by: Razi, P. Z., et al.
Published: (2023)
by: Razi, P. Z., et al.
Published: (2023)
Key constraint in construction industry: A review
by: Nurul Athirah, R., et al.
Published: (2022)
by: Nurul Athirah, R., et al.
Published: (2022)
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)
by: Norsyazwani, Masri
Published: (2019)
Construction waste management practices in the construction site: virtual source analysis
by: Shariffudin, Fatin Nur Syaeera Nabila, et al.
Published: (2021)
by: Shariffudin, Fatin Nur Syaeera Nabila, et al.
Published: (2021)
Analysis of risk on construction site
by: Nurul Jannah , Aziz
Published: (2012)
by: Nurul Jannah , Aziz
Published: (2012)
Causes of accidents at construction sites
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
by: Abdul Hamid, Abdul Rahim, et al.
Published: (2008)
Project communication aspects on construction performance: Investigating contractors’ perspective
by: Yu, Chooi Yi
Published: (2022)
by: Yu, Chooi Yi
Published: (2022)
Improving construction materials management practices in construction sites
by: Ahmed, Fuad Hassan
Published: (2017)
by: Ahmed, Fuad Hassan
Published: (2017)
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)
by: Md. Ali, Massofia, et al.
Published: (2018)
Determining The Effects Of Adopting
Green Construction Site Practices On
Project Performance In Nigeria
by: Hilary, Omatule Onubi
Published: (2020)
by: Hilary, Omatule Onubi
Published: (2020)
An Investigation On The Awareness Of Sustainability Concept In Construction Projects: A Case Of Nigerian Students In The Construction Field.
by: Hadiza, Lawal Mayere
Published: (2016)
by: Hadiza, Lawal Mayere
Published: (2016)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Seismic response of precast and IBS buildings under earthquake attacks
by: Hamid, N. H., et al.
Published: (2019)
by: Hamid, N. H., et al.
Published: (2019)
Cost issue: Key limiting factor that affects IBS application in Malaysian construction industry
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
by: Wong, Amy, Zhi Lin, et al.
Published: (2018)
Financial barriers in achieving CIDB IBS Roadmap in Malaysia private sector construction industry
by: Lim, Desmond Eng Hong, et al.
Published: (2018)
by: Lim, Desmond Eng Hong, et al.
Published: (2018)
Causes of crane accidents at construction sites in Malaysia
by: Abdul Rahim, A. H., et al.
Published: (2019)
by: Abdul Rahim, A. H., et al.
Published: (2019)
Causes of Accidents Involving Scaffolding at Construction Sites
by: Abas, Nor Haslinda, et al.
Published: (2020)
by: Abas, Nor Haslinda, et al.
Published: (2020)
The adoption of internet of things (IOT) on construction site
by: Chong, Wen Xin
Published: (2021)
by: Chong, Wen Xin
Published: (2021)
Earthquake analysis of IBS for single storey housing
by: Yunus, Siti Radiah
Published: (2007)
by: Yunus, Siti Radiah
Published: (2007)
Investigating the interrelationships between advanced technologies and safety performance factors: The case of higher education construction projects
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018)
by: Lim, Chun Fee, et al.
Published: (2018)
Significant usage of slab and wall form technique in industrialised building systems (IBS) for low cost highrise apartments construction
by: Abdul Rahman, Redzuan
Published: (2006)
by: Abdul Rahman, Redzuan
Published: (2006)
Similar Items
-
Investigating the relationship between site supervision and IBS based construction projects
by: Syamsyul Hairi, M. S., et al.
Published: (2020) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Factors affecting site supervision in improving IBS productivity
by: Wan Ramizah, Wan Salleh
Published: (2019) -
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015) -
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)