Selection of method in construction industry by using AHP method
Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. The method that discuss in this research are traditional method, design and build and industrial building system. According to (Sutt. J., 2011),...
| Main Author: | Nur Syafikah, Nasrudin |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2018
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/26255/ http://umpir.ump.edu.my/id/eprint/26255/1/Selection%20of%20method%20in%20construction%20industry%20by%20using%20AHP%20method.pdf |
Similar Items
Selection of Method in Construction Industry by using Analytical Hierarchy Process (AHP)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
by: Putri Zulaiha, Razi, et al.
Published: (2020)
The architecture: methods of constructions
by: Ahmad Latifi, Farah Liyana, et al.
Published: (2011)
by: Ahmad Latifi, Farah Liyana, et al.
Published: (2011)
The selection of construction project manager by using analytical hierarchy process (AHP)
by: Lau, Hui Seng
Published: (2006)
by: Lau, Hui Seng
Published: (2006)
Measurement of quality in building constructed using Industrialised Building System (IBS) and conventional method
by: Ali, Maisarah
Published: (2015)
by: Ali, Maisarah
Published: (2015)
Selection of contractor using analytical hierarchy process (AHP)
by: Nurul Syafiqah, Zaini
Published: (2018)
by: Nurul Syafiqah, Zaini
Published: (2018)
Flood Risk Mapping Using Ahp Method A Case Study For Meru, Klang
by: Isman, Intan Shafinaz
Published: (2022)
by: Isman, Intan Shafinaz
Published: (2022)
Dispute resolution methods in the construction industry
by: Dorothy, Chai Sin Yee
Published: (2005)
by: Dorothy, Chai Sin Yee
Published: (2005)
Late payment issues of subcontractors in Malaysian construction industry
by: Che Haron, Roziha, et al.
Published: (2020)
by: Che Haron, Roziha, et al.
Published: (2020)
Best practice for multi-project management in the construction industry
by: Megat Abdullah, Aminatuzuhariah
Published: (1999)
by: Megat Abdullah, Aminatuzuhariah
Published: (1999)
The challenges and potential of value management in local construction industry
by: Che Mat, Mohd. Mazlan
Published: (1999)
by: Che Mat, Mohd. Mazlan
Published: (1999)
Employment of foreign labours in the Malaysian construction industry: contractor's perspective
by: Hasan, Sharina Farihah, et al.
Published: (2011)
by: Hasan, Sharina Farihah, et al.
Published: (2011)
The extent of multi-project management implementation in the UK construction industry
by: M. Abdullah, Aminatuzuhariah, et al.
Published: (2000)
by: M. Abdullah, Aminatuzuhariah, et al.
Published: (2000)
Risk assessment of public road construction projects using analytical hierarchy process (AHP)
by: Putri Aifa Syuhaida, Shabuddin
Published: (2019)
by: Putri Aifa Syuhaida, Shabuddin
Published: (2019)
The Study on the Benefits and Constraints of Using Design and Build Procurement Method in the Construction Industry
by: Ching, Khai Linn
Published: (2015)
by: Ching, Khai Linn
Published: (2015)
Analytic hierarchy progress (AHP) for construction technologies adoption in the Malaysian Construction Industry
by: Chai, Changsaar, et al.
Published: (2025)
by: Chai, Changsaar, et al.
Published: (2025)
Conflict and dispute reduction mechanism of procurement method for construction industry in Malaysia
by: Nurul Athirah, Mohd Nasir
Published: (2015)
by: Nurul Athirah, Mohd Nasir
Published: (2015)
Conservation of urban environmental corridor in Kuala Lumpur as a method to safeguard the environment
by: Mohd Shukri, Nur Hannan, et al.
Published: (2008)
by: Mohd Shukri, Nur Hannan, et al.
Published: (2008)
The evaluation of implementing industrialized building system for construction industry in Malaysia
by: Ismail, Zulkefle, et al.
Published: (2009)
by: Ismail, Zulkefle, et al.
Published: (2009)
The development of fire risk assessment method for heritage building
by: Ibrahim, Md. Najib, et al.
Published: (2011)
by: Ibrahim, Md. Najib, et al.
Published: (2011)
The recording of historic buildings for conservation: levels and methods of recording.
by: Salleh, Nurul Hamiruddin
Published: (2011)
by: Salleh, Nurul Hamiruddin
Published: (2011)
Enhancement of dispute resolution mechanism in the Iranian construction industry / Abdollah Saeb
by: Abdollah, Saeb
Published: (2019)
by: Abdollah, Saeb
Published: (2019)
Implementing built environment research findings in developing countries - the case of east and Southern Africa the evaluation of implementing industrialized building system for construction industry in Malaysia
by: Ismail, Zulkefle, et al.
Published: (2009)
by: Ismail, Zulkefle, et al.
Published: (2009)
Comparing analytical hierarchy process (AHP) and likert scale
by: Nur Najihah, Bakri
Published: (2019)
by: Nur Najihah, Bakri
Published: (2019)
Critical Success Factors Of Malaysian Contractors In International Construction Projects Using The Analytic Hierarchy Process (Ahp)
by: Derrick, Tan Jian-Ze
Published: (2013)
by: Derrick, Tan Jian-Ze
Published: (2013)
Technique and method in documentation of heritage building: the use of 3D Laser scanning on Kampung Laut Mosque Kelantan
by: Md. Sharif, Harlina, et al.
Published: (2011)
by: Md. Sharif, Harlina, et al.
Published: (2011)
Research design for explanatory case study adopted mixed method approach
by: Mahamod, Lukman Hakim
Published: (2011)
by: Mahamod, Lukman Hakim
Published: (2011)
Car parking in city centre: case study of Georgetown CBD / Ahmad Suhaimi Ismail
by: Ismail, Ahmad Suhaimi
Published: (1980)
by: Ismail, Ahmad Suhaimi
Published: (1980)
Mixed methods approach for the study of fire safety management in Malaysian heritage building
by: Salleh, Nurul Hamiruddin
Published: (2015)
by: Salleh, Nurul Hamiruddin
Published: (2015)
Traditional furniture. The effects from the introduction of new methods and materials / Alfian Gunawi
by: Gunawi, Alfian
Published: (1992)
by: Gunawi, Alfian
Published: (1992)
Evaluating Safety Impact Factors in Construction Projects through Multi-Entity Collaboration Using AHP
by: Yue, Lan, et al.
Published: (2025)
by: Yue, Lan, et al.
Published: (2025)
The effects of construction on environmental resources in peninsular Malaysia: the perspective of land use planning
by: Asmawi, M. Zainora, et al.
Published: (2010)
by: Asmawi, M. Zainora, et al.
Published: (2010)
Construction and construction education and training in the muslim world - a preliminary assessment and policy implication
by: Abdul Rashid, Khairuddin, et al.
Published: (2009)
by: Abdul Rashid, Khairuddin, et al.
Published: (2009)
Construction and construction education and training in the Muslim world - a preliminary assessment and policy implications
by: Abdul Rashid, Khairuddin, et al.
Published: (2011)
by: Abdul Rashid, Khairuddin, et al.
Published: (2011)
Costing for the preliminaries section of the construction
by: Tan, Chin Keng
Published: (2016)
by: Tan, Chin Keng
Published: (2016)
Issues in construction and quantity surveying
by: Khalil, Khalili
Published: (2011)
by: Khalil, Khalili
Published: (2011)
Variation orders in construction contract
by: Sikan, Hashim
Published: (1999)
by: Sikan, Hashim
Published: (1999)
Selection of RGP Optimization Variables using Taguchi Method
by: Yusoff, Nooryusmiza, et al.
Published: (2010)
by: Yusoff, Nooryusmiza, et al.
Published: (2010)
Subcontractor selection method using analytic hierarchy process
by: Manoharan, Ravichandran
Published: (2005)
by: Manoharan, Ravichandran
Published: (2005)
Bridging the Gap: Architecture and Structural Engineering
by: A., Faridah, et al.
Published: (2004)
by: A., Faridah, et al.
Published: (2004)
The effectiveness of natural ventilation design in low cost housing
by: Amin Abdullah @ Abu Bakar, Md. Hanafiah
Published: (2005)
by: Amin Abdullah @ Abu Bakar, Md. Hanafiah
Published: (2005)
Similar Items
-
Selection of Method in Construction Industry by using Analytical Hierarchy Process (AHP)
by: Putri Zulaiha, Razi, et al.
Published: (2020) -
The architecture: methods of constructions
by: Ahmad Latifi, Farah Liyana, et al.
Published: (2011) -
The selection of construction project manager by using analytical hierarchy process (AHP)
by: Lau, Hui Seng
Published: (2006) -
Measurement of quality in building constructed using Industrialised Building System (IBS) and conventional method
by: Ali, Maisarah
Published: (2015) -
Selection of contractor using analytical hierarchy process (AHP)
by: Nurul Syafiqah, Zaini
Published: (2018)