Development of hydropower sustainability assessment method in Malaysia context

Nowadays, Malaysian energy companies started to pay attention to hydropower projects as this hydropower is one of the electricity source in Malaysia. However, emergence of the hydropower will lead to environmental, society and economic issues. All of these issues if not handled comprehensively will...

Full description

Bibliographic Details
Main Author: Nur Atiqah, Omar
Format: Undergraduates Project Papers
Language:English
Published: 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/25707/
http://umpir.ump.edu.my/id/eprint/25707/1/Development%20of%20hydropower%20sustainability%20assessment%20method%20in%20Malaysia%20context.pdf
_version_ 1848822348422053888
author Nur Atiqah, Omar
author_facet Nur Atiqah, Omar
author_sort Nur Atiqah, Omar
building UMP Institutional Repository
collection Online Access
description Nowadays, Malaysian energy companies started to pay attention to hydropower projects as this hydropower is one of the electricity source in Malaysia. However, emergence of the hydropower will lead to environmental, society and economic issues. All of these issues if not handled comprehensively will become more serious and endanger our planet also society. To remain competitive to other industries in Malaysia such in manufacturing, automotive and other else, an implementation of sustainability is very important to growth their business performance. In addition, sustainability is vital to Bursa Malaysia Securities Berhad under their listing requirements. Therefore, this study aims to develop a sustainability assessment practice for hydropower sector in Malaysia context by referring to Hydropower Sustainability Assessment Protocol (HSAP) and Green Project Management (GPM) P5 concept. The sustainability practice adopted in hydropower project generally follow Environmental Impact Assessments (EIAs) concept which focused only on environmentally issues. Thus, this study is to improve Systematic Sustainability Assessment (SSA) by integrating original SSA with HSAP that related to the hydropower industry. As a result, a satisfactory from the state council or auditor to the project standard will be achieved. In addition, this study, will contribute a number of factors towards sustainability performance of hydropower sector in Malaysia including provide a sustainable integrated reporting toward the project and provide a new sustainability approach to project manager.
first_indexed 2025-11-15T02:39:49Z
format Undergraduates Project Papers
id ump-25707
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:39:49Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling ump-257072023-08-07T00:26:59Z http://umpir.ump.edu.my/id/eprint/25707/ Development of hydropower sustainability assessment method in Malaysia context Nur Atiqah, Omar TS Manufactures Nowadays, Malaysian energy companies started to pay attention to hydropower projects as this hydropower is one of the electricity source in Malaysia. However, emergence of the hydropower will lead to environmental, society and economic issues. All of these issues if not handled comprehensively will become more serious and endanger our planet also society. To remain competitive to other industries in Malaysia such in manufacturing, automotive and other else, an implementation of sustainability is very important to growth their business performance. In addition, sustainability is vital to Bursa Malaysia Securities Berhad under their listing requirements. Therefore, this study aims to develop a sustainability assessment practice for hydropower sector in Malaysia context by referring to Hydropower Sustainability Assessment Protocol (HSAP) and Green Project Management (GPM) P5 concept. The sustainability practice adopted in hydropower project generally follow Environmental Impact Assessments (EIAs) concept which focused only on environmentally issues. Thus, this study is to improve Systematic Sustainability Assessment (SSA) by integrating original SSA with HSAP that related to the hydropower industry. As a result, a satisfactory from the state council or auditor to the project standard will be achieved. In addition, this study, will contribute a number of factors towards sustainability performance of hydropower sector in Malaysia including provide a sustainable integrated reporting toward the project and provide a new sustainability approach to project manager. 2017-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/25707/1/Development%20of%20hydropower%20sustainability%20assessment%20method%20in%20Malaysia%20context.pdf Nur Atiqah, Omar (2017) Development of hydropower sustainability assessment method in Malaysia context. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
spellingShingle TS Manufactures
Nur Atiqah, Omar
Development of hydropower sustainability assessment method in Malaysia context
title Development of hydropower sustainability assessment method in Malaysia context
title_full Development of hydropower sustainability assessment method in Malaysia context
title_fullStr Development of hydropower sustainability assessment method in Malaysia context
title_full_unstemmed Development of hydropower sustainability assessment method in Malaysia context
title_short Development of hydropower sustainability assessment method in Malaysia context
title_sort development of hydropower sustainability assessment method in malaysia context
topic TS Manufactures
url http://umpir.ump.edu.my/id/eprint/25707/
http://umpir.ump.edu.my/id/eprint/25707/1/Development%20of%20hydropower%20sustainability%20assessment%20method%20in%20Malaysia%20context.pdf