Overall equipment effectiveness analysis of power magnetic inductor production line at BI technologies sdn. bhd.
Overall Equipment Effectiveness (OEE) is a powerful metric technique of manufacturing performance incorporating measures of the utilization, yield and efficiency of a process, machine or manufacturing line. It considers all important measures of productivity. A study was carried out to improve the e...
| Main Author: | Nur Syuhadah, Abdul Wahab |
|---|---|
| Format: | Undergraduates Project Papers |
| Language: | English |
| Published: |
2017
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/25647/ http://umpir.ump.edu.my/id/eprint/25647/1/Overall%20equipment%20effectiveness%20analysis%20of%20power%20magnetic%20inductor%20production%20line%20at%20BI%20technologies%20sdn.%20bhd..pdf |
Similar Items
Total Productive Maintenance (TPM) approach to improve Overall Equipment Efficiency (OEE) in Robert Bosch Automotive Steering Sdn. Bhd
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
Analysis and countermeasure to improve overall equipment effectiveness (OEE) on chassis line at Tan Chong Industry
by: Nur Syahirah, Ismail
Published: (2016)
by: Nur Syahirah, Ismail
Published: (2016)
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
by: Nur Afiqah, Noor Azman
Published: (2013)
by: Nur Afiqah, Noor Azman
Published: (2013)
Analysis and countermeasure to improve production system performance by using overall equipment effectiveness at bi technologies sdn. Bhd.
by: Beh, Alicia
Published: (2013)
by: Beh, Alicia
Published: (2013)
A case study on the application of activity based costing on the magnetic inductor
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Analysis and countermeasure to improve machine efficiency by using overall equipment effectiveness (OEE) method
by: Law, Jessica Ka Ing
Published: (2015)
by: Law, Jessica Ka Ing
Published: (2015)
Evaluation Improvement of Production Productivity Performance using Statistical Process Control, Overall Equipment Efficiency, and Autonomous Maintenance
by: Amir, Azizi
Published: (2015)
by: Amir, Azizi
Published: (2015)
Overall Equipment Effectiveness (OEE) Through Total Productive Maintenance (TPM) Practices - A Study Across The Malaysia Industries
by: Kaliannan, Batumalay
Published: (2010)
by: Kaliannan, Batumalay
Published: (2010)
A study of inventory optimization model for Eightdesign Sdn Bhd
by: Siti Aisyah, Abd Wahab
Published: (2014)
by: Siti Aisyah, Abd Wahab
Published: (2014)
UMP, TT Vision Technology Sdn. Bhd. Collaborate in Engineering and Technology
by: Radhiyah, Abd Aziz, et al.
Published: (2022)
by: Radhiyah, Abd Aziz, et al.
Published: (2022)
Optimization using Mahalanobis-Taguchi System for inductor component
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
Diagnosis and Costing Optimization on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
by: Aina Nadia Aida, Mohd Latif
Published: (2015)
by: Aina Nadia Aida, Mohd Latif
Published: (2015)
A case study on the application of activity-based costing on the inductor component
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Lean manufacturing techniques implementation at Zest Venture Sdn Bhd
by: Nur Fakhriah, Mohd Noordin
Published: (2013)
by: Nur Fakhriah, Mohd Noordin
Published: (2013)
Process capability analysis at Chaudry textiles (Malaysia) Sdn Bhd
by: Mohamed Sallehsu, Kamaruzaman
Published: (2008)
by: Mohamed Sallehsu, Kamaruzaman
Published: (2008)
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
by: Lim, Qian Bing
Published: (2012)
by: Lim, Qian Bing
Published: (2012)
Productivity improvement using VSM at TT Electronis Sdn Bhd
by: Muhammad Najmi, Ahmat
Published: (2016)
by: Muhammad Najmi, Ahmat
Published: (2016)
A Study Of Total Preventive Maintenance (TPM) At Zircom Diecast (M) Sdn. Bhd.
by: Seerangan, Gunasegeran
Published: (2004)
by: Seerangan, Gunasegeran
Published: (2004)
Improve material handling system in Hirotako Acoustic Sdn.Bhd'��s : logistic department area
by: Samylingam, Lingenthiran
Published: (2012)
by: Samylingam, Lingenthiran
Published: (2012)
Development of portable desk for biomechanics equipment
by: Shahren, Abd Manap
Published: (2013)
by: Shahren, Abd Manap
Published: (2013)
Lean production system knowledge improvement by implementing lean production system simulation game at WSA Engineering Sdn Bhd
by: Hajar, Abdullah
Published: (2012)
by: Hajar, Abdullah
Published: (2012)
DC motors in automotive equipment: applications and challenges
by: Muhammad Nor Azril, Zulkafli, et al.
Published: (2022)
by: Muhammad Nor Azril, Zulkafli, et al.
Published: (2022)
The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
by: Najibah, Anuar
Published: (2012)
by: Najibah, Anuar
Published: (2012)
Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
by: Muhammad Quyyum, Sohaimi
Published: (2012)
by: Muhammad Quyyum, Sohaimi
Published: (2012)
Temperature Assessment of Heating Stage for a Thermoforming Equipment
by: Farah Amira, Mohd Ghazali, et al.
Published: (2016)
by: Farah Amira, Mohd Ghazali, et al.
Published: (2016)
Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
by: Abd Rahman Fahmi, Mat Hasan
Published: (2012)
by: Abd Rahman Fahmi, Mat Hasan
Published: (2012)
Productivity study and line balancing of GGMG & CALICO production line
by: Hartini, Mustafa, et al.
Published: (2012)
by: Hartini, Mustafa, et al.
Published: (2012)
Inventory planning and control in Dataran Setar Sdn. Bhd.
by: Nor Nadhira, Ahmat Azemi
Published: (2016)
by: Nor Nadhira, Ahmat Azemi
Published: (2016)
Persijilan MS ISO 9002 dan persepsi kakitangan terhadap amalan pengurusan kualiti : satu kajian kes di Bintulu Port Sdn. Bhd.
by: Adibah, Binti Ismail.
Published: (1999)
by: Adibah, Binti Ismail.
Published: (1999)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
Standardized work approach toward kaizen event of the Front Hub MyVi D54T line at Sapura Machining Corporation Sdn Bhd
by: Masturah, Suliman Atoriy
Published: (2016)
by: Masturah, Suliman Atoriy
Published: (2016)
A survey and improvement of quality at Dataran Setar Sdn Bhd
by: Seow, Wenjia
Published: (2016)
by: Seow, Wenjia
Published: (2016)
A novel winding structure in planar inductors to decrease overall capacitive couplings
by: Shahabi, N., et al.
Published: (2012)
by: Shahabi, N., et al.
Published: (2012)
A novel winding structure in planar inductors to decrease the overall capacitive couplings
by: Shahabi, N., et al.
Published: (2010)
by: Shahabi, N., et al.
Published: (2010)
Productivity improvement through line balancing
by: Hazmil, Hapaz
Published: (2008)
by: Hazmil, Hapaz
Published: (2008)
Magnetic polarity influence on machining performance of magnetic field-assisted edm
by: Mohd Efendee, Awang
Published: (2020)
by: Mohd Efendee, Awang
Published: (2020)
Simulation of assembly line for production performance improvement
by: Mohd Saiful Akmal, Razali
Published: (2016)
by: Mohd Saiful Akmal, Razali
Published: (2016)
An integrated model for production line balancing planning
by: Ali, A. J. Adham
Published: (2012)
by: Ali, A. J. Adham
Published: (2012)
Similar Items
-
Total Productive Maintenance (TPM) approach to improve Overall Equipment Efficiency (OEE) in Robert Bosch Automotive Steering Sdn. Bhd
by: Mohamad Hafiz Mohd Rosli,
Published: (2020) -
Analysis and countermeasure to improve overall equipment effectiveness (OEE) on chassis line at Tan Chong Industry
by: Nur Syahirah, Ismail
Published: (2016) -
Optimize flow layout and analysis of effectiveness at bi technologies Corporation Sdn. Bhd
by: Nur Afiqah, Noor Azman
Published: (2013) -
Analysis and countermeasure to improve production system performance by using overall equipment effectiveness at bi technologies sdn. Bhd.
by: Beh, Alicia
Published: (2013) -
A case study on the application of activity based costing on the magnetic inductor
by: Mohd Yazid, Abu, et al.
Published: (2021)