Application of Activity Based Costing for Palm Oil Plantation
Malaysia is one of the largest producers and exporters of palm oil in the world, accounting for 11% of the world's oils & fats production and 27% of the export trade of oils & fats. Oil palm tree will start bearing fruits after 30 months of field planting and will continue to be product...
| Main Authors: | Chak, Wen Zheng, Abu, Mohd Yazid |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit UMP
2019
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/24637/ http://umpir.ump.edu.my/id/eprint/24637/1/Application%20of%20ABC%20for%20Palm%20Oil%20Plantation-RDU170387.pdf |
Similar Items
Costing structure improvement using activity based costing in palm oil plantation of Malaysia
by: S. N. A. M., Zaini, et al.
Published: (2020)
by: S. N. A. M., Zaini, et al.
Published: (2020)
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Application of Mahalanobis-Taguchi system in palm oil plantation
by: I. I., Azmi, et al.
Published: (2019)
by: I. I., Azmi, et al.
Published: (2019)
Development a new costing structure for palm oil industry using time driven activity based costing
by: Mohd Yazid, Abu, et al.
Published: (2020)
by: Mohd Yazid, Abu, et al.
Published: (2020)
Application of Activity-Based Costing In Electronic Manufacturing
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
A review on the application of activity-based costing and time driven activity-based costing in manufacturing industry
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021)
by: S. N. A. M., Zaini, et al.
Published: (2021)
Comparative study: Activity based costing and time driven activity based costing in electronic industry
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
Application of activity-based costing and time-driven activity-based costing for kitchen cabinet
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
by: Intan Noralisya, Mohd Yusoff, et al.
Published: (2024)
A case study on the application of activity based costing on the magnetic inductor
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
A case study on the application of activity-based costing on the inductor component
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
Costing improvement of remanufacturing crankshaft by integrating Mahalanobis-Taguchi System and Activity based Costing
by: Mohd Yazid, Abu, et al.
Published: (2018)
by: Mohd Yazid, Abu, et al.
Published: (2018)
Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
Integration of Mahalanobis-Taguchi System and activity based costing for remanufacturing decision
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2018)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2018)
Development of a new costing structure in production environment using activity based costing
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2019)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2019)
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)
Comparative study between product- and service-based operations using time-driven activity-based costing
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023)
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
by: Nurul Farahin, Zamrud, et al.
Published: (2020)
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020)
by: N. F. A., Ghani, et al.
Published: (2020)
A case study on the un-used capacity assessment using time driven activity based costing for magnetic components
by: Areena, Zaini, et al.
Published: (2020)
by: Areena, Zaini, et al.
Published: (2020)
Feasibility study on the implementation of mahalanobis taguchi system and time driven activity based costing in electronic industry
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)
by: Mohd Yazid, Abu, et al.
Published: (2019)
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020)
Integration of mahalanobis-taguchi system and activity based costing in decision making for remanufacturing
by: Mohd Yazid, Abu
Published: (2016)
by: Mohd Yazid, Abu
Published: (2016)
A comparative study of activitybased costing (abc) and time-driven activity-based costing (tdabc) on cost accounting
by: Nurul Farahin, Zamrud
Published: (2021)
by: Nurul Farahin, Zamrud
Published: (2021)
Comparison of activity-based costing and time-driven activity-based costing for printed circuit board assembly production
by: Nur Syafikah, Pinueh, et al.
Published: (2024)
by: Nur Syafikah, Pinueh, et al.
Published: (2024)
Integration of Mahalanobis-Taguchi system and traditional cost accounting for remanufacturing crankshaft
by: Mohd Yazid, Abu, et al.
Published: (2018)
by: Mohd Yazid, Abu, et al.
Published: (2018)
A case study on the determination of unused capacity using time driven activity-based costing for electronic component
by: N. F., Zamrud, et al.
Published: (2020)
by: N. F., Zamrud, et al.
Published: (2020)
Diagnosis and Costing Optimization on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)
A case study in electrical & electronic industry using mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
Mahalanobis-taguchi system and time-driven activity-based costing integration of printed circuit board
by: Nurul Haziyani, Aris, et al.
Published: (2023)
by: Nurul Haziyani, Aris, et al.
Published: (2023)
Optimization of cost-based hybrid flowshop scheduling using teaching-learning-based optimization algorithm
by: Ullah, Wasif, et al.
Published: (2024)
by: Ullah, Wasif, et al.
Published: (2024)
Lignin Production from Oil Palm Biomass
by: Zamardina, Zainal
Published: (2013)
by: Zamardina, Zainal
Published: (2013)
The effect of oil palm trunk filler in expoxied natural rubber
by: Mohd Saiful Affendi, Zabidi
Published: (2010)
by: Mohd Saiful Affendi, Zabidi
Published: (2010)
Similar Items
-
Costing structure improvement using activity based costing in palm oil plantation of Malaysia
by: S. N. A. M., Zaini, et al.
Published: (2020) -
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021) -
Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021) -
Application of Mahalanobis-Taguchi system in palm oil plantation
by: I. I., Azmi, et al.
Published: (2019) -
Development a new costing structure for palm oil industry using time driven activity based costing
by: Mohd Yazid, Abu, et al.
Published: (2020)