Study on causes of delay for government construction project in Kuching, Sarawak
Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit fr...
Similar Items
Factors in ensuring construction readiness in sarawak’s building construction
by: Nurul Asyilah, Romzi
Published: (2024)
by: Nurul Asyilah, Romzi
Published: (2024)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019)
by: Siti Nurfarahin, Samsudin
Published: (2019)
A study to identify the factor that causes project delay in construction at Terengganu
by: Nurul Syakirah, Mohd Ali
Published: (2016)
by: Nurul Syakirah, Mohd Ali
Published: (2016)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Factor causing time delay in construction Malaysia
by: Nasser Rostam, Afshar, et al.
Published: (2016)
by: Nasser Rostam, Afshar, et al.
Published: (2016)
Construction project failure: Investigating causes of ineffective building information modelling execution plans
by: Mashanim, Mahazir, et al.
Published: (2024)
by: Mashanim, Mahazir, et al.
Published: (2024)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)
by: Tan, Chin Keng, et al.
Published: (2020)
Causes of abandoned construction projects in Malaysia
by: Yap, Eng Hoe
Published: (2013)
by: Yap, Eng Hoe
Published: (2013)
Causes and effect of delays in Aceh construction industry
by: Majid, Ibnu Abbas
Published: (2006)
by: Majid, Ibnu Abbas
Published: (2006)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
Asessment of risk management in government construction project
by: Athirah Izzati, Zakaria
Published: (2018)
by: Athirah Izzati, Zakaria
Published: (2018)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
The relationship of project management innovation and project performance in Kedah construction industry
by: Nawawi, Osman
Published: (2015)
by: Nawawi, Osman
Published: (2015)
A study of roles and impact of project management consultancy in construction project
by: Nur Syahidah, Abu Bakar
Published: (2017)
by: Nur Syahidah, Abu Bakar
Published: (2017)
Dispute resolution in relation to delay of construction project
by: Soon, Tan Kian
Published: (2010)
by: Soon, Tan Kian
Published: (2010)
Awareness of risk management among contractors in the government construction project
by: Wan Azwanfakhrul, Wan Ibrahim
Published: (2018)
by: Wan Azwanfakhrul, Wan Ibrahim
Published: (2018)
Delay in design phase in Malaysia construction : the cause and the factor to reduce the delay
by: Noor Syazwani, Mohd Rizhuan
Published: (2019)
by: Noor Syazwani, Mohd Rizhuan
Published: (2019)
Delay-based Reliability Analysis on Construction Projects
by: Sorooshian, Shahryar
Published: (2014)
by: Sorooshian, Shahryar
Published: (2014)
Factors that contribute to delay in construction project in Johor
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
by: Mimi Ereena, Solahudin Alayubi
Published: (2019)
Overcoming causes of claim disputes in construction projects: a dematel based model
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
by: Siti Nur Farhain, Mohd Yusri
Published: (2023)
Investigating factors affecting project performance moderated by project governance
by: Al Alyani, Wafa Rashid, et al.
Published: (2024)
by: Al Alyani, Wafa Rashid, et al.
Published: (2024)
A theoretical framework on factors causing delay of construction industries projects
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
by: Ahmed Al-Fadhali, Najib Mohammed, et al.
Published: (2017)
A study on the factor effecting project delay in the housing construction
by: Fatin Fazlinda, Hamzah
Published: (2016)
by: Fatin Fazlinda, Hamzah
Published: (2016)
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015)
by: Tan, Kean Wei
Published: (2015)
Factors causing the poor performance of construction project
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)
Benefits from Adoption of Building Information Modelling (BIM) in Building Construction Projects in Sarawak
by: Albert Nelson Robert,
Published: (2021)
by: Albert Nelson Robert,
Published: (2021)
The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
by: Ghazali, Wardah Musfirah
Published: (2014)
by: Ghazali, Wardah Musfirah
Published: (2014)
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
by: Albtoush, Faten Ahmad, et al.
Published: (2019)
Variation Orders Causes in Construction Buildings Projects in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017)
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019)
by: A. M., Faten Albtoush, et al.
Published: (2019)
The Key Critical Factors Towards Time Delay During The Construction Of Building And Infrastructure Projects In Sarawak
by: Johnny, Wong Hing Kiong
Published: (2021)
by: Johnny, Wong Hing Kiong
Published: (2021)
Intellectual capital management paradigm for Malaysian SMEs in Kuching, Sarawak
by: Muhammad Khalique, Muhd Sadique, et al.
Published: (2013)
by: Muhammad Khalique, Muhd Sadique, et al.
Published: (2013)
Understanding the Causes of Design Errors in Construction Projects: A DEMATEL-Based Framework
by: Lee, Chia Kuang, et al.
Published: (2024)
by: Lee, Chia Kuang, et al.
Published: (2024)
Architect’s perception of factors contributing to construction project delay In planning & design phase:
Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
by: Wee Yeak, Ong
Published: (2022)
by: Wee Yeak, Ong
Published: (2022)
Conflicts and delays in mega construction projects – Kuwait International Airport Cargo City
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
Decision support system framework for feasibility study in construction project
by: Mohd. Nazari, Nurjuliana
Published: (2007)
by: Mohd. Nazari, Nurjuliana
Published: (2007)
Similar Items
-
Factors in ensuring construction readiness in sarawak’s building construction
by: Nurul Asyilah, Romzi
Published: (2024) -
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022) -
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015) -
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018) -
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019)