Modelling of Assembly Sequence Planning Problem using Base Part Concept
Assembly sequence planning (ASP) plays an important role in manufacturing because it determines the investment on the assembly facilities. Recently, various research works have been done to optimize the ASP problem using different optimization algorithms. Besides the algorithm efficiency, another fa...
| Main Authors: | Muhamad Arif, Abdullah, M. F. F., Ab. Rashid, Z., Ghazalli, N. M. Z., Nik Mohamed, A. N., Mohd Rose |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
AIP Publishing LLC.
2018
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/22902/ http://umpir.ump.edu.my/id/eprint/22902/1/Modelling%20of%20Assembly%20Sequence%20Planning1.pdf |
Similar Items
Optimization of Assembly Sequence Planning Using Soft Computing Approaches: A Review
by: Muhammad Arif, Abdullah, et al.
Published: (2019)
by: Muhammad Arif, Abdullah, et al.
Published: (2019)
A Hybrid Ant-Wolf Algorithm to Optimize Assembly Sequence Planning Problem
by: M. F. F., Ab Rashid
Published: (2017)
by: M. F. F., Ab Rashid
Published: (2017)
Modelling of assembly sequence planning problem using base part concept
by: M Arif, Abdullah, et al.
Published: (2018)
by: M Arif, Abdullah, et al.
Published: (2018)
Development of a Tuneable Test Problem Generator for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2012)
by: M. F. F., Ab Rashid, et al.
Published: (2012)
Energy efficient modeling and optimization for assembly sequence planning using moth flame optimization
by: Abdullah, Arif, et al.
Published: (2019)
by: Abdullah, Arif, et al.
Published: (2019)
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2011)
by: M. F. F., Ab Rashid, et al.
Published: (2011)
Multi-Objective Discrete Particle Swarm Optimisation Algorithm for Integrated Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
Multi-objective multi-verse optimiser for integrated two-sided assembly sequence planning and line balancing
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2022)
Integrated optimization of mixed-model assembly sequence planning and line balancing using multi-objective discrete particle swarm optimization
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
A Review of Two-sided Assembly Line Balancing Problem
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2016)
Mathematical Modelling of Mixed-Model Assembly Line Balancing Problem with Resources Constraints
by: Muhamad Magffierah, Razali, et al.
Published: (2016)
by: Muhamad Magffierah, Razali, et al.
Published: (2016)
Assessing exposure to physical risk factors for work-related musculoskeletal disorders and relevant psychosocial factors among assembly workers in an automotive component assembly plant
by: Fazilah, Abdul Aziz, et al.
Published: (2017)
by: Fazilah, Abdul Aziz, et al.
Published: (2017)
Assessment of metaheuristic algorithms to optimize of mixed-model assembly line balancing problem with resource constraints
by: M.M., Razali, et al.
Published: (2020)
by: M.M., Razali, et al.
Published: (2020)
Improved moth flame optimization algorithm to optimize cost-oriented two-sided assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
A modified artificial bee colony algorithm to optimise integrated assembly sequence planning and assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2019)
by: M. F. F., Ab Rashid, et al.
Published: (2019)
Assessment of integrated assembly sequence planning and line balancing optimization using metaheuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2024)
A case study of energy efficient assembly sequence planning problem
by: Muhammad Arif, Abdullah, et al.
Published: (2019)
by: Muhammad Arif, Abdullah, et al.
Published: (2019)
Optimization of Traveling Salesman Problem with Precedence Constraint using Particle Swarm Optimization
by: M. F. F., Ab Rashid, et al.
Published: (2015)
by: M. F. F., Ab Rashid, et al.
Published: (2015)
Gravitational Search Algorithm for Assembly Sequence Planning
by: Ismail, Ibrahim, et al.
Published: (2014)
by: Ismail, Ibrahim, et al.
Published: (2014)
Modelling of Simple Assembly Line Balancing Problem Type 1 (SALBP-1) with Machine and Worker Constraints
by: N. H., Kamarudin, et al.
Published: (2017)
by: N. H., Kamarudin, et al.
Published: (2017)
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
Optimisation of Assembly Line Balancing Type-E with Resource Constraints using NSGA-II
by: Masitah, Jusop, et al.
Published: (2016)
by: Masitah, Jusop, et al.
Published: (2016)
Assembly Line Balancing with Resource Constraints using New
Rank-Based Crossovers
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
Development of six sigma methodology for CNC milling process improvements
by: M.N., Ismail, et al.
Published: (2017)
by: M.N., Ismail, et al.
Published: (2017)
Optimisation of two-sided assembly line balancing with resource constraints using modified particle swarm optimisation
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2020)
Optimization of travelling salesman problem with precedence constraint using modified GA encoding
by: M. F. F., Ab Rashid, et al.
Published: (2018)
by: M. F. F., Ab Rashid, et al.
Published: (2018)
Recent trend in mixed-model assembly line balancing optimization using soft computing approaches
by: Razali, Muhamad Magffierah, et al.
Published: (2019)
by: Razali, Muhamad Magffierah, et al.
Published: (2019)
An Assembly Sequence Planning Approach with a Multi-State Particle Swarm Optimization
by: Ismail, Ibrahim, et al.
Published: (2016)
by: Ismail, Ibrahim, et al.
Published: (2016)
Solving assembly sequence planning using angle modulated simulated kalman filter
by: Ainizar, Mustapa, et al.
Published: (2018)
by: Ainizar, Mustapa, et al.
Published: (2018)
Modelling and optimization of energy efficient assembly line balancing using modified moth flame optimizer
by: M. F. F., Ab Rashid, et al.
Published: (2022)
by: M. F. F., Ab Rashid, et al.
Published: (2022)
A Study of Postural Loading in Malaysian Mining Industry using Rapid Entire Body Assessment
by: M. F. F., Ab Rashid, et al.
Published: (2016)
by: M. F. F., Ab Rashid, et al.
Published: (2016)
Occupational ergonomics risk factors prioritization using integrated analytical hierarchy process (AHP) approach: a study of a local automotive component manufacturer
by: Fazilah, Abdul Aziz, et al.
Published: (2019)
by: Fazilah, Abdul Aziz, et al.
Published: (2019)
Development of a Web-Based System for Assessing and Prioritizing the Critical Ergonomics Risk Factors: A Case Study in a Local Automotive Vehicle Manufacturer
by: Fazilah, Abdul Aziz, et al.
Published: (2021)
by: Fazilah, Abdul Aziz, et al.
Published: (2021)
Optimisation of energy efficient hybrid flowshop scheduling problem using firefly algorithm
by: M. F. F., Ab Rashid, et al.
Published: (2020)
by: M. F. F., Ab Rashid, et al.
Published: (2020)
Intergrated multi-objective optimisation of assembly sequence planning and assembly line balancing using particle swarm optimisation
by: M. F. F., Ab Rashid
Published: (2013)
by: M. F. F., Ab Rashid
Published: (2013)
A new multiobjective tiki-taka algorithm for optimization of assembly line balancing
by: M. F. F., Ab Rashid, et al.
Published: (2023)
by: M. F. F., Ab Rashid, et al.
Published: (2023)
Cutting Orientations for Non-Complex Parts in 4th Axis Machining
by: M. Nafis, O. Z., et al.
Published: (2015)
by: M. Nafis, O. Z., et al.
Published: (2015)
Integrated Approach For Production Planning And Sequencing Decisions In A Single Machine Batch Process
by: Suppiah, Yasothei
Published: (2005)
by: Suppiah, Yasothei
Published: (2005)
Design for assembly and application using Hitachi assemblability evaluation method
by: Mohd Naim, Zakaria
Published: (2009)
by: Mohd Naim, Zakaria
Published: (2009)
Similar Items
-
Optimization of Assembly Sequence Planning Using Soft Computing Approaches: A Review
by: Muhammad Arif, Abdullah, et al.
Published: (2019) -
A Hybrid Ant-Wolf Algorithm to Optimize Assembly Sequence Planning Problem
by: M. F. F., Ab Rashid
Published: (2017) -
Modelling of assembly sequence planning problem using base part concept
by: M Arif, Abdullah, et al.
Published: (2018) -
Development of a Tuneable Test Problem Generator for Assembly Sequence Planning and Assembly Line Balancing
by: M. F. F., Ab Rashid, et al.
Published: (2012) -
Energy efficient modeling and optimization for assembly sequence planning using moth flame optimization
by: Abdullah, Arif, et al.
Published: (2019)