Project management
Outcome based Education: 1. Students are able to select a product with maximum components are 15. 2. Students are able to distinguish between project and project management based on their product. 3. Students are able to describe the potential of their project failure based on time, cost, scope a...
| Main Author: | |
|---|---|
| Format: | Book |
| Language: | English English |
| Published: |
Penerbit Universiti Malaysia Pahang
2018
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/22077/ http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf |
| _version_ | 1848821503060082688 |
|---|---|
| author | Mohd Yazid, Abu |
| author_facet | Mohd Yazid, Abu |
| author_sort | Mohd Yazid, Abu |
| building | UMP Institutional Repository |
| collection | Online Access |
| description | Outcome based Education:
1. Students are able to select a product with maximum components are 15.
2. Students are able to distinguish between project and project management based on their product.
3. Students are able to describe the potential of their project failure based on time, cost, scope and quality management.
4. Students are able to choose their product classification with justification.
5. Students are able to explain the impact of 6 factors towards their
product. |
| first_indexed | 2025-11-15T02:26:23Z |
| format | Book |
| id | ump-22077 |
| institution | Universiti Malaysia Pahang |
| institution_category | Local University |
| language | English English |
| last_indexed | 2025-11-15T02:26:23Z |
| publishDate | 2018 |
| publisher | Penerbit Universiti Malaysia Pahang |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | ump-220772018-12-04T02:23:30Z http://umpir.ump.edu.my/id/eprint/22077/ Project management Mohd Yazid, Abu HD28 Management. Industrial Management Outcome based Education: 1. Students are able to select a product with maximum components are 15. 2. Students are able to distinguish between project and project management based on their product. 3. Students are able to describe the potential of their project failure based on time, cost, scope and quality management. 4. Students are able to choose their product classification with justification. 5. Students are able to explain the impact of 6 factors towards their product. Penerbit Universiti Malaysia Pahang 2018 Book PeerReviewed image en http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg pdf en http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf Mohd Yazid, Abu (2018) Project management. Penerbit Universiti Malaysia Pahang, Kuantan, Pahang. ISBN 978-967-2054-89-4 |
| spellingShingle | HD28 Management. Industrial Management Mohd Yazid, Abu Project management |
| title | Project management |
| title_full | Project management |
| title_fullStr | Project management |
| title_full_unstemmed | Project management |
| title_short | Project management |
| title_sort | project management |
| topic | HD28 Management. Industrial Management |
| url | http://umpir.ump.edu.my/id/eprint/22077/ http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf |