Sediment load analysis in Lake Chini

This study is significant to be conducted to reduce the physical impacts of human activities such as water quality deterioration and destabilization of the stream bed and banks. The mining activity near Jemberau River can destabilize channel form, which may result in sedimentation at the downstream...

Full description

Bibliographic Details
Main Authors: Norlida, Mohd Dom, Sharina, Sulaiman, Norashikin, Ahmad Kamal, Saerahany Legori, Ibrahim, Nadiatul Adilah, Ahmad Abdul Ghani, Junaidah, Ariffin
Format: Article
Language:English
Published: Department of Irrigation and Drainage, Ministry of Natural Resources and Environment Malaysia 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/21743/
http://umpir.ump.edu.my/id/eprint/21743/1/Sediment%20load%20analysis%20in%20Lake%20Chini.pdf
_version_ 1848821421134839808
author Norlida, Mohd Dom
Sharina, Sulaiman
Norashikin, Ahmad Kamal
Saerahany Legori, Ibrahim
Nadiatul Adilah, Ahmad Abdul Ghani
Junaidah, Ariffin
author_facet Norlida, Mohd Dom
Sharina, Sulaiman
Norashikin, Ahmad Kamal
Saerahany Legori, Ibrahim
Nadiatul Adilah, Ahmad Abdul Ghani
Junaidah, Ariffin
author_sort Norlida, Mohd Dom
building UMP Institutional Repository
collection Online Access
description This study is significant to be conducted to reduce the physical impacts of human activities such as water quality deterioration and destabilization of the stream bed and banks. The mining activity near Jemberau River can destabilize channel form, which may result in sedimentation at the downstream area. The rate of sediment discharge and the rate of water quality deterioration are expected to increase near the mining area close to Jemberau River. Bedload and suspended load sampling were carried out in the dry and wet months from September to December 2016. High suspended solid concentrations (SSC) were recorded in Chini and Jemberau Rivers especially during the wet months. Total Maximum Daily Load (TMDL) estimation for 5, 10, 15 and 20 years are also given.
first_indexed 2025-11-15T02:25:04Z
format Article
id ump-21743
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:25:04Z
publishDate 2016
publisher Department of Irrigation and Drainage, Ministry of Natural Resources and Environment Malaysia
recordtype eprints
repository_type Digital Repository
spelling ump-217432018-07-24T02:52:22Z http://umpir.ump.edu.my/id/eprint/21743/ Sediment load analysis in Lake Chini Norlida, Mohd Dom Sharina, Sulaiman Norashikin, Ahmad Kamal Saerahany Legori, Ibrahim Nadiatul Adilah, Ahmad Abdul Ghani Junaidah, Ariffin TA Engineering (General). Civil engineering (General) This study is significant to be conducted to reduce the physical impacts of human activities such as water quality deterioration and destabilization of the stream bed and banks. The mining activity near Jemberau River can destabilize channel form, which may result in sedimentation at the downstream area. The rate of sediment discharge and the rate of water quality deterioration are expected to increase near the mining area close to Jemberau River. Bedload and suspended load sampling were carried out in the dry and wet months from September to December 2016. High suspended solid concentrations (SSC) were recorded in Chini and Jemberau Rivers especially during the wet months. Total Maximum Daily Load (TMDL) estimation for 5, 10, 15 and 20 years are also given. Department of Irrigation and Drainage, Ministry of Natural Resources and Environment Malaysia 2016 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/21743/1/Sediment%20load%20analysis%20in%20Lake%20Chini.pdf Norlida, Mohd Dom and Sharina, Sulaiman and Norashikin, Ahmad Kamal and Saerahany Legori, Ibrahim and Nadiatul Adilah, Ahmad Abdul Ghani and Junaidah, Ariffin (2016) Sediment load analysis in Lake Chini. The Journal of Water Resources Management (JoWRM), 1 (5). pp. 46-57. ISSN 2289-1080. (Published) https://anyflip.com/fxvu/dodc
spellingShingle TA Engineering (General). Civil engineering (General)
Norlida, Mohd Dom
Sharina, Sulaiman
Norashikin, Ahmad Kamal
Saerahany Legori, Ibrahim
Nadiatul Adilah, Ahmad Abdul Ghani
Junaidah, Ariffin
Sediment load analysis in Lake Chini
title Sediment load analysis in Lake Chini
title_full Sediment load analysis in Lake Chini
title_fullStr Sediment load analysis in Lake Chini
title_full_unstemmed Sediment load analysis in Lake Chini
title_short Sediment load analysis in Lake Chini
title_sort sediment load analysis in lake chini
topic TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/21743/
http://umpir.ump.edu.my/id/eprint/21743/
http://umpir.ump.edu.my/id/eprint/21743/1/Sediment%20load%20analysis%20in%20Lake%20Chini.pdf