Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area

Alternative water sources using groundwater has increasingly demand in recent years. In the past, proper and systematic study of groundwater potential was varies due to several constraints. Conventionally, tube well point was drilled based on subjective judgment of several parties which may lead to...

Full description

Bibliographic Details
Main Authors: Hazreek, Z.A.M, Raqib, A.G.A., Aziman, M., Azhar, A.T.S., Khaidir, A.T.M., Fairus, Y.M., Rosli, S., Mohd Fakhrurrazi, Ishak, Izzaty, R.A.
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing Ltd 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/20631/
http://umpir.ump.edu.my/id/eprint/20631/1/Premilinary%20Groundwater%20Assessment.pdf
_version_ 1848821155760177152
author Hazreek, Z.A.M
Raqib, A.G.A.
Aziman, M.
Azhar, A.T.S.
Khaidir, A.T.M.
Fairus, Y.M.
Rosli, S.
Mohd Fakhrurrazi, Ishak
Izzaty, R.A.
author_facet Hazreek, Z.A.M
Raqib, A.G.A.
Aziman, M.
Azhar, A.T.S.
Khaidir, A.T.M.
Fairus, Y.M.
Rosli, S.
Mohd Fakhrurrazi, Ishak
Izzaty, R.A.
author_sort Hazreek, Z.A.M
building UMP Institutional Repository
collection Online Access
description Alternative water sources using groundwater has increasingly demand in recent years. In the past, proper and systematic study of groundwater potential was varies due to several constraints. Conventionally, tube well point was drilled based on subjective judgment of several parties which may lead to the uncertainties of the project success. Hence, this study performed an electrical method to investigate the groundwater potential at quaternary deposits area particularly using resistivity and induced polarization technique. Electrical method was performed using ABEM SAS4000 equipment based on pole dipole array and 2.5 m electrode spacing. Resistivity raw data was analyzed using RES2DINV software. It was found that groundwater was able to be detected based on resistivity and chargeability values which varied at 10 – 100 Ωm and 0 – 1 ms respectively. Moreover, suitable location of tube well was able to be proposed which located at 80 m from the first survey electrode in west direction. Verification of both electrical results with established references has shown some good agreement thus able to convince the result reliability. Hence, the establishment of electrical method in preliminary groundwater assessment was able to assist several parties in term groundwater prospective at study area which efficient in term of cost, time, data coverage and sustainability.
first_indexed 2025-11-15T02:20:51Z
format Conference or Workshop Item
id ump-20631
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T02:20:51Z
publishDate 2017
publisher IOP Publishing Ltd
recordtype eprints
repository_type Digital Repository
spelling ump-206312018-08-03T04:14:24Z http://umpir.ump.edu.my/id/eprint/20631/ Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area Hazreek, Z.A.M Raqib, A.G.A. Aziman, M. Azhar, A.T.S. Khaidir, A.T.M. Fairus, Y.M. Rosli, S. Mohd Fakhrurrazi, Ishak Izzaty, R.A. TA Engineering (General). Civil engineering (General) Alternative water sources using groundwater has increasingly demand in recent years. In the past, proper and systematic study of groundwater potential was varies due to several constraints. Conventionally, tube well point was drilled based on subjective judgment of several parties which may lead to the uncertainties of the project success. Hence, this study performed an electrical method to investigate the groundwater potential at quaternary deposits area particularly using resistivity and induced polarization technique. Electrical method was performed using ABEM SAS4000 equipment based on pole dipole array and 2.5 m electrode spacing. Resistivity raw data was analyzed using RES2DINV software. It was found that groundwater was able to be detected based on resistivity and chargeability values which varied at 10 – 100 Ωm and 0 – 1 ms respectively. Moreover, suitable location of tube well was able to be proposed which located at 80 m from the first survey electrode in west direction. Verification of both electrical results with established references has shown some good agreement thus able to convince the result reliability. Hence, the establishment of electrical method in preliminary groundwater assessment was able to assist several parties in term groundwater prospective at study area which efficient in term of cost, time, data coverage and sustainability. IOP Publishing Ltd 2017-08 Conference or Workshop Item PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/20631/1/Premilinary%20Groundwater%20Assessment.pdf Hazreek, Z.A.M and Raqib, A.G.A. and Aziman, M. and Azhar, A.T.S. and Khaidir, A.T.M. and Fairus, Y.M. and Rosli, S. and Mohd Fakhrurrazi, Ishak and Izzaty, R.A. (2017) Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area. In: 3rd and 4th International Engineering Research and Innovation Symposium, IRIS 2017 , 6–7 May 2017 , Melaka, Malaysia. pp. 1-10., 226 (1). ISSN 1757-8981(print); 1757-899X(online) (Published) http://iopscience.iop.org/article/10.1088/1757-899X/226/1/012042/pdf
spellingShingle TA Engineering (General). Civil engineering (General)
Hazreek, Z.A.M
Raqib, A.G.A.
Aziman, M.
Azhar, A.T.S.
Khaidir, A.T.M.
Fairus, Y.M.
Rosli, S.
Mohd Fakhrurrazi, Ishak
Izzaty, R.A.
Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
title Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
title_full Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
title_fullStr Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
title_full_unstemmed Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
title_short Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
title_sort preliminary groundwater assessment using electrical method at quaternary deposits area
topic TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/20631/
http://umpir.ump.edu.my/id/eprint/20631/
http://umpir.ump.edu.my/id/eprint/20631/1/Premilinary%20Groundwater%20Assessment.pdf